Quarterly Activities and Cash Flow Report March 2017
Released
Released
Announcement PDF
Quarterly Report
Period ended 31 March 2017
ASX: BRU
The Directors of Buru Energy Limited (Buru Energy) are pleased to provide the report for the quarter ended 31 March
2017.
Highlights
Ungani Oilfield production restart proceeding as planned:
• Planned production restart mid-year
• Ungani oil to be trucked to Wyndham and stored in CGL’s 80,000 barrel tank;
• Oil to be exported via ship to SE Asian or local markets.
• Operational activity on track:
– Contracts signed for construction activity
– Contracts signed for Wyndham Tank 10 utilisation
– Negotiations with preferred trucking tenderers progressing
Gas Project:
• The Yungngora (Noonkanbah) ILUA has been registered with the National Native Title Tribunal
• SPA to the south of EP371 expected to be granted shortly
Corporate:
• Cash balance of $19.8 million at the end of the quarter (December 2016: $21.0m)
• AGM to be held on 31 May 2017 in Perth
Production and Development
Ungani Oilfield
During the quarter, the Joint Venture agreed a restart plan for the Ungani Oilfield, which had been shut-in since
January 2016. Production is planned to recommence mid-year, initially on natural flow at a target rate of 1,200
barrels per day. The crude oil will be trucked from the Ungani Oilfield to Wyndham, stored in CGL’s 80,000 barrel
tank and exported via ship to SE Asian or local markets.
1
Previous oil export from Wyndham was through a smaller 30,000 barrel tank, and the larger 80,000 barrel tank to be
used for the restart brings significant economies of scale and commercial benefits through access to larger ships on
spot charter, rather than the previously used smaller time charter ships.
80,000 barrel and 30,000 barrel tanks at Wyndham
The contract documentation for the use of Wyndham Port has been executed, including the Crude Oil Storage and
Services Agreement (COSSA) with Cambridge Gulf Limited (CGL) the owners of the storage tanks. The contract
with the engineering group that will undertake the upgrades at the port, DRA Industries Pty Ltd (DRA), that includes
an element of vendor financing has also been executed. This work is underway and includes the installation of a
mixer system which is commonly used for oil storage tanks with long crude residence times.
Wyndham Port ship loading
Wyndham Port wet season panorama
2
Trucking bids have been received from several
contractors. Discussions with short listed tenderers
are progressing well with contract award expected to
be made shortly.
Some minor modifications at the Ungani Oilfield for the
start-up have also commenced with the principal work
being installation of the produced water injection
system at the Ungani Far West 1 well to allow reinjection of produced water into the lower water
bearing zone in the well. The other work on the field
prior to startup includes some general operational
streamlining, the installation of a new load out system
that was purchased prior to the shut-in last year, and
an upgrade to the access road.
Trucking during previous production period
Recruitment of operators for the restart is also going well with a strong field of local candidates under consideration.
The second phase of production from the field will involve the installation of downhole pumps and their associated
control and power systems. When the pumps are installed there will also be an upgrade to the fluid handling system,
including additional tankage. Planning for this phase has essentially been completed. The timing is dependent on
the well performance and the availability of a workover rig to run the pumps into the wells, but is anticipated to occur
before the end of the year. Depending on well performance, the pumps will provide the opportunity to increase oil
production from the wells.
Ungani production tanks
Wet season panorama of Ungani Oilfield
Blina and Sundown Oilfields
The Blina and Sundown Oilfields remained shut-in during the quarter with maintenance and well inspections
continuing.
3
Exploration and Appraisal
Storage Tanks at Ungani Production Field
Tight Gas Exploration and Appraisal Program
The ILUA signed with the Noonkanbah people last year was registered on 17 March 2017 as the Yungngora ILUA with
the National Native Title Tribunal. This is a significant step forward as it provides certainty for both parties. Together
with the Warlangurru LAUA agreement, it provides a mutually beneficial pathway for the future development of the gas
resources on the EP 371 permit in the Valhalla and Asgard area.
The Joint Venture has also applied for the Declaration of a Location over this part of the accumulation as a very
important step to obtaining further tenure over the area.
