Quarterly Activities and Cash Flow Report - Mar 2026
Released
Released
Announcement PDF
Buru Energy Limited Level 2, 16 Ord Street, West Perth WA 6005
Telephone: 1800 337 330 Email: info@buruenergy.com ABN: 71 130 651 437
Quarterly Activities Report
31 March 2026
21 April 2026
Buru Energy Limited
ASX:BRU
Buru Energy Limited (Buru, Company)
provides the Quarterly Report for the period
ending 31 March 2026.
Quarter Highlights, including
material subsequent events
• Engineering studies identified additional
liquids and LPG streams, increasing
projected "mid-case" Rafael Gas Project
value by more than 45%.
• Ongoing collaboration with Carlingford
(UK) expanded the Project’s reach to
international debt markets and global
energy investors. Timeline extended to
enable capture of increased value and
leverage the current energy security
requirement.
• Appraisal drilling and Rafael 1
recompletion rescheduled for Q2 2027 to
align with optimised project design and
funding frameworks.
• A$5.3M placement completed in April
2026 to fund critical pre-FID activities
associated with engineering,
gas/condensate/LPG marketing and
project approvals.
• Discussions underway on farming out
Mars prospect drilling, offering a "tie-
back" opportunity to existing Ungani
infrastructure.
• Yulleroo - a strategic regional asset with
significant contingent resources that
complement Buru’s Canning Basin
position.
Capital Structure
Shares on issue1: 1,002,613,773
Market capitalisation2: $17 million
Cash1: $2 million
Debt: Nil
12-month high: 5.5c
12-month low: 1.6c
Chief Executive Officer’s comments:
“The first quarter of 2026 has been a period of technical focus and strategic
refinement for Buru’s Rafael Gas Project. Our primary objective remains clear: to
transition Rafael from a significant conventional gas and liquids discovery into high-
value, operational reality that provides energy security for the north of Western
Australia and material returns for our shareholders.
We operate in an era of profound global energy uncertainty. Recent supply chain
fragilities highlight the critical importance of sovereign energy sources. Energy
security is a fundamental requirement for industrial stability and economic
resilience.
Buru Energy is uniquely positioned to contribute to Western Australia’s "energy
independence”. Developing the Rafael Gas Project unlocks a domestic energy
resource that reduces reliance on long distance supply chain routes and volatile
international markets and ensures that the greater Kimberley has access to reliable,
low-emissions energy sourced within the region.
Together with our significant gas endowment at Yulleroo and attractive oil
prospectivity associated with our Mars prospect, our portfolio of onshore assets
provides unprecedented value and the foundation for regional energy security.
We continue to mature our partnership with Clean Energy Fuels Australia (CEFA).
The modular, "no-pipeline" design of the proposed LNG facility remains a standout
feature of our strategy, allowing for faster approvals facilitated by a reduced
environmental footprint.
We have worked with global market participants to explore funding options for
Rafael drilling and development and with engineering partners to better define and
understand the intrinsic value of the Project.
The identification of additional liquids and LPG product streams has significantly
enhanced the Project’s forecast economics. The updated modelling reflects a 20%
to 47% increase in annual pre-tax cashflow (mid-case). Rafael is a low-footprint,
high-margin development capable of delivering first cashflow within 3 years.
Buru has successfully raised $5.3 million via a share placement announced after
quarter-end. This capital raising, supported by both existing shareholders and new
investors, provides the Company with the financial runway required to progress pre-
FID activities and commercially optimise project development to capture the
improved intrinsic value of Rafael.
With a strengthened balance sheet, optimised forecast economics, and an
increasingly compelling role to play in Western Australia's energy future, Buru is
exceptionally well-positioned. We are building a foundation for regional energy
security.
I thank our shareholders for their continued support as we unlock the full potential
of the Rafael Gas Project and our Canning Basin assets.”
Thomas Z Nador
Chief Executive Officer
1 - As at 31 March 2026
2 - As at 20 April 2026
2
Activities during the Quarter
Rafael Gas Project Development
(Within EP 428 – Buru 100% and Operator)
During the quarter, Buru Energy continued to advance the Rafael Gas Project toward commercialisation, focusing on technical
workstreams to maximise project value. These studies successfully identified the potential for a material uplift in project economics,
driven primarily by an expected increase in condensate production and the inclusion of a previously unincorporated LPG product
stream.
