RIU Essential Energy Conference Presentation
Released
Released
Announcement PDF
ASX Announcement
17 September 2024
RIU Essential Energy Conference Presentation
Buru Energy Limited (Buru) (ASX: BRU) is pleased to provide its presentation made by the
Buru Chief Executive Officer Thomas Nador at the Essential Energy Conference held today in
Perth.
Authorisation
This ASX announcement has been authorised for release by the Chair of Buru Energy.
For further information, visit www.buruenergy.com or contact:
Thomas Nador, Chief Executive Officer
Telephone: +61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
1
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
ASX:BRU
Building a compelling
foundation Kimberley gas
business with near-term
exploration upside
17 September 2024
Disclaimer
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”)
and has been authorised for the intended purpose by the Non-Executive Chair of Buru
Energy Limited.
This presentation contains certain statements which may constitute "forward-looking
statements". It is believed that the expectations reflected in these statements are
reasonable but they may be affected by a variety of variables and changes in
underlying assumptions which could cause actual results or trends to differ materially,
including, but not limited to: price fluctuations, actual demand, currency fluctuations,
drilling and production results, reserve and resource estimates, loss of market,
industry competition, environmental risks, physical risks, legislative, fiscal and
regulatory developments, economic and financial market conditions in various
countries and regions, political risks, project delays or advancements, approvals and
cost estimates. All of Buru’s operations and activities are subject to joint venture,
regulatory and other approvals and their timing and order may also be affected by
weather, availability of equipment and materials and land access arrangements,
including native title arrangements. Although Buru believes that the expectations
raised in this presentation are reasonable there can be no certainty that the events or
operations described in this presentation will occur in the timeframe or order
presented or at all.
have not materially changed. The probabilistic method was used to prepare the
estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other
person that the material contained in this presentation will be achieved or prove to be
correct. Except for statutory liability which cannot be excluded, each of Buru, its
officers, employees and advisers expressly disclaims any responsibility for the accuracy
or completeness of the material contained in this presentation and excludes all
liability whatsoever (including in negligence) for any loss or damage which may be
suffered by any person as a consequence if any information in this presentation or any
error or omission there from. Neither Buru nor any other person accepts any
responsibility to update any person regarding any inaccuracy, omission or change in
information in this presentation or any other information made available to a person
nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
There are numerous uncertainties inherent in estimating reserves and resources, and
in projecting future production, development expenditures, operating expenses and
cash flows. Oil and gas reserve engineering and resource assessment must be
recognised as a subjective process of estimating subsurface accumulations of oil and
gas that cannot be measured in an exact way. All contingent resources and
prospective resources presented in this report are pursuant to the Company’s ASX
releases of 26 April 2022, 23 January 2023 and 26 July 2024 respectively. The estimates
of contingent and prospective resources included in this Presentation have been
prepared in accordance with the definitions and guidelines set forth in the SPE PRMS.
Buru is not aware of any new information or data that materially affects the
information included in this presentation and all material assumptions and technical
parameters underpinning the estimates in this presentation continue to apply and
2
Sep 2024 – Essential Energy Conference
BURU ENERGY OVERVIEW
Regional gas project developer + near term oil exploration + material prospects portfolio
Who we are
• Founded in 2008, we are an ASX listed energy company focused on exploration, development and production of
hydrocarbon and alternative energy resources in Australia.
• We are the most active onshore WA explorer since our formation and the only E&P company in the Canning Basin with
contemporary production history.
• In 2021 Buru discovered Rafael, the first conventional gas and condensate field in the Canning Basin.
• Buru is undergoing change - from pure play explorer with a modest oil business, to a gas developer focussed on
long term foundation cashflow with complementary growth.
Key Stats
Shares on issue ~671 million
Market Cap ~$55 million
What we do
Explore for and develop hydrocarbon resources in the onshore Canning Basin of Western Australia
whilst participating in the new energy economy through our subsidiary companies: GeoVault
(Carbon Capture and Storage (CCS)), 2H Resources (natural hydrogen and helium exploration), and
Battmin (battery minerals exploration).
Share Price $0.08
Cash at 30 June‘24 ~$11 million, with no debt
Minimal work program commitments
3
Our objective
Deliver material value and benefit to our Shareholders, the Traditional Owners and the
Communities of the areas where we operate.
