Corporate Presentation
Released
Released
Announcement PDF
ASX Announcement
7 September 2023
Corporate Presentation
Buru Energy Limited (Buru) (ASX: BRU) is pleased to provide its latest corporate
presentation. The presentation made by the Buru Chief Executive Officer Thomas Nador at
the Good Oil Conference held today in Perth.
Authorisation
This ASX announcement has been authorised for release by the Chair of Buru Energy.
For further information, visit www.buruenergy.com or contact:
Thomas Nador, Chief Executive Officer
Telephone: +61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
1
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Energising the future of
the Kimberley
7 September 2023
Disclaimer
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”)
and has been authorised for release to the ASX by the Non-Executive Chairman.
This presentation contains certain statements which may constitute "forward-looking
statements". It is believed that the expectations reflected in these statements are
reasonable but they may be affected by a variety of variables and changes in
underlying assumptions which could cause actual results or trends to differ materially,
including, but not limited to: price fluctuations, actual demand, currency fluctuations,
drilling and production results, reserve and resource estimates, loss of market,
industry competition, environmental risks, physical risks, legislative, fiscal and
regulatory developments, economic and financial market conditions in various
countries and regions, political risks, project delays or advancements, approvals and
cost estimates. All of Buru’s operations and activities are subject to joint venture,
regulatory and other approvals and their timing and order may also be affected by
weather, availability of equipment and materials and land access arrangements,
including native title arrangements. Although Buru believes that the expectations
raised in this presentation are reasonable there can be no certainty that the events or
operations described in this presentation will occur in the timeframe or order
presented or at all.
2
There are numerous uncertainties inherent in estimating reserves and resources, and
in projecting future production, development expenditures, operating expenses and
cash flows. Oil and gas reserve engineering and resource assessment must be
recognised as a subjective process of estimating subsurface accumulations of oil and
gas that cannot be measured in an exact way. All contingent resources and
prospective resources presented in this report are pursuant to the Company’s ASX
releases of 26 April 2022 and 23 January 2023, respectively. The estimates of
contingent and prospective resources included in this Presentation have been
prepared in accordance with the definitions and guidelines set forth in the SPE PRMS.
Buru is not aware of any new information or data that materially affects the
information included in this presentation and all material assumptions and technical
parameters underpinning the estimates in this presentation continue to apply and
have not materially changed. The probabilistic method was used to prepare the
estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other
person that the material contained in this presentation will be achieved or prove to be
correct. Except for statutory liability which cannot be excluded, each of Buru, its
officers, employees and advisers expressly disclaims any responsibility for the accuracy
or completeness of the material contained in this presentation and excludes all
liability whatsoever (including in negligence) for any loss or damage which may be
suffered by any person as a consequence if any information in this presentation or any
error or omission there from. Neither Buru nor any other person accepts any
responsibility to update any person regarding any inaccuracy, omission or change in
information in this presentation or any other information made available to a person
nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
7 September 2023 | Good Oil Conference
BURU ENERGY OVERVIEW
Committed to delivering material growth as an integrated energy business
Who we are
Founded in 2008, we are an ASX listed diversified energy company focused on exploration and production
of hydrocarbon and alternative energy resources in Australia.
Buru has been the most active onshore WA explorer since its formation and is the only E&P company in the
Canning Basin with contemporary production history.
Key Stats
Shares on issue ~596 million
Market Cap ~$60 million
What we do
We explore for and develop hydrocarbon resources in the onshore Canning Basin of
Western Australia whilst participating in the new energy economy through our subsidiary
companies: GeoVault (Carbon Capture and Storage (CCS)), 2H Resources (natural
hydrogen and helium exploration), and Battmin (battery minerals exploration).
Share Price $0.10
Cash at 30 Jun‘23 ~$11 million, with no debt
+ funds received from EP510 asset sale $5m (Aug’23)
3
Our goal
Deliver material benefits to our shareholders, the Traditional Owners and communities
of the areas where we operate.