The Company continued its structured engagement with international debt providers and institutional investors, managed in
coordination with our financial advisor Carlingford UK. These discussions have confirmed the robust fundamental value of the Rafael
Project. However, the ongoing geopolitical instability in the Middle East has led to a more cautious near-term outlook among
international lenders, resulting in extended due diligence timelines. The feedback from the Carlingford-led process remains positive,
particularly regarding Rafael’s potential as a critical, high value, lower-emission energy source for Western Australia.
Post-quarter end, Buru announced a $5.3 million (before costs) two-tranche institutional share placement. This capital raise was
strongly supported by existing shareholders and new investors. It provides the financial runway to finalise long-lead item procurement,
environmental approvals, and land access agreements whilst positioning the company to benefit from the increased value identified.
To ensure that the results of the recent engineering optimisations and significantly increased project's value are fully reflected in the
final project financing and partnering structures, the Company has elected to adjust the project timeline. Drilling of the Rafael 2H
verification/appraisal well and the recompletion of Rafael 1 are now targeted for the April quarter of 2027.
This revised schedule allows the Company and its advisors to conclude negotiations for a funding package that reflects the project’s
enhanced intrinsic value and maintain as much of this value as possible for Buru shareholders.
Figure 1 Rafael Gas Project Schedule
3
Flying Fox Prospect
(Within EP 428 – Buru 100% and Operator)
The Flying Fox prospect was identified following work on the interpretation of the Rafael 3D Seismic acquired in 2023. The Flying
Fox prospect lies immediately beneath the main Rafael gas and condensate field at a depth of approximately 4,015m TVDSS1
.
The Flying Fox prospect has been assessed to contain Prospective Resources3
between 60 Bscf and 614 Bscf of gas, with a best
estimate (P50) volume of 247 Bscf, and between 1.2 MMstb and 12.6 MMstb of condensate with a best estimate (P50) of 5.0 MMstb.
This is similar in size to the Contingent Resources2
assessed for the primary Rafael reservoir interval which currently forms the basis
for the Rafael Gas Project. The Flying Fox prospect can be tested by drilling an incremental ~500 meters below the Rafael gas
accumulation at the Rafael 2H target location.
The Company is currently evaluating the potential to include the testing of the Flying Fox prospect via a cost-effective deepening of
the Rafael 2H well.
Chance of
Success
Condensate (MMstb) Gas (Bscf)
(COS) 1U 2U 3U 1U 2U 3U
Gross Prospective Resources 45 1.2 5.0 12.6 60 247 614
Net Prospective Resources 45 1.1 4.6 11.3 57 226 551
Figure 2 – Flying Fox Prospective Resources3
Cautionary Statement: Prospective Resources are estimated quantities of petroleum that may be potentially recovered by the
application of a future development project and relate to undiscovered accumulations. These estimates have both an associated risk
of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a
significant quantity of potentially recoverable hydrocarbons.
Figure 3 – Flying Fox Prospective location below main Rafael structure
1
True Vertical Depth Subsea. 2
Refer to the ASX release of 26 July 2024 for full definitions and disclosures. Buru is not aware of any
new information or data that materially affects this assessment and that all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed. 3
Refer to the ASX release of 14 August 2025 for full
definitions and disclosures. Buru is not aware of any new information or data that materially affects this assessment and that all
material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
4
Ungani Oilfield
(L 20/L 21 – Buru 100%)
The Ungani Oilfield remained in care and maintenance during the quarter. The strategic decision to suspend operations has allowed
the Company to focus its resources on the Rafael Gas Project while simultaneously evaluating more robust and cost-effective export
routes for Ungani crude.
In the context of the current global energy crisis and the resulting volatility in fuel prices, the Company recognises the strategic value
of domestic, onshore oil production. The ability to provide a secure, local source of liquid fuels has become a national priority, and
Buru is actively reviewing the commercial parameters required to responsibly and profitably restart production from the field.
A key potential catalyst for a production restart is the Mars oil prospect, located approximately 9km north of the Ungani facility. Mars
is a high-potential, near-field exploration target that could be tied into the existing Ungani infrastructure with minimal additional capital
expenditure.
