Corporate Presentation
Released
Released
Announcement PDF
ASX Release
17 July 2015
ABN 71 130 651 437
Level 2, 88 William Street
Perth, Western Australia 6000
Ph: +61 8 9215 1800
Fax: +61 8 9215 1899
www.buruenergy.com
Corporate Presentation
Please find attached Buru Energy Limited’s (ASX: BRU) latest corporate presentation.
This presentation and further information on Buru Energy’s current and future activities is available on the Company’s
website at www.buruenergy.com.
For investor inquiries please contact Buru Energy:
Telephone:
+61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
Media Enquiries:
Paul Armstrong
Read Corporate
+61 8 9388 1474/ 0421 619 084
About Buru Energy
Buru Energy Limited (ASX: BRU, S&P/ASX300) is a Western Australian oil and gas exploration and production
company headquartered in Perth with an operational office in Broome. The Company’s petroleum assets and
tenements are located onshore in the Canning Basin in the southwest Kimberley region of Western Australia. Its
flagship high quality conventional Ungani oil field project is owned in 50/50 joint venture with Mitsubishi Corporation. As
well as Ungani, the Company’s portfolio includes potentially world class tight gas resources.
The company’s goal is to deliver material benefits to its shareholders, the State of Western Australia, the Traditional
Owners of the areas in which it operates, and the Kimberley community, by successfully exploring for and developing
the petroleum resources of the Canning Basin in an environmentally and culturally sensitive manner.
1
Delivering Western Australia’s
Energy Future
Noosa Mining & Exploration Conference
17 July 2015
Mr Eric Streitberg, Executive Chairman
www.buruenergy.com
Summary
Who are we
What do we do
The assets
2015 Program
Value drivers
2
Buru Energy - Who are we
Listed Australian company (ASX: BRU)
Very focused and unique whole of basin position (~45,000 sq kms net)
Highly prospective and underexplored basin
Generally 50% equity and operator. Major partners Mitsubishi & Quadrant
Multiple play types with high potential
Extensive portfolio of prospects and opportunities
Commercial oil production providing cash flow
Well funded and very active 2015 program
Where do we fit in the sector
3
Corporate Overview
6 month share price
Company
Formed
2008
Ticker
ASX:BRU
Index
S&P/ASX300
Shares on issue
340 million
Share price
~$0.41
Market Cap
~$140 million
Cash on hand
~$41.9 million (at 30 June)
Net Acreage
45,620 sq km
11.2 million acres
Key Partners
Mitsubishi, Quadrant
Board
Eric Streitberg
Executive Chairman
Eve Howell
Non Executive Director
Robert Willes
Non Executive Director
4
Focused on high value opportunities!
2007 - Unique basin wide position established
(one off opportunity)
2010 - Farmed out to Mitsubishi (~$150mm deal)
2010-2013 - Identified and quantified potential world class tight gas
opportunity
2011/2102 - Discovered and appraised Ungani Oilfield, first significant
discovery in the basin for 30 years
2015 - Ungani developed and brought into commercial production.