7 September 2023 | Good Oil Conference
OUR ASSETS
Strategic operated acreage position to support exploration, development and energy transition and expansion opportunities
Onshore Canning Basin, WA
Adelaide Superbasin, SA
Yulleroo
Operating Area
~22,000 km2
~30,000 km2
Granted / Pending* Permits
12 (7 EPs, 5 PLs)
8*
60-100%
100%
▪ Establish an energy hub in the Northwest of WA as part of
the Rafael gas development.
- helium exploration and
▪ Natural hydrogen and
development.
▪ Appraise, develop and commercialise the Rafael 1 gas and
condensate discovery via a two phased project.
▪ Preferred applicant for 6 Petroleum Exploration
Licences (PEL).
▪ Progress prospect and lead maturation and exploration
drilling to provide backfill and growth.
▪ Preferred applicant for 2 Gas Storage Exploration
Licences (GSEL).
▪ Leverage Carbon Capture and Storage potential in the
basin to support Rafael and third party generated emissions
reduction.
▪ Granting of permits subject to valid land access
agreements under the Native Title Act 1993.
Buru Ownership
Strategy
4
7 September 2023 | Good Oil Conference
WHY INVEST IN BURU?
Complementary asset and value streams focused on shareholder returns
1
2
3
4
5
Major Gas
Development
High Quality
Exploration Portfolio
Conventional Oil
Part of the New
Energy Ecosystem
Corporate
Strength
▪ 100% owner of first
high potential, high
quality, liquids rich
conventional gas
discovery in the
Canning Basin
(Rafael 1)
▪ Significant running
room in Canning
Basin with
dominant acreage
ownership with
multiple leads and
prospects.
▪ 3D seismic survey
underway. Appraisal
drilling planned for
2024.
▪ Exploration and
development
opportunities for
Rafael backfill
and/or growth.
▪ Phased project
development
strategy confirmed.
▪ 100%1 owner of
Ungani Oilfield and
production
infrastructure.
▪ Strong production
history and customer
relationships.
▪ Exploration
opportunities to
backfill production.
▪ Unparalleled
understanding of
Greenhouse Gas (GHG)
storage potential in
the Canning Basin.
▪ Experienced board
and management.
▪ Carbon Capture and
Storage for third party
emitters and own
development.
▪ Strong Traditional
Owner relationships.
▪ Natural hydrogen and
helium exploration
and development.
▪ Operating and
commercial capability.
▪ Cash on hand, no
debt.
1 Following Roc Oil’s agreement to assign 50% interests of the Ungani Oilfield to Buru. Transfer completion expected 30 September 2023, subject to statutory Government approvals.
5
7 September 2023 | Good Oil Conference
1
PURSUING THE FIRST CONVENTIONAL GAS DEVELOPMENT IN THE KIMBERLEY
With full ownership of the Rafael discovery, focus is on commercialising the resource and securing a development partner
A seriously underexplored
sedimentary basin, 9 times
the size of the Perth Basin has
delivered its first significant
conventional wet gas
discovery.
A potential world scale
conventional resource
Feasibility studies confirm
several project options
Disciplined execution
to deliver value
▪ Resource assessed by ERCE
to hold between 59 bcf and
over 1 TCF of gas and up to
20.5 MMstb of condensate
(probabilistic)1.
▪ Third party studies confirm
several feasible project
options, with a 2-phase
development providing
highest value.
▪ 3D seismic survey underway
with initial results by year
end.
Rafael-1 is a high potential,
high quality, liquids rich
discovery with a gas column
of 165m (proven) up to 630m
(based on pressure data).
▪ Buru deterministic resource
assessment provides
improved level of confidence
in resource volumes to
underpin project
development options.
▪ Rafael is stand-alone
commercial, even at this early
stage.
▪ Progressing to next stage of
engineering.
▪ Appraisal well planning and
Long Lead Item procurement
for 2024 drilling progressing.
▪ Development partner
selection progressing to
deliver a regionally significant
project.
▪ Canning Basin CCS is a key
enabler for development.
1 Refer to the ASX release of 26 April 2022 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this assessment and that all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed.
6
7 September 2023 | Good Oil Conference
1
RAFAEL 1 – A SIGNIFICANT CONVENTIONAL GAS AND CONDENSATE DISCOVERY
The Eureka moment for Buru, the Kimberley and the Western Australian resource industry
Rafael 1 well was drilled in 2021 on a large structure with gas encountered
in three zones.
Rafael geology is a proved Canning Basin play type with conventional
reservoir in Ungani Dolomite equivalents and a new play type in Upper
Laurel dolomites.
Encouraging initial flow rates of 7.5 mmcfd from a restricted zone with
excellent quality gas <2% CO2 and 40 bbls/mmscf condensate (light oil).
Wide range of resources as expected at early stage of evaluation1:
Rafael 1 flow test – March 2022
▪ 1C of 59 Bscf is the gas seen in the well,
▪ 3C of 1.024 TCF is the inferred gas in the structural closure and
backed up by pressure data,
▪ 2C of 260 Bscf is a probabilistic calculation with no physical basis.
3D seismic survey underway and is expected to yield results late 2023 and
inform appraisal well drilling in 2024
1 Refer to the ASX release of 26 April 2022 for full definitions and disclosures. Buru is not aware of any new
information or data that materially affects this assessment and that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
Rafael 3D seismic survey underway
7
7 September 2023 | Good Oil Conference
1
RAFAEL 1 – A GAME CHANGING DISCOVERY IN THE CANNING BASIN
Current 3D seismic survey will provide confirmation of structure size and confirm potential gas column extent
Rafael (Canning Basin)
Waitsia (Perth Basin)
Senecio 1
350m
Gas column height
165m (proven) to 630m (potential)
830 bcf (2P)
Recoverable gas
60 bcf – 1,024 bcf (1C-3C)
50 km2
Area (blue outline)
50 km2
Gas Columns
(same scale)
1C (59 bcf)
Gas-water
contact
350m
N
3C (1,024 bcf)
700m
8
Proven absolute
minimum 165m gas column
Potential 630m gas
column (mapped &
supported by pressure
data)
7 September 2023 | Good Oil Conference
1
RAFAEL IS STAND -ALONE COMMERCIAL, EVEN AT THIS EARLY STAGE
Concept work to date confirms credible phased development with CCS as an enabler
PHASE 2
PHASE 1
Subsurface Realisation
Small-scale
LNG for local
consumption
+
Methanol
or
Ammonia
or
LNG for
Export
(FLNG/NWS)
+
+
+
+
Condensate
Condensate
Condensate
Condensate
Low
< 40 bcf
Mid
400 bcf
High
≥ 800 bcf
9
7 September 2023 | Good Oil Conference
1
PHASE 1 DEVELOPMENT – TARGETING THE TRANSFORMATION OF THE KIMBER LEY ENERGY SYSTEM
Domestic hybrid LNG and renewables for power generation with condensate export
Objective
Develop a small footprint, scalable LNG supply stream, complemented by
50% renewable energy supply via solar and battery storage, to meet the
energy needs of Kimberley.
Resource
Low Case
Key Project
Parameters
First Production:
2027
Project Life:
20 years
No. of wells:
1 – 2 (Rafael appraisal wells completed as producers)
Gas flowrate:
8 – 16 mmscf/d
Product streams:
LNG (0.05 – 0.1 MTPA)
Condensate (225 -450 bopd)
▪ Gas gathering system & liquids separation close to wellsite,
▪ Pipelines for gas and condensate to Central Processing Facility (CPF) at
Energy Hub,
Indicative basis ▪ Small scale, containerized LNG facility at Energy Hub,
of design
▪ LNG trucking to Broome and regional communities, condensate
trucking to Broome, and
▪ 50% renewable power generation (photovoltaic and battery storage) at
each site.
Market
10
Domestic power for Broome, Derby, Camballin/Looma, Fitzroy Crossing
and Halls Creek, with demand creation opportunities for other industrial
gas customers. Condensate for SE Asian refineries.
7 September 2023 | Good Oil Conference
1
PHASE 2 DEVELOPMENT – RESOURCE APPRAISAL DRIVEN OPTIONS
Building on Phase 1 to deliver a large-scale project with Carbon Capture & Storage
Methanol
Ammonia
LNG Export
First Production:
2029
2029
2029
Project Life:
20 years
20 years
10 years
No. of wells:
5 – 10
5 – 10
Up to 12
Gas flow rate:
55 - 110 mmscf/d
55 - 110 mmscf/d
280 mmscf/d
Product streams:
▪ LNG for domgas power (0.03 MTPA)
▪ Methanol (0.5 – 1.0 MTPA)
▪ Condensate (2,200 – 4,400 bopd)
▪ LNG for domgas power (0.03 MTPA)
▪ Ammonia (0.5 – 1.0 MTPA)
▪ Condensate (2,200 – 4,400 bopd)
▪ LNG for domgas power (0.03 MTPA)
▪ LNG for export (~1.6 MTPA)
▪ Condensate(5,100 bopd)
Relative impact of CCS on low
reservoir CO2 Rafael
development:
11
7 September 2023 | Good Oil Conference
1
Development
Partner
Shortlist
3D Fast-track
interpret’n
DISCIPLINED APPROACH TO RAFAEL VALUE CREATION
The transformation from gas explorer to developer and producer
Complete
3D seismic
Near Term Objectives
Commit to
Confirmed LLIs for 2024
phased
appraisal
development
strategy
Create and maintain value ahead of Development Partner
selection
Drive certainty of outcome for development by managing
risks and reducing subsurface and development
uncertainty
Set up development for value realisation stage
Rafael
discovery
12
Rafael
production
test
Rafael
Independent
resource
assessment
Commenced
development
studies
Strengthened
balance sheet
via Carnarvon
asset sale
Commenced
3D seismic
survey
Government
approves
DoL#
FLNG feasibility
study for ‘high’
resource
Acquired
outcome
Origin’s
Canning
Basin JV
interests
- Achieved
- On track
#Declaration of
Location
7 September 2023 | Good Oil Conference
1
EXECUTION STRATEGY TO MITIGATE SUBSURFACE UNCERTAINTY
Phased development to deliver early cashflows on known resource, and significant upside on appraisal success
2023
Activity
2024
VALUE CREATION
2025
2026
2027
2028
2029
Fast track results available
Acquire &
Interpret
3D Seismic
Resource
Update
Resource maturation
JV Partner Selection
Convert Contingent Resources
to Reserves
Shortlist, Negotiate
and Execute
Drilling &
Completion
LLI
Procm’t
Appraisal Drilling
Commercialisation Studies
Concept Screening
Phase 1
CONCEPT
STUDIES
FID
TECHNICAL /
COMMERCIAL
DEF’N
FEED
FID
CONCEPT
SELECTION
Phase 2
DEF’N
FEED
VALUE REALISATION
Production
ENGINEERING, PROCUREMENT &
CONSTRUCTION (24 MONTHS)
Phase 1
Operate
Production
ENGINEERING, PROCUREMENT &
CONSTRUCTION (38 MONTHS)
Phase 2
NOW
13
Timeline is indicative and is subject to capital availability, future discussions with potential asset partners, offtake
arrangements , land access and regulatory approvals.
7 September 2023 | Good Oil Conference
2
CANNING BASIN PIPELINE OF LEADS AND PROSPECTS
A seriously underexplored sedimentary basin the size of France
▪
Recent reprocessing of
2021/22 seismic data and
well information has
provided significant
insights
▪
Prospects and leads to
underpin a targeted
future exploration
program to provide
expansion opportunities
for Rafael development
Rafael 3D
14
seismic survey
7 September 2023 | Good Oil Conference
3
CANNING BASIN CONVENTIONAL OIL
Full ownership of the Ungani Oilfield provides Buru with strategic optionality
Asset overview
No. of Permits
▪ 5 Production Licences
Area
▪ ~1,140 sq km
Interest
▪ 100%1 interest in the Ungani Oilfield, and the only oil
production infrastructure in the Canning Basin
Ungani Production Facility
▪ 100% interest in Lennard Shelf
Key Assets
▪ Ungani Oilfield
Production (gross)
▪
~185,000 bbls transported via road to Wyndham Port for
export (CY22)
Crude Oil Road Train
▪ Production pre-suspension (Aug’23) ~ 450 bopd
▪ Last crude lifting for CY23 on 28 August.
Strategy
Next Steps
▪ Operations suspended until Great Northern Highway
(export route) to Wyndham Port is permanently reestablished by Government.
Oil tanker at Wyndham Port
▪ Undertake technical, commercial and operational analysis
to inform future Ungani operations.
▪ Continue to decommission and rehabilitate Blina facilities
(L6/L7/L8).
SE Asian Refineries
15
1 Following Roc Oil’s agreement to assign 50% interests of the Ungani Oilfield to Buru. Transfer completion expected 30 September 2023,
subject to statutory Government approvals
7 September 2023 | Good Oil Conference
4
BURU IS PART OF THE NEW ENERGY ECOSYSTEM
Leveraging Buru competency and IP, subsidiary companies established to actively participate in the energy transition
16
▪ Aims to be a pre-eminent operator in the identification, development and
operation of greenhouse gas (GHG) storage projects in Australia.
▪ Actively developing the geological expertise to ensure 2H Resources can be at the
forefront of the exploration and production of natural hydrogen.
▪ Unparalleled understanding of GHG storage (CCS) potential in the Canning
Basin.
▪ Developing expertise in identifying hydrogen accumulations by their surface
expressions through its own exploration programs and co-operatively with CSIRO.
▪ Support Rafael development and third-party CO2 emitters by making
available suitable storage formations to reduce greenhouse gas emissions
as part of the transition to a lower carbon future.
▪ Independent Hydrogen Prospective Resource assessment for 2H Resources’
South Australian permit application areas confirms significant potential and
business case to pursue exploration and development.
CCS methodology
2H Resources supply chain
7 September 2023 | Good Oil Conference
5
EXPERIENCED BOARD AND MANAGEMENT TEAM
Deep industry experience and proven track record
17
Mr Eric Streitberg
Mr Thomas Nador
Non-Executive Chair
CEO
Geology, geophysics, commercial
Strategy, development, commercial
Ms Joanne Kendrick
Mr Paul Bird
Independent Non-Executive Director
CFO and Company Secretary
Technical, engineering
Finance, governance
Mr Malcolm King
Dr Kris Waddington
Independent Non-Executive Director
COO
Commercial, exploration, operations
Operations, stakeholder engagement
Mr Robert Willes
Mr Mark Devereux
Independent Non-Executive Director
GM Subsurface and Technical Integration
Finance, commercial, M&A
Exploration, technical, regulatory compliance
7 September 2023 | Good Oil Conference
BURU INVESTMENT PROPOSITION - RECAP
Backed by a strong balance sheet, complementary asset and value streams focused on shareholder returns
1
Dominant position in underexplored onshore Canning Basin with a significant
portfolio of exploration and development opportunities.
2
100% owner of the Rafael discovery – a high quality, liquids rich conventional gas discovery
with a phased development plan. Progressing with Phase 1 Project.
3
100% owner1 of the Ungani Oilfield which has produced >2 million barrels of oil
since 2015. Autonomy provides strategic optionality for asset.
4
Leveraging corporate capability, an early mover in Carbon Capture and Storage (CCS)
in the Canning Basin and natural hydrogen exploration in South Australia.