Sep 2024 – Essential Energy Conference
BURU ENERGY INVESTMENT THEMATIC
Complementary assets and value streams to generate and grow shareholder value
Strong Foundation
Material Upside
Team to Deliver
• 100% owner of Rafael Deep - the only
proven significant conventional
onshore gas and condensate resource
in WA north of Karratha.
• The Canning Basin is underexplored.
Buru has a portfolio of significant
hydrocarbon exploration targets for
future staged gas development.
• Experienced Board and Management
to drive growth across hydrocarbon
and new energy businesses to deliver
value.
• Path to a Kimberley centred
foundation gas business with durable
cashflows and growth.
• Near term oil exploration with Rafael
Shallow drilling in Oct’24. Potential to
add material value and additional
funding path for gas development.
• Strong incumbency in the Kimberley.
• Canning Basin Carbon Capture and
Storage potential can support future
gas development and new business
models.
• In-house hydrogen/helium and CCS
specialists.
• Unique opportunity - use Rafael
condensate as diesel fuel substitute
for the Kimberley/Pilbara.
• Near term oil production and revenue
from existing Ungani Oilfield.
4
• Unparalleled understanding of
Canning Basin subsurface.
• Low-cost, agile, experienced operator.
• Early mover advantage in geological
hydrogen and helium exploration in
SA and WA.
Sep 2024 – Essential Energy Conference
BURU ENERGY ASSETS
Large operated acreage position to support gas development, hydrocarbon exploration and energy expansion and transition
opportunities
Onshore Canning Basin
Western Australia
Basin
Adelaide Superbasin
South Australia
Operating Area
~14,000 km2
~35,000 km2
~30,000 km2
Buru Ownership
30-100%
100%
100%
Focus
5
Yilgarn Craton
Western Australia
•
Develop the Rafael conventional gas
and condensate resource.
•
Pursue helium exploration and
development.
•
Pursue natural hydrogen and helium
exploration and development.
•
Continue to explore for conventional
hydrocarbon resources.
•
•
Preferred applicant for 7 Petroleum Exploration
Licences (PEL).
•
Restart Ungani Oilfield production.
•
•
Pursue Carbon Capture and Storage
opportunities for Buru and third-party
emitters.
Applications made for 6 Special
Prospecting Authorities with Acreage
Option (SPA-AO’s) under the Petroleum
and Geothermal Energy Resources Act
1967 (PGERA) in Western Australia.
Preferred applicant for 2 Gas Storage Exploration
Licences (GSEL).
Granting of permits subject to valid land access
agreements under the Native Title Act 1993.
•
Early-stage exploration for minerals
needed for energy transition.
Granting of permits subject to valid land •
access agreements under the Native Title
Act 1993.
•
Sep 2024 – Essential Energy Conference
FOUNDATION BUSINESS – COMMERCIALISING THE RAFAEL GAS DISCOVERY
Gas development focused on regional gas to power generation with condensate for local diesel replacement
Objective
Generate enduring cashflows through the development of the foundation
gas project involving a small footprint, scalable LNG and condensate
supply stream for regional use.
Interest
100% Buru Energy
Resource
1C (Low Case) Contingent Resource of 85 Bscf of gas and 1.8MMStb of
condensate
Key Project
Parameters
First Production:
2027
Project Life:
20 years
No. of wells:
2
Gas flowrate:
14 mmscf/d (initial)
Product streams:
LNG (0.1 MTPA)
Condensate (250 bopd)
Small scale LNG facility at Rafael 1 wellsite, with liquids searation.
Indicative basis
LNG trucking to Broome and regional demand centres, condensate
of design
trucking to regional communities for diesel replacement.
Mature gas and condensate marketing / offtake
FEED entry early 2025
Forward Plan
Drill second Rafael well in 2025. Re-test/recomplete Rafael 1 well as
producer.
6
FID late 2025.
Indicative Rafael Phase 1 project design
Sep 2024 – Essential Energy Conference
NEAR-TERM VALUE UPSIDE – RAFAEL SHALLOW OIL PROSPECT
A large shallow closure beneath the regional seal on the high-quality Rafael 3D
Objective
Drill the low-cost, high potential oil exploration well in early Q4 2024.
50% Buru Energy
Interest
Farm-in agreement (FIA) executed with Sabre Energy for a full carry of
the well (A$ 6 million) to earn 50% interest in a Commercial Discovery.
FIA subject to financial conditions to be met by Sabre Energy.