A Mars exploration success would provide a material backfill to the Ungani production profile and significantly improve the unit
economics of the entire operation. By utilising the existing processing and storage capacity at Ungani, a discovery at Mars represents
a low-risk, high-reward pathway to generating near-term cash flow.
As part of its broader 2026-2027 operational planning, Buru is evaluating the optimal timing for an exploration well at Mars and is
engaging with third parties interested in participating on a prospect farmout basis. The opportunity to unlock a new, conventional oil
resource adjacent to proven infrastructure remains a high-priority growth lever for the Company.
Mars is a large fault-bounded anticlinal closure up-dip from the interpreted oil pay in the Ungani North 1 well that is confidently defined
on high quality modern 3D seismic data. The prospect was initially identified on the Ungani 3D seismic, with the structure confirmed
on the reprocessed Ungani 3D pre-stack depth migration volume in 2019. Ungani North 1 confirmed excellent reservoir quality within
the Reeves Formation sandstones with 17% porosity measured from sidewall cores at 1,765m. Strong oil shows in several sidewall
cores recovered from sands of the Reeves Formation at Ungani North 1 provides confidence of oil charge into the Mars structure.
Buru’s internal assessment indicates a chance of success of 40% for a Mars 1 well4
.
Figure 4 – Section A-A’ from Ungani Far West 1 (UFW1) to Mars Prospect
4
Further details on the Mars prospect can be found in the ASX announcement released on 17 June 2024, and can be accessed
here: https://buruenergy.com/announcements/6385907
5
Yulleroo Gas Field
(Within EP 391 & EP 436 - Buru 100%)
The Yulleroo Gas Field remains a key part of Buru Energy’s long-term strategy, representing a world-class accumulation of gas and
high-value liquids within the Carboniferous-aged Laurel Formation. The primary near-term focus for Buru is the fast-tracked
commercialisation of the conventional Rafael Gas Project. However, Yulleroo’s importance as a "strategic reserve" for Western
Australia cannot be ignored. With an independently certified contingent resource, Yulleroo has the potential to be a multi-decade
energy provider for Western Australia.
The development of Yulleroo has historically been hampered by a lack of regulatory certainty regarding Hydraulic Fracture Stimulation
(HFS). The landscape for onshore gas in the Canning Basin has reached a significant turning point following the Environmental
Protection Authority’s (EPA) January 2026 recommendation for approval of the Valhalla Gas Exploration and Appraisal Program. The
EPA’s conclusion - that the environmental risks associated with HFS can be strictly managed through rigorous, science-based
conditions - reinforces Buru’s long-held position that these resources can be developed safely.
The progress at Valhalla signals that the Canning Basin may be open for responsible, regulated energy development.
The Yulleroo accumulation is defined by four wells - all intersecting thick gas saturated sections with gas below closure mapped on
3D seismic and Yulleroo 4 deliberately drilled outside closure. There is also a potential conventional pay in Yulleroo 3. The Yulleroo
2 well was tested in 2010 (3 zones) and produced rates up to 1.8 mmcfd and high condensate content.
The "wetness" of the Yulleroo gas is a defining technical feature. This high liquid content provides a material economic "sweetener"
to the project, much like the Rafael Gas Project. The produced condensates could be sold into liquid fuel markets, providing a
diversified revenue stream that is independent of domestic gas pricing.
Figure 5 - Depth Structure Map of the near top Lower Laurel Carbonates
6
Contingent Resources5
1C 2C 3C
Unlimited Recoverable Sales Gas (PJ) 321.4 714.0 1,627.0
Unlimited Recoverable Associated Liquids (MMbbls) 9.5 24.9 47.6
Prospective Resources5
Low Best High
Sales Gas (PJ) 124.6 302.8 611.0
Associated Liquids (MMbbls) 4.3 11.9 24.8
Figure 6 – Yulleroo Contingent and Prospective Resources5
5
RISC’s Contingent Resource and Prospective Resource assessment has been prepared using the probabilistic method and an
evaluation date of 1 December 2017. Contingent Resources are quantities of petroleum estimates as of a given date to be potentially
recoverable from known accumulations by application of development project(s) but which are not currently considered to be
commercially recoverable due to one or more contingencies. Contingent Resources are a class of discovered recoverable resources.
