Noosa Mining Conference Presentation
Released
Released
Announcement PDF
ASX Announcement
14 November 2024
Noosa Mining Conference Presentation
Buru Energy Limited (Buru, Company) (ASX: BRU), is pleased to provide the attached
presentation made today by CEO Thomas Nador at the Noosa Mining Conference.
Buru’s CEO Thomas Nador commented:
“The Company’s focus is to develop its Rafael conventional gas and condensate discovery.
The project will generate long term cash flow and growth. Rafael gas is our core development
priority and it guides all our activities and resource allocation.”
Authorisation
This ASX announcement has been authorised for release by the Chair of Buru Energy.
For further information, visit www.buruenergy.com or contact:
Thomas Nador, Chief Executive Officer
Telephone: +61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
1
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
ASX:BRU
A focused energy company
Building a compelling foundation
Kimberley gas business which
generates long tern cash flow + growth
Presented at the Noosa Mining Conference
Thomas Z Nador, CEO
14 November 2024
Disclaimer
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”)
and has been authorised for the intended purpose by the Non-Executive Chair of Buru
Energy Limited.
This presentation contains certain statements which may constitute "forward-looking
statements". It is believed that the expectations reflected in these statements are
reasonable but they may be affected by a variety of variables and changes in
underlying assumptions which could cause actual results or trends to differ materially,
including, but not limited to: price fluctuations, actual demand, currency fluctuations,
drilling and production results, reserve and resource estimates, loss of market,
industry competition, environmental risks, physical risks, legislative, fiscal and
regulatory developments, economic and financial market conditions in various
countries and regions, political risks, project delays or advancements, approvals and
cost estimates. All of Buru’s operations and activities are subject to joint venture,
regulatory and other approvals and their timing and order may also be affected by
weather, availability of equipment and materials and land access arrangements,
including native title arrangements. Although Buru believes that the expectations
raised in this presentation are reasonable there can be no certainty that the events or
operations described in this presentation will occur in the timeframe or order
presented or at all.
Buru is not aware of any new information or data that materially affects the
information included in this presentation and all material assumptions and technical
parameters underpinning the estimates in this presentation continue to apply and
have not materially changed. The probabilistic method was used to prepare the
estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other
person that the material contained in this presentation will be achieved or prove to be
correct. Except for statutory liability which cannot be excluded, each of Buru, its
officers, employees and advisers expressly disclaims any responsibility for the accuracy
or completeness of the material contained in this presentation and excludes all
liability whatsoever (including in negligence) for any loss or damage which may be
suffered by any person as a consequence if any information in this presentation or any
error or omission there from. Neither Buru nor any other person accepts any
responsibility to update any person regarding any inaccuracy, omission or change in
information in this presentation or any other information made available to a person
nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
There are numerous uncertainties inherent in estimating reserves and resources, and
in projecting future production, development expenditures, operating expenses and
cash flows. Oil and gas reserve engineering and resource assessment must be
recognised as a subjective process of estimating subsurface accumulations of oil and
gas that cannot be measured in an exact way. All contingent resources and
prospective resources presented in this presentation are pursuant to the Company’s
ASX release on 17 June 2024 and 26 July 2024 respectively. The estimates of
contingent and prospective resources included in this presentation have been
prepared in accordance with the definitions and guidelines set forth in the SPE PRMS.
2
14 Nov 2024 – NMI Conference
BURU ENERGY – FOCUSED ON DEVELOPING A REGIONALLY SIGNIFICANT GAS BUSINESS
Kimberley energy system is changing
Kimberley energy market currently relies on
trucked or imported gas and diesel
WA Government: plans to overhaul the Kimberley
energy system by 2028 and increase renewables.
Gas: current demand 9TJ/d – trucked up to 1,400km
Gas is a critical firming fuel for electricity.
from the Pilbara.
− cost, security and transport emissions challenges.
Diesel: current imports to Broome >1.2mmbbls per year.
The
Challenge
Right
Time
Rafael: the only proven conventional gas and liquids
resource in the Kimberley – no local competition.
1C resource: can supply the region for 20 years with
improved cost, security & sustainability metrics.
− FID in 2025 and first production in 2H 2027.
Project off taker and partner discussions underway.
− over 120 remote communities rely on diesel.
Rafael - a local gas & condensate
project
Rafael Project timeline aligns with 2028
The
Solution
Project funding – multiple options
Funding
Northern Australia Infrastructure Facility (NAIF)
Partnering with facility owner (tariff model)
Gas and condensate pre-sales
Debt and equity markets
Condensate: Opportunity to use as a diesel alternative.
…… building a compelling foundation Kimberley gas business, long-term cash flow + growth
3
14 Nov 2024 – NMI Conference
ENABLING THE TRANSFORMATION OF THE KIMBERLEY ENERGY SYSTEM
Rafael – significant advantages and benefits compared to the alternatives
Existing trucked /
imported gas and diesel
Proximity to market
840 - 1,400 km
Kimberley
Energy Market
Rafael gas and
condensate
90 – 500 km
Diesel
LNG
840 km
1,400 km
Delivered cost
Transport emissions
CO2
CO2
WESTERN AUSTRALIA
Regional development
New market opportunities
Synergy with renewables
Gas Pipeline Network
…… Buru has an important role to play as a future regional energy supplier
4
14 Nov 2024 – NMI Conference
THE RAFAEL PROJECT
Gas to power generation and mining with condensate for local diesel replacement
Objective
Build a compelling foundation Kimberley gas business to generate long
term cash flow + growth via the development of a small footprint, scalable
LNG and condensate supply project.
Interest
100% Buru Energy
Resource
1C (Low Case) Contingent Resource 85 Bscf gas & 1.8MMStb condensate
Key Project
Parameters
RAFAEL
PROJECT
First Production:
2027
Project Life:
20 years
No. of wells:
2
Gas flowrate:
14 mmscf/d (initial)
Product streams:
LNG (0.1 MTPA) and Condensate (250 bopd)
Small scale LNG facility at Rafael 1 wellsite, with liquids separation.
Indicative basis
LNG trucking to Broome and regional demand centres
of design
Condensate trucking to regional communities for diesel replacement.
Gas and condensate marketing / offtake agreements
FEED entry early 2025
Forward Plan
FID 4Q 2025
First Production 2H 2027.
5
Indicative Rafael Project
Drill second Rafael well in 2025. Re-test/recomplete Rafael 1 well as
producer.
…… proven technology, small footprint
14 Nov 2024 – NMI Conference
RAFAEL PROJECT TIMELINE
Small scale LNG plant and condensate stripping – low cost, proven solution for remote power generation
2023
Activity
2024
2025
2026
2027
2028
2029
VALUE CREATION / DE-RISKING
Acquire &
Process
Rafael 3D Seismic Survey
Data interpretation
Interpret results
Confirm adequacy of 1C volume for Phase Project
The Rafael Project
Concept Screening
Technical Definition
Gas & Condensate Offtake Marketing
Feasibility
Studies
Basis of
Design
Concept
Definition
Market
testing
FEED
LOIs/MoUs for Binding
GSAs
Gas & Cond.
Final Investment Decision
FID
VALUE DELIVERY
Recomplete Rafael 1 & Drill Rafael B
Development Drilling
First Gas
Engineering, Procurement,
Construction (18 MONTHS)
Project Execution
Timeline is indicative and is subject to capital availability, future discussions with
Production
potential asset partners, offtake arrangements , land access and regulatory approvals.
NOW
6
14 Nov 2024 – NMI Conference
PURSUE UNGANI PRODUCTION RESTART FOR NEAR TERM CASHFLOW
Reinvigorate and extend asset life with drilling of high potential oil exploration well (Mars)
Objective
Re-establish revenues from oil business via a potential domestic offtake
Near-field exploration to extend production beyond current field life.
Interest
100% Buru Energy
Mars
Prospective
Resource1
Low 0.74 MMstb
Mid
2.80 MMstb
High 6.20 MMStb
The Ungani Oilfield has produced 2.3 million bbls to date
Progress Ungani Oilfield restart as early as possible, pending
confirmation of a potential domestic commercialisation route.
Forward Plan
Target restart 2025 with initial daily production of 400 bopd.
Mature plans to drill the Mars prospect (9km north of Ungani) as
potential backfill and growth at the Ungani Production Facility.
1 Prospective Resources relate to the estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) and relate to undiscovered accumulations. These estimates have both an associated risk of discovery
and a risk of development. Further exploration, appraisal and evaluation is required to determine the existence of a significant
quantity of potentially moveable hydrocarbons. Refer to Buru ASX Release 17 June 2024 for full definitions and disclosures. Buru is not
aware of any new information or data that materially affects this assessment and that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
Mars oil prospect
7
14 Nov 2024 – NMI Conference
BURU – THE FOCUSED ENERGY COMPANY
Uniquely positioned to address the energy trilemma of price, security and sustainability for the Kimberley
1
2
3
100% owner of
Rafael - the only
proven significant
conventional
onshore gas and
condensate
resource in the
Kimberley region
WA.
Clear pathway for a
Kimberley centred
foundation gas
business with longterm cashflows
from 2027 plus
growth.
Unique
opportunity for
Rafael condensate
as diesel fuel
substitute for the
Kimberley/Pilbara.
4
5
Near term
cashflow
opportunity with
oil production from
existing Ungani
Oilfield.
The team and
skills to deliver.
…… building a compelling foundation Kimberley gas business, long-term cash flow + growth
8
14 Nov 2024 – NMI Conference
ASX:BRU
Buru Energy Limited
Thomas Nador, CEO
Level 2, 16 Ord Street
West Perth Western Australia 6005
PO Box 1903
West Perth WA 6872
Phone: 1800 337 330
Email: info@buruenergy.com
Web: buruenergy.com
14 November 2024
Thank - you
CORPORATE OVERVIEW
Significant change - clear focus on building the compelling foundation Kimberley gas business
Share Price Information ASX:BRU
RAFAEL
PROJECT
29-Oct-24
01-Oct-24
03-Sep-24
06-Aug-24
09-Jul-24
11-Jun-24
14-May-24
16-Apr-24
19-Mar-24
20-Feb-24
23-Jan-24
26-Dec-23
28-Nov-23
CANNING
BASIN
31-Oct-23
$0.18
$0.16
$0.14
$0.12
$0.10
$0.08
$0.06
$0.04
$0.02
$0.00
DAMPIER
PENINSULA
Share price
Capital Structure
Shareholder by Type2
Shares on issue
million
774.3
Market capitalisation
$ million
35.0
Cash1
$ million
7.4
Debt
$ million
nil
12 month high
cents per share
16.0
12 month low
cents per share
4.3
11.3%
1 as at 30 September 2024 and prior to receipt of $6.7 million (before costs) from capital raising.
1.2%
0.4%
Broker Coverage and Research
Private
Domestic
Institutions
87.1%
Foreign
Institutions
Directors &
Employees
2 as at 30 September 2024.
10
14 Nov 2024 – NMI Conference
BURU ENERGY BOARD AND MANAGEMENT
New leadership with deep industry experience and proven track record
Mr David Maxwell
Thomas Nador
Independent Non-Executive Chair
CEO
>35yrs strategy, gas commercialisation, risk and
asset management
>25yrs strategy, resource development, commercial
Ms Joanne Williams
Independent Non-Executive Director
>25yrs technical, engineering
Paul Bird
CFO and Company Secretary
>25yrs finance, governance
Grant McMurtrie
GM Exploration – Hydrocarbon & New Energy
Mr Malcolm King
>25yrs play based exploration, remote sensing, new ventures
Independent Non-Executive Director
Rachel McIntyre
>35yrs commercial, exploration, operations
Development Manager
>15yrs geoscience, project development, CCS
11
Mr Robert Willes
Rosie Johnstone
Independent Non-Executive Director
Head of CCS Solutions - GeoVault
>35yrs finance, commercial, M&A
>25yrs exploration, CCS Technical Authority
14 Nov 2024 – NMI Conference
NON-CORE ASSETS
Portfolio of assets for near term commercialisation
Conventional gas and oil targets in the Canning Basin
12
Exploration for natural Helium and Hydrogen across WA, SA and TAS
New prospects and play insights from 2021 and 2023 seismic campaigns.
16 SPA/PELA/ELA across 65,450 km2 with early stage exploration programs.
Play diversity that includes the proven Ungani Dolomite Play, clastic plays
and emerging salt plays with proven petroleum systems.
Granting of permits subject to valid land access agreements under the Native Title
Act 1993.
Staircase of sizable prospects and leads within tie-back distance to Rafael
(~2 tcf unrisked).
Developing expertise in identifying hydrogen accumulations by their surface
expressions through Buru exploration programs and in co-operation with CSIRO.
14 Nov 2024 – NMI Conference