Rafael Shallow Low 3.2MMstb
Prospective
Mid 19 MMstb (Mean 33 MMstb)
Resource1
High 79 MMStb
Indicative basis Ungani Processing Facility ‘lookalike’. FID 2025, first oil 2026.
of design
(success case) Oil trucking to Derby or Broome for storage and export.
Forward Plan
Civil works completed; rig has mobilised.
Spud target in early Oct’24.
1 Prospective Resources relate to the estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) and relate to undiscovered accumulations. These estimates have both an associated risk of
discovery and a risk of development. Further exploration, appraisal and evaluation is required to determine the existence of a
significant quantity of potentially moveable hydrocarbons. Refer to additional disclosures required under ASX Listing Rule 5 in
Buru Energy’s ASX Releases dated 24 April 2024 and 20 May 2024. Buru is not aware of any new information or data that
materially affects this assessment and that all material assumptions and technical parameters underpinning the estimates
continue to apply and have not materially changed.
7
Rafael Shallow oil prospect
Sep 2024 – Essential Energy Conference
VALUE UPSIDE – RESTART UNGANI PRODUCTION AND EXPLORE TO BACKFILL
Reinvigorate the asset with drilling of a high potential oil exploration well (Mars)
Objective
Re-establish revenues from the oil business via a potential domestic
offtake pathway. Pursue near-field exploration to extend production
beyond current field life.
30% Buru Energy
Farm-in agreement (FIA) executed with Sabre Energy for 70% interest
Interest
in the Ungani Oilfield. FIA subject to financial conditions to be met by
(pending WA
Sabre Energy.
Govt. approval)
FIA includes financial contribution from Sabre Energy to restart
Ungani production and to drill the Mars prospect. Sabre to assume
apportioned future field decommissioning liabilities.
Mars
Prospective
Resource1
Forward Plan
Low 0.74 MMstb
Mid
2.80 MMstb (Mean 33 MMstb)
High 6.20 MMStb
Progress Ungani Oilfield restart as early as possible, pending
confirmation of a potential domestic commercialisation route.
Mature plans to drill the Mars prospect (9km north of Ungani) as
potential backfill to the Ungani Production Facility.
Mars oil prospect
1 Prospective Resources relate to the estimated quantities of petroleum that may potentially be recovered by the application of a
future development project(s) and relate to undiscovered accumulations. These estimates have both an associated risk of discovery
and a risk of development. Further exploration, appraisal and evaluation is required to determine the existence of a significant
quantity of potentially moveable hydrocarbons. Refer to Buru ASX Release 17 June 2024 for full definitions and disclosures. Buru is not
aware of any new information or data that materially affects this assessment and that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
8
Sep 2024 – Essential Energy Conference
VALUE UPSIDE - MATERIAL CANNING BASIN EXPLORATION POTENTIAL
High grading prospects and leads portfolio underway to provide opportunities for future phases of gas development
Exploration to build on foundation Rafael
gas and condensate project across diverse
and proven conventional plays:
New prospects and play insights from 2021 and
2023 seismic campaigns.
Play diversity that includes the proven Ungani
Dolomite Play, clastic plays and emerging salt plays
with proven petroleum systems.
Staircase of sizable prospects and leads within tieback distance to Rafael (~2 tcf unrisked).
9
Sep 2024 – Essential Energy Conference
VALUE UPSIDE – EXPOSURE VIA INCUBATED SUBSIDIARY COMPANIES
Leveraging Buru competency and IP, subsidiary companies established to actively participate in the energy transition
Unparalleled understanding of greenhouse gas (GHG) storage potential in
the Canning Basin.
Actively developing geological expertise to ensure 2H Resources can be at the
forefront of the exploration and production of natural hydrogen and helium.
Aims to support Rafael gas development and third-party CO2 emitters
by making available suitable storage formations to reduce greenhouse gas
emissions as part of the transition to a lower carbon future.
Developing expertise in identifying hydrogen accumulations by their surface
expressions through Buru exploration programs and in co-operation with
CSIRO.
Completed an independently validated GHG storage potential
assessment for Buru’s petroleum permit and licence areas confirming
storage capacity exceeds estimated Scope 1 and Scope 2 emissions from
the proposed Rafael development.
Independent Hydrogen Prospective Resource assessment for 2H Resources’
7 South Australian permit application areas confirms significant potential and
business case to pursue exploration and development.
In addition, GHG storage capacity will be made available to companies
seeking to reduce their GHG emissions as part of the transition to a lower
carbon future.
CCS methodology
10
Applicant for 6 SPA-AOs in Western Australia prospective for Helium and
associated gases.
Plan to make entity independently investible in the future for the benefit of
Buru shareholders.
2H Resources in SA
2H Resources in WA
Sep 2024 – Essential Energy Conference
KEY NEAR TERM CATALYSTS
A busy second half of 2024
Focus Areas
Find
Enable
energy resources
safely and
competitively
• Drill Rafael Shallow oil prospect safely, on budget and on time. Spud in early Q4 2024.
• Prepare for Rafael 1 well testing/completion and Rafael B drilling in 2025.
• Mature Canning Basin prospect and lead inventory to support market-led exploration.
opportunities through
the right partners and
funding structures
• Determine optimum Rafael gas project funding structure.
• Secure gas and condensate sales and offtake arrangements.
• Progress 2H Resources asset or corporate divestment opportunities.
Develop
with a material
interest in producing
assets
Evolve
complementary
integrated energy
businesses
• Finalise Rafael gas project concept selection, in support of FEED entry in 2025,
FID in late 2025 and First Gas late 2027.
• Develop new Ungani crude oil offtake pathways and prepare for restart of
Ungani Oilfield production.
• Secure land tenure for 2H Resources in SA and WA (staged).
• Continue technical work and business development for GeoVault.
• Expedite non-operated work program on Barbwire Terrace Project (Battmin).
11
Sep 2024 – Essential Energy Conference
BURU ENERGY - A UNIQUE VALUE PROPOSITION FOR INVESTORS
Significantly undervalued with complementary assets and value streams
1
2
3
4
5
100% owner of Rafael
(deep) gas discovery
50% owner of Rafael
Shallow oil prospect#
30% owner of Ungani
Oilfield#
Dominant position in
Canning Basin
Early mover in natural
H/He exploration
3D defined, high
quality, liquids
rich conventional
gas discovery.
Planned near-term
drilling of shallow
clastic oil prospect
with significant
upside.
Plans to restart oil
production and
sales in 2024.
Compelling
hydrocarbon
prospect staircase
in Canning Basin
to underpin future
stages of Rafael
gas development.
Leveraging
corporate capability
to incubate
subsidiary
companies.
Strong business
case for a Phase 1
foundation
project based on
1C resource.
Project
partnering
discussions
underway.
Civil works
completed; Rig
mobilised.
Discovery unlocks
material value and
creates strategic
options for Rafael
deep development.
Drilling of Mars
exploration well
planned for 4Q’24
to potentially
backfill production.
Material CCS
potential to
support Rafael gas
development or
third-party
emissions.
In discussions with
third parties
regarding
partnering.
Targeted permit
applications across
SA and WA to
expand footprint.
Experienced Board and Management Team to drive growth agenda across hydrocarbon and new energy
businesses to deliver value.
# Subject to Sabre Energy meeting its financial obligations under two Farm-in Agreements (FIA) executed with Buru Energy in June and August 2024 respectively.
12
Sep 2024 – Essential Energy Conference
Thank you
13
May 2024 Update – Commercial Growth and Investment Forum
BURU ENERGY BOARD AND MANAGEMENT
Deep industry experience and proven track record to deliver strategy
Mr David Maxwell
Thomas Nador
Independent Non-Executive Chair
CEO
>35yrs strategy, commercialisation, risk and asset
management
>25yrs strategy, resource development, commercial
Ms Joanne Williams
Independent Non-Executive Director
>25yrs technical, engineering
Paul Bird
CFO and Company Secretary
>25yrs finance, governance
Grant McMurtrie
GM Exploration – Hydrocarbon & New Energy
Mr Malcolm King
>25yrs play based exploration, remote sensing, new ventures
Independent Non-Executive Director
Rachel McIntyre
>35yrs commercial, exploration, operations
Development Manager
>15yrs geoscience, project development, CCS
14
Mr Robert Willes
Rosie Johnstone
Independent Non-Executive Director
Head of CCS Solutions - GeoVault
>35yrs finance, commercial, M&A
>25yrs exploration, CCS Technical Authority
Sep 2024 – Essential Energy Conference
Buru Energy Limited
Level 2, 16 Ord Street
West Perth Western Australia 6005
PO Box 1903
West Perth WA 6872
Phone: 1800 337 330
Email: info@buruenergy.com
Web: buruenergy.com
Share your feedback
Discover