Prospective Resources are estimated quantities of petroleum that may potentially be recovered by the application of a future
development project(s) that relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a
risk of development. Further exploration, appraisal and evaluation is required to determine the existence of a significant quantity of
potentially moveable hydrocarbons. The full resource statement is set out in accordance with ASX Listing Rules in Buru’s ASX release
of 18 January 2018. Buru Energy is not aware of any new information or data that materially affects the information included in the
18 January 2018 release and all material assumptions and technical parameters underpinning the estimates in that release continue
to apply and have not materially changed.
Canning Basin Exploration
Remaining Acreage Position
(L 6, L 8, L 17, EP 129 and EP 431 with Buru 100% and Operator, and EP 457 with Buru 60% and Operator, Rey Resources
40%)
Following portfolio rationalisation in 2025, activities within these licenses have focused on maintaining the assets in good standing
with minimal expenditure being incurred.
Corporate
On 6 January 2026, 79,166 share options with an exercise price of $0.03 were exercised in accordance with their terms.
On 3 March 2026, 49,100,000 Employee Performance Rights were issued in accord with the Buru 2026 Long Term Incentive (LTI)
scheme.
On 1 April 2026, Thomas Nador advised the Board of Buru of his resignation as Chief Executive Officer of the Company due to
ongoing personal health reasons. The Board of Buru Energy respects Thomas’ decision to prioritise his health and wellbeing and
expressed its sincere gratitude for his contribution and service to the Company. To ensure a seamless transition consistent with the
business continuity plans, Thomas’ executive duties and responsibilities will be assumed by David Maxwell (Chairman) and Joanne
Williams (Director) with support from Malcolm King (Director) until further notice.
On 17 April 2026, the Company announced an A$5.3M placement to fund critical pre-FID activities associated with engineering,
gas/condensate/LPG marketing and project approvals.
Buru’s Annual Report and Corporate Governance Statement & Appendix 4G were issued on 23 March 2026. Buru’s Annual General
Meeting will be held on 27 May 2025.
7
Financial
As at 31 March 2026, the Company had $2.0 million in cash and cash equivalents, with no debt. The ASX Appendix 5B attached to
this report contains the Company’s cash flow statement for the quarter which is summarised as follows:
Cashflows March 2026 Quarter Year to Date 2026
Opening cash $4.1m $4.1m
Exploration & Appraisal ($1.5m) ($1.5m)
Care and maintenance ($0.1m) ($0.1m)
Corporate & admin (net of interest income) ($0.5m) ($0.5m)
Total cash inflow / (outflow) ($2.1m) ($2.1m)
Closing cash $2.0m $2.0m
Exploration & Appraisal
Exploration cash outflows mainly consisted of appraisal expenditure for the Rafael Gas Project and geological and geophysical work
across the Canning Basin portfolio.
Care and Maintenance
Cash outflows for the quarter primarily consisted of fixed and monthly operating costs for the Ungani Production Facility whilst under
care and maintenance.
Corporate and Admin
Corporate and admin cash outflows were in line with the prior quarter. As outlined in the attached Appendix 5B (section 6.1), $84,000
in payments were made to related parties for Directors’ fees.
Authorisation
This ASX announcement has been authorised for release by the Buru Board of Directors.
For further information, visit www.buruenergy.com or contact Thomas Nador, Chief Executive Officer.
Telephone: +61 8 9215 1800
Freecall: 1800 337 330
Email: info@buruenergy.com
8
Appendix 1 – Buru’s Operational Areas
Figure 7 Buru’s Operational Areas in the Canning Basin of Western Australia
9
Appendix 2 – Schedule of interests in permits as at 31 March 2026
Permit Type Ownership Operator Location
L 61
Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 8 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 17 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 20 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 21 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
EP 1291
Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 391 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 428 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 431 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 436 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 457 Exploration permit 60.00% Buru Fitzroy Pty Ltd Canning Basin, WA
1
Buru’s interest in L6 and EP 129 exclude the Backreef Area.
10
About Buru Energy
Buru Energy is a Western Australian energy company headquartered in Perth with an operational office in Broome. The Company’s goal is to
deliver material benefits to its shareholders, the State of Western Australia, the Traditional Owners and communities of the areas in which it
operates. The Company plans to achieve this goal by building a compelling foundation Kimberley-based energy supply business based on its wholly
owned Rafael conventional gas and condensate discovery.