Major exploration and appraisal program underway
5
5
2015 Focus
Unique window of opportunity for Buru Energy
Focus on core areas that have the highest prospectivity and lowest risk,
Well funded, unique low cost operating window
Extensive prospect portfolio
Value delivery
Current climate ideal for realigning the business back to basics
Step by step approach through concluding agreements and renegotiations
Value and costs focused management team
Costs reductions provide window of opportunity
DDH Rig 31
Drilling costs more than halved - a revolution in technology and process
Reductions made possible by stepping away from “old” oilfield technology
Cost reductions and efficiency from US unconventional and Australian CSG
drilling practices
Contractor confidence, skills and experience transfers performance risk to the
contractor where it belongs and can be properly managed
Two rigs contracted Atlas 2 and DDH1 Rig 31
Support services also rationalised
Technological revolution to keep up with cost pressures
Downsizing of equipment to onshore fit for purpose by independent contractors
Atlas Rig 2
6
Ungani Oilfield
Commercial production commenced – cash flow being generated
Excellent reservoir performance - confirmed by Extended Production Test and
current initial flows
Production during EPT ~470,000 bbls (gross - Buru 50%)
Commercial startup process completed
Traditional owner agreements: completed for Production Licences
Production Licences: granted
Consent to Operate: FMP, safety case, environmental plans etc, approved
Start date: 16 July 2015
Completed Funding Agreement for Capital costs with Mitsubishi
Production targets
Initial startup at 1,250 bopd - next target 3,000 bopd
Resources
Buru’s internal resource estimates
Buru’s view of the Contingent Resources of the Ungani Field are as follows, in
millions of barrels - Buru’s share is 50% of the following estimates
Ungani Oilfield Original Contingent Recoverable
Resources (100%WI, MMstb)
1C
2C
3C
3.9
6.1
9.4
Note: The full contingent
resource statement in
accordance with ASX listing
rules was set out in Buru
ASX release of 28 April
2015 “Operations Update
and AGM presentation”
7
Oil: Conventional Prospects
Extensive high prospectivity portfolio
Ungani Trend
Conventional vuggy dolomite reservoir discovered in 2011
Structures are readily imaged by geophysics
Trend covers over +120 kms by 40 kms (+1 million acres)
First exploration drilling underway since Ungani North oil
discovery in 2012
2015 program
Detailed mapping of the whole trend has identified an
extensive prospect portfolio
Recent Jackaroo 3D has identified numerous prospects,
relatively small but low risk. 2015 drilling program will test
at least one of these from the 3D
Other wells will test the regional extent of the play
First well - Praslin 1 just spudded - in Jackaroo 3D
Following wells: Victory 1, Senagi 1, Ungani appraisal
Other Conventional Oil Plays to be confirmed
Paradise area - Ophir 1 - updip test of Paradise oil
discovery planned, many additional prospects in that area
Buru 100% - Blina area reef test
8
Laurel Tight Gas regional resource
Resource
+100 TCF in the BCGS and +1Bn bbls oil (gross) - with 47 TCF
gas net to Buru (**independent estimates of prospective resources)
Tight Gas Pilot Exploration (Fracc) Program
Regulatory Approvals
WA Environment Minister upheld EPA decision that:
Buru’s “small scale, limited duration ‘proof of concept’ exploration
proposal is unlikely to have a significant effect on the environment”
DMP approvals subsequently received for Environment Plan,
Operational Plan and Safety Plan
Traditional Owners
Traditional owner groups independent scientific advice
supported the EPA conclusions
Agreement for eastern wells program received from Noonkanbah
community, preliminary work carried out in late 2014
Yawuru community discussions ongoing
Nyikina Mangala community independent review process in
progress (TGS program is not on NM areas)
Operational
Preliminary work completed for program
Contracts reviewed and agreed in light of industry downturn with
significant cost reductions
Timing dependent on a number of factors
Prospective Resources (net to Buru)
Product
Low Case
(MMbbl/TCF)
Best Estimate
Case
High Case
(MMbbl/TCF)
(MMbbl/TCF)
Condensate
226
1,177
4,717
Natural Gas
12
47
150
Values have been rounded to the nearest TCF and MMbbl
** Refer to ASX Release dated 8 February 2013 (Evaluation date). Deterministic method
used.
The estimated quantities of petroleum that may potentially be recovered by the application of
a future development project(s) relate to undiscovered accumulations. These estimates have
both an associated risk of discovery and a risk of development. Further exploration appraisal
and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
9
Conventional Gas (2016 program)
New Geological Concepts Enhance Prospectivity
Work over the last two years has defined much higher
conventional gas potential than previously recognised
Ungani style prospects in the gas window particularly
attractive
Possible oil as well as gas given the high oil generative
capacity of the section
Upside
Conventional gas projects cheaper and quicker to develop
Prospects of a scale to support pipeline development or
local power and petrochemical projects
Current portfolio contains numerous prospects
Additional upside and prospects likely to be defined by 2015
3D program over Bickley and Yakka Munga and 2D over
Raphael
Evaluation program
Requires bigger rig than in use for 2015 program
Will need to drill several prospects to justify rig mobilisation
and give higher chance of success
Ideal farmout program
10
2015 Program – Indicative Timeline
Q2/2015
Q4/2015
4Q2012
UNGANI
DRILLING
Geophysics
Q3/2015
Production
Facilities upgrade and Approvals
UN test
U3 test
Atlas
Rig 2
DDH1
Rig 31
Praslin 1
Olympic
AGG
Ungani
Trend3
Senagi
HT
SEISMIC
AIRBORNE
GRAVITY
Ungani
Trend2
RAPHAEL
Wright
Emanuel
Ophir
YM 3D
Note: Note that drilling order of the Ungani trend wells is dependent on operational requirements to optimise the program logistics
and the most efficient rig utilisation
All of Buru Energy’s operations and activities are subject to joint venture, regulatory and other approvals and their timing and order may
also be affected by weather, availability of equipment and materials and land access arrangements, including native title arrangements.