Special Prospecting Authority
In July 2016, the EP371 JV parties lodged
application STP-SPA-0065 for a special
prospecting authority with acreage option
(SPA-AO). The Company has been
advised that the required Native Title
processes have now been completed and
the grant of the SPA is expected shortly.
The SPA covers the area to the south of EP
371 where it is interpreted there is the
extension
of
the
Valhalla/Asgard
accumulation. The JV intend to undertake
the Fitzroy Airborne PTEM Survey over this
area once the SPA is formally granted.
Corporate
2017 Work Program and Budgets
The company and its Joint Venture partners have now agreed the 2017 work programs and budgets for the various
exploration permits which include the minimum work obligations of exploration well in EP428 and a well test /
stimulation in EP436.
Discussions and planning for the forward program are continuing and depending on available funding, the work
programs may be expanded to include additional exploration wells.
Mitsubishi Ungani development funding agreement
The 2015 Ungani Development Funding Agreement with Mitsubishi included a carry of Buru Energy’s costs for the
development of Ungani up to a total $27.5 million, subject to a number of hurdles being achieved. Approximately
$2.5 million of the originally available $9.0 million tranche 1 funding remained unspent at the tranche 1 expiry date of
18 January 2017. The company previously reached agreement with Mitsubishi that a portion of those funds will
remain available until 18 May 2017 and during the quarter, Mitsubishi agreed that those funds would be allocated
towards the modifications at the Ungani Oilfield to be undertaken for the restart of production.
The tranche 2 funding of $7.5m remains available subject to a production hurdle of 3,000 bopd, and Tranche 3
funding of $11.0 million remains available subject to a production hurdle of 5,000 bopd.
4
Alcoa gas sales contract
As per the agreed variation to the Alcoa gas sales contract, the remaining $12.5 million liability to Alcoa is due to be
repaid on 30 June 2018.
Annual General Meeting
The Company’s Annual Report was released on 31 March 2017 and the Notice of Annual General Meeting was
released on 26 April 2017. Both documents are available on the Company’s website. The AGM of the Company will
be held in Perth on 31 May 2017.
Financial
During the March 2017 quarter the Company recorded a net cash outflow of $1.2 million and at the end of the quarter
had a cash balance of $19.8 million. The ASX Appendix 5B attached to this report contains the Company’s cash flow
statement for the quarter which is summarised as follows:
• Exploration cash outflows of $0.2 million for the quarter (December 2016: $1.0 million), comprised primarily of
the ongoing Ungani oil trend evaluation, technical TGS evaluation and desktop geological and geophysical work.
• Production / Care & Maintenance cash outflows of $0.3 million for the quarter (December 2016: $0.2 million)
which comprised Ungani oilfield care and maintenance costs as well as the costs associated with planning and
design for the restart of Ungani production for mid- year.
• Staff, administration and corporate cash outflows of $0.7 million for the quarter (December 2016: $1.0 million)
which continued to be in line with expectations.
The Company is forecasting a cash outflow of $2.6 million in the June 2017 quarter:
• Exploration cash outflows are estimated at $1.2 million and include preparation for the 2017 exploration
program, as well as ongoing expenditures relating to Ungani oil trend evaluation, technical TGS evaluation,
desktop geological and geophysical work, ongoing asset integrity and Traditional Owner engagement.
• Development cash outflows, net of Mitsubishi Ungani development funding, are estimated at $0.2 million. The
expenditures are in relation to bringing the Ungani oilfield back on production for mid-year.
• Production / Care & Maintenance cash outflows are estimated at $0.2 million in relation to the Ungani oilfield
care and maintenance costs.
• Staff, administration and corporate cash outflows are estimated at $1.0 million, consistent with previous
periods.
The Company’s cash position continues to be carefully monitored to ensure the Company can meet its commitments
as and when they fall due, and the Company continues to rationalise its operating and administrative overheads with
a continued focus on reducing operating costs and general expenditure.
Visit www.buruenergy.com for information on Buru Energy’s current and future activities.
For investor inquiries please contact Buru Energy:
Telephone:
+61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
Media Enquiries:
Paul Armstrong
Read Corporate
+61 8 9388 1474/ 0421 619 084
5
About Buru Energy
Buru Energy Limited (ASX: BRU) is a Western Australian oil and gas exploration and production company
headquartered in Perth with an operational office in Broome. The Company’s petroleum assets and tenements are
located onshore in the Canning Basin in the southwest Kimberley region of Western Australia. Its flagship high
quality conventional Ungani oilfield project is owned in 50/50 joint venture with Diamond Resources (Fitzroy) Pty Ltd.
As well as Ungani, the Company’s portfolio includes potentially world class tight gas resources.
The company’s goal is to deliver material benefits to its shareholders, the State of Western Australia, the Traditional
Owners of the areas in which it operates, and the Kimberley community, by successfully exploring for and developing
the petroleum resources of the Canning Basin in an environmentally and culturally sensitive manner.
Schedule of interests in permits as at 31 March 2017
Permit
L6*
L8
L17
L20
L21
EP129*
EP371
EP391
EP428
EP431
EP436
EP457
EP458
Type
Production licence
Production licence
Production licence
Production licence
Production licence
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Ownership
100.00%
100.00%
100.00%
50.00%
50.00%
100.00%
50.00%
50.00%
50.00%
50.00%
50.00%
37.50%
37.50%
* Excluding the Backreef Area
6
Operator
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Fitzroy Pty Ltd
Buru Fitzroy Pty Ltd
Location
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96. Origin: Appendix 8. Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
BURU ENERGY LIMITED
Quarter ended (“current quarter”)
ABN
71 130 651 437
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 March 2017
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
(212)
(212)
(4)
(4)
(c) care and maintenance
(324)
(324)
(d) staff costs
(380)
(380)
(e) administration and corporate costs
(412)
(412)
-
-
125
125
(a) exploration & evaluation
(b) development
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Research and development refund
-
-
1.8
Other
-
-
1.9
Net cash from / (used in) operating
activities
(1,207)
(1,207)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(35)
(35)
(b) tenements (see item 10)
-
-
(c) investments
-
-
(d) other non-current assets
-
-
(a) property, plant and equipment
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) property, plant and equipment
9
9
(b) tenements (see item 10)
-
-
(c) investments
-
-
(d) other
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(26)
(26)
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
-
-
3.2
Proceeds from issue of convertible notes
-
-
3.3
Proceeds from exercise of share options
-
-
3.4
Transaction costs related to issues of
shares, convertible notes or options
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of Alcoa liability
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
21,052
21,052
(1,207)
(1,207)
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(26)
(26)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
4.5
Effect of movement in exchange rates on
cash held
(1)
(1)
4.6
Cash and cash equivalents at end of
period
19,818
19,818
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,658
3,011
5.2
Call deposits
18,160
18,041
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
19,818
21,052
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to these parties included in item 1.2
232
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
-
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
N/A
Current quarter
$A'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
-
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
-
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
N/A
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
-
-
8.2
Credit standby arrangements
-
-
8.3
Other (please specify)
-
-
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
Alcoa Liability
As per the agreed variation to the Alcoa gas sales contract, the remaining $12.5 million liability to
Alcoa is due to be repaid on 30 June 2018.
$A’000
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
(200)
9.3
Production / care and maintenance
(200)
9.4
Staff costs
(500)
9.5
Administration and corporate costs
(500)
9.7
Total estimated cash outflows
(2,600)
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
+ See chapter 19 for defined terms
1 September 2016
Tenement
reference
and
location
(1,200)
Nature of interest
Interest at
beginning
of quarter
Interest
at end of
quarter
No change in interest
No change in interest
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here:
............................................................
Company secretary
Print name:
Shane McDermott
Date: 27 April 2017
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have
been financed for the past quarter and the effect on its cash position. An entity that wishes to
disclose additional information is encouraged to do so, in a note or notes included in or attached
to this report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral
Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.
+ See chapter 19 for defined terms
1 September 2016
Page 5
Share your feedback
Discover