5
Experienced Board and Management Team to drive growth agenda across
hydrocarbon and new energy expansion/transition businesses to deliver value.
1 Following Roc Oil’s agreement to assign 50% interests of the Ungani Oilfield to Buru.
18
Transfer completion expected 30 September 2023, subject to statutory Government approvals
7 September 2023 | Good Oil Conference
Thank you
Q&A
19
7 September 2023 | Good Oil Conference
Buru Energy Limited
Level 2, 16 Ord Street
West Perth Western Australia 6005
PO Box 1903
West Perth WA 6872
Phone: 1800 337 330
Email: info@buruenergy.com
Backup Presentation Material
21
7 September 2023 | Good Oil Conference
1
PHASE 2 DEVELOPMENT – RESOURCE APPRAISAL DRIVEN OPTION 1
Phase 1 plus Methanol production for export with CCS as enabler
Objective
Facilitate the development of a small (0.5 MTPA) to large (1.0 MTPA)
methanol production facility, supported by CCS to meet export and local
demands, including as an alternative marine fuel.
Resource
Mid – High Case
Key Project
Parameters
First Production:
2029
Project Life:
20 years
No. of wells:
5 - 10
Gas flowrate:
55 – 110 mmscf/d
Product streams:
LNG (0.03 MTPA)
Methanol (0.5 – 1.0 MTPA)
Condensate (2,200 – 4,400 bopd)
Phase 1 plus:
▪ Additional gas gathering and liquids separation close to wellsite,
Indicative basis ▪ Methanol plant and small scale, containerized LNG facility at Energy
of design
Hub, and
▪ Product trucking or pipeline for methanol and condensate to Broome,
LNG trucking to Broome and regional communities.
Market
22
Export and domestic.
7 September 2023 | Good Oil Conference
1
PHASE 2 DEVELOPMENT – RESOURCE APPRAISAL DRIVEN OPTION 2
Phase 1 plus Ammonia production for export with CCS as enabler
Objective
Facilitate the development of a small (0.5 MTPA) to large (1 MTPA)
ammonia production facility, supported by CCS to meet the needs of
export markets, including as an alternative marine fuel.
Resource
Mid – High Case
Key Project
Parameters
First Production:
2029
Project Life:
20 years
No. of wells:
5 - 10
Gas flowrate:
55 - 110 mmscf/d
Product streams:
LNG (0.03 MTPA)
Ammonia (0.5 – 1.0 MTPA)
Condensate (2,200 - 4,400 bopd)
Phase 1 plus:
▪ Additional gas gathering and liquids separation close to wellsite,
Indicative basis ▪ Ammonia plant at Energy Hub, and
of design
▪ Product pipeline for ammonia to King Sound area for export, with
condensate trucking or pipeline to Broome for export. LNG trucking to
Broome regional communities.
Market
23
Export and domestic.
7 September 2023 | Good Oil Conference
1
PHASE 2 DEVELOPMENT – RESOURCE APPRAISAL DRIVEN OPTION 3
Phase 1 plus small-scale FLNG production for export with CCS as enabler
Objective
Facilitate the development of a compact, regionally located Floating LNG
(FLNG) facility, in conjunction with onshore condensate and LPG
processing.
Resource
High Case
Key Project
Parameters
First Production:
2029
Project Life:
10 years
No. of wells:
Up to 12
Gas flowrate:
280 mmscf/d
Product streams:
LNG for domestic power (0.03 MTPA)
LNG for export (~1.6 MTPA)
Condensate (5,100 bopd)
Phase 1 plus:
▪ Additional product pre-treatment at Energy Hub,
Indicative basis ▪ Permanently moored, small scale FLNG facility located in King Sound
of design
area in 60m – 80m water depth,
▪ Side by side loading of LNG to trading tankers, and
▪ Condensate trucking or pipeline to Broome for export.
Market
24
Export and domestic.
7 September 2023 | Good Oil Conference
Share your feedback
Discover