The order of drilling of these wells and the timing of acquisition of seismic is also dependent on operational matters.
11
Funding
Current Situation
Cash end of June quarter ~$41.9M, budgeting for ~$26M at year end
Ungani development
Relatively low cost - main cost is wells
Broome Export facility - off balance sheet funding
Cash flow positive at current oil prices
Mitsubishi Funding agreement reset ($27.5M) with full carry through end 2016 of up to
$9M Buru share of capital expenditure with production hurdles in future tranches
Oil exploration program
Olympic 1 well completed, fully funded via Quadrant farmin
Ungani appraisal included in the MC funding for Ungani development
Ungani trend oil wells funded from internal resources
2D seismic funded internally
3D seismic funded internally
Laurel Tight Gas pilot program
Funded from Alcoa escrow agreement
Alcoa agreement being renegotiated
Forward Funding
Oil exploration
Wider exploration via excess cash from Ungani and internal sources
Conventional Gas exploration
Funded through farmout/internal resources
Tight Gas appraisal and development
Laurel farm-in partner planned to be introduced after flow testing
12
Buru Energy value drivers
Pivotal moment for the Buru Energy oil business
Funding in place
Traditional Owner agreements secured
Ungani commenced commercial production
Costs driven down
5 to 7 well oil exploration program commenced May 2015
Significantly increased conventional gas potential
Tight gas fundamentals remain strong
3D and 2D seismic and AGG to develop additional prospects
for 2016
A very exciting program !
13
The sun rises on the Canning Basin
14
Important Notice and Disclaimer
Disclaimer
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru Energy"). This presentation contains certain statements which may constitute
"forward-looking statements". It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in
underlying assumptions which could cause actual results or trends to differ materially, including, but not limited to:
price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve and resource estimates, loss of market, industry competition, environmental
risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries and regions, political risks, project delays or
advancements, approvals and cost estimates.
All of Buru Energy’s operations and activities are subject to joint venture, regulatory and other approvals and their timing and order may also be affected by weather, availability
of equipment and materials and land access arrangements, including native title arrangements.
Although Buru Energy believes that the expectations raised in this presentation are reasonable there can be no certainty that the events or operations described in this
presentation will occur in the timeframe or order presented or at all.
No representation or warranty, expressed or implied, is made by Buru Energy or any other person that the material contained in this presentation will be achieved or prove to
be correct. Except for statutory liability which cannot be excluded, each of Buru Energy, its officers, employees and advisers expressly disclaims any responsibility for the
accuracy or completeness of the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be
suffered by any person as a consequence of any information in this presentation or any error or omission there from. Neither Buru Energy nor any other person accepts any
responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor
any obligation to furnish the person with any further information.
All dates in this presentation are for calendar years. All references to $ are in Australian currency, unless stated otherwise.
Competent Person’s Statements
Information in this presentation related to petroleum resources of the Ungani Oilfield is based on information compiled by Dr Stuart Weston who is a consultant to Buru Energy
Limited. Dr Weston has over 19 years experience in petroleum exploration and engineering, holds a Bachelor Degree in Physics, a PhD in Petroleum Engineering and is a
member of SPE. Dr Weston is qualified in accordance with ASX Listing Rules and consents to the inclusion of the information in this document.
Information in this presentation related to exploration and production estimates and results is based on information compiled by Eric Streitberg who is an employee of Buru
Energy Limited. Mr Streitberg is a Fellow of the Australian Institute of Mining and Metallurgy and the Australian Institute of Company Directors, and a member and Certified
Petroleum Geologist of the American Association of Petroleum Geologists. He has over 40 years of relevant experience. Mr Streitberg is qualified in accordance with ASX
Listing Rules and consents to the inclusion of the information in this document.
15
Share your feedback
Discover