The Company’s petroleum assets and tenements are located onshore in the Canning Basin in the southwest Kimberley region of Western Australia.
In the Kimberley it operates and owns 100% of the conventional Ungani Oilfield project and owns and operates 100% of the conventional gas
condensate discovery at Rafael 1. It also operates a Canning Basin wide portfolio of exploration permits and licences prospective for conventional
and unconventional resources with working interests ranging from 60% to 100%.
Forward Looking Statements
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru Energy"). This report contains certain statements which
may constitute "forward-looking statements". It is believed that the expectations reflected in these statements are reasonable but they may be
affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including,
but not limited to: price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve and resource estimates, loss of
market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market
conditions in various countries and regions, political risks, project delays or advancements, approvals and cost estimates. All of Buru’s operations
and activities are subject to joint venture, regulatory and other approvals and their timing and order may also be affected by weather, availability of
equipment and materials and land access arrangements, including native title arrangements. Although Buru believes that the expectations raised in
this report are reasonable there can be no certainty that the events or operations described in this report will occur in the timeframe or order
presented or at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production, development expenditures,
operating expenses and cash flows. Oil and gas reserve engineering and resource assessment must be recognised as a subjective process of
estimating subsurface accumulations of oil and gas that cannot be measured in an exact way. Any contingent resources and prospective resources
presented in this report are pursuant to the Company’s ASX releases of 14 August 2025, 26 July 2024,17 June 2024 and 18 January 2018. The
estimates of contingent and prospective resources included in this Presentation have been prepared in accordance with the definitions and
guidelines set forth in the SPE PRMS. Buru Energy is not aware of any new information or data that materially affects the information included in
this presentation and all material assumptions and technical parameters underpinning the estimates in this presentation continue to apply and have
not materially changed.
The probabilistic method was used to prepare the estimates of the contingent and prospective resources. No representation or warranty, expressed
or implied, is made by Buru or any other person that the material contained in this report will be achieved or prove to be correct. Except for statutory
liability which cannot be excluded, each of Buru, its officers, employees and advisers expressly disclaim any responsibility for the accuracy or
completeness of the material contained in this report and excludes all liability whatsoever (including in negligence) for any loss or damage which
may be suffered by any person as a consequence if any information in this report or any error or omission there from. Neither Buru nor any other
person accepts any responsibility to update any person regarding any inaccuracy, omission or change in information in this report or any other
information made available to a person nor any obligation to furnish the person with any further information. All references to $ are in Australian
currency, unless stated otherwise.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BURU ENERGY LIMITED
ABN Quarter ended (“current quarter”)
71 130 651 437 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(629) (629)
(a) exploration & evaluation
(b) development - -
(c) production (care and maintenance) (132) (132)
(d) admin and corporate costs (staff) (241) (241)
(e) admin and corporate costs (other) (257) (257)
1.3 Dividends received (see note 3) - -
1.4 Interest received 37 37
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Net cash from / (used in) operating
activities
(1,222) (1,222)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (903) (903)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Others - -
2.6 Net cash from / (used in) investing
activities
(903) (903)
3. Cash flows from financing activities
- -
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options 2 2
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
2 2
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
4,149 4,149
4.2 Net cash from / (used in) operating
activities (item 1.8 above)
(1,222) (1,222)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(903) (903)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
(4) (4)
4.6 Cash and cash equivalents at end of
period
2,022 2,022
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 159 486
5.2 Term deposits 1,863 3,663
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,022 4,149
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
84
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of,
and an explanation for, such payments.
Amounts included in 6.1 are remuneration payments made to Directors.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Add notes as necessary for an understanding of
the sources of finance available to the entity.
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.8) (1,222)
8.2 Payments for exploration & evaluation classified as investing
activities (item 2.1(d))
(903)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (2,125)
8.4 Cash and cash equivalents at quarter end (item 4.6) 2,022
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 2,022
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.95
Note: if the entity has reported positive relevant outgoings (i.e. a net cash inflow) in item 8.3, answer
item 8.7 as “N/A”. Otherwise a figure for the estimated quarters of funding available must be included
in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: