Quarterly Activities and Cash Flow Report - Sep 2024
ASX: BRU
Rafael 1 well in EP 428
Quarterly Report
Period ended 30 September 2024
30 October 2024
Buru Energy Limited (Buru, Company) provides the quarterly report for the period ended 30
September 2024.
ASX: BRU
Chief Executive Officer’s comments on the Quarterly Report:
“Buru’s priority project and primary focus is developing a compelling foundation gas and
condensate (diesel replacement) business in the Kimberley, underpinned by the 100% owned
Rafael conventional wet gas discovery – the Rafael Project. The objective is to generate
significant durable cashflows from the project.
Confidence in the Rafael gas and condensate resource to underpin the development of the
Rafael Project increased during the quarter.
It is disappointing that two separate agreements with Sabre Energy to fund exploration and the
restart of the Ungani Oilfield had to be terminated due to Sabre’s failure to meet their financial
obligations.
Following the termination of the Sabre agreements Buru moved quickly to agree terms to fund
50% of the cost of drilling the Rafael Shallow oil prospect for 25% equity in the prospect and
raised $6.7 million.
I acknowledge and thank Mr Eric Streitberg who retired as Chair and Director of Buru Energy
on 15 August, and welcome Mr David Maxwell as the independent Non-executive Chair.
Buru is undergoing significant change as it transitions to becoming a gas Kimberley gas and
condensate producer.”
Thomas Z Nador, Chief Executive Officer
1
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Highlights during the Quarter
Rafael Deep Gas and Condensate Discovery
• The Rafael Deep discovery made by Buru in May 2022 is the only proven significant
conventional gas and condensate resource in onshore Western Australia north of
Karratha, Western Australia, providing Buru with a unique opportunity and impetus to
commercialise this resource.
•
Volumetric assessment following the 3D seismic results has seen the Rafael Contingent
Resource range narrow from previous estimates. The gross unrisked recoverable 1C
volumes increased from 59 Bscf to 85 Bscf of gas and from 1.2 MMstb to 1.8 MMstb of
condensate respectively.
•
The assessment has provided greater certainty that the 1C unrisked gross Contingent
Resource1 can provide sufficient production volumes to underpin the development of the
Rafael Project. This is Buru’s priority project which aims to supply the Kimberley market
with a local source of gas and condensate (diesel replacement).
Rafael Shallow Prospect
•
Buru terminated the Rafael Shallow Farm-in Agreement (Rafael Shallow FIA) with Sabre
Energy Pty Ltd (Sabre), due to Sabre’s inability to meet its obligations under the Rafael
Shallow FIA. The Rafael Shallow FIA included the funding of $6 million for the Rafael
Shallow 1 well for a 50% interest in the exploration well.
•
Buru executed binding Term Sheets to secure alternative funding of $3 million for the
Rafael Shallow 1 exploration well, with two entities associated with long-term Buru
shareholders to collectively earn a total 25% interest in a Commercial Discovery and
subsequent Production Licence
Ungani Oilfield
•
Buru terminated the Ungani Farm-in Agreement (Ungani FIA) with Sabre due to its
inability to meet its commitments under the Ungani FIA. The Ungani FIA involved a
funding contribution toward the drilling of the Mars exploration well, the restart of the
Ungani Oilfield and funding obligations toward future decommissioning liabilities for a
70% interest in the Ungani Oilfield production and exploration assets in Petroleum
Production Licences L 20 and L 21.
•
Buru is currently reviewing opportunities to re-establish revenues from the Ungani
Oilfield via a potential domestic offtake pathway.
Integrated Energy Projects (via wholly owned subsidiaries of Buru)
•
2H Resources continued discussions with key Native Title parties in relation to land
access agreement for its South Australian permit application areas.
•
Field testing of prototype continuous sensor equipment continued in preparation for a
soil gas sampling program associated with the Special Prospecting Authorities with
Acreage Options (SPA-AO’s) applied for in Western Australia.
Refer to ASX Release dated 26 July 2024 for full definitions and disclosures. Buru is not aware of
any new information or data that materially affects this assessment and that all material
assumptions and technical parameters underpinning the estimates continue to apply and have not
materially changed.
1
2
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Corporate
•
On 29 July 2024, Mr David Maxwell was appointed as a Non-executive Director of the
Company. On 15 August 2024, Mr Eric Streitberg retired from his position as Chair of
Buru and resigned as a Director of the Company. On the same day the Board agreed to
elect Mr David Maxwell as Chair.
•
On 30 September 2024, Buru announced the successful completion of an oversubscribed
and scaled back share placement of $6.7 million (before costs) at 6.2 cents per share
which was strongly supported by institutional and professional investors and Directors.
A shareholder General Meeting has been arranged for 21 November at which
Shareholder approval for the shares to be issued to Directors under the same terms as
the share placement will be sought.
Subsequent Events
•
On 9 October 2024, the Rafael Shallow Joint Venture, comprising Buru, Twinsouth
Holdings Pty Ltd and Jingie Investments Pty Ltd commenced drilling the Rafael Shallow
1 exploration well in EP 428.
•
On 23 October 2024, Buru announced that the Rafael Shallow 1 well was drilled safely,
on schedule and on budget but did not encounter moveable hydrocarbons. Subsequently
the well has been plugged and abandoned.
Activities during the Quarter
Rafael Deep Gas and Condensate Discovery (EP 428 – Buru 100%; EP 457 – 60%
Buru as Operator and 40% Rey Resources.)
The Rafael Deep discovery is the only proven significant conventional gas and condensate
resource in onshore Western Australia north of Karratha, providing Buru with a unique
opportunity to commercialise this resource.
The results of the analysis of the 3D seismic survey over the Rafael gas and condensate
discovery have been incorporated into the estimates of Contingent Resources2 in the
accumulation (Table 1).
Volumetric assessment following the 3D seismic results has seen the Rafael Contingent
Resource range narrow from previous estimates with the results increasing the gross
recoverable unrisked 1C volumes from 59 Bscf to 85 Bscf of gas and from 1.2 MMstb to 1.8
MMstb of condensate respectively.
The assessment has provided greater certainty that the 1C Contingent Resource can provide
sufficient production volumes to underpin the development of Buru’s priority Rafael Project
planned to supply the Kimberley market with a local source of gas and condensate.
Refer to ASX Release dated 26 July 2024 for full definitions and disclosures. Buru is not
aware of any new information or data that materially affects this assessment and that all
material assumptions and technical parameters underpinning the estimates continue to
apply and have not materially changed.
2
3
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
In line with the target development schedule to deliver the Rafael Project in the required
timeframe to meet projected regional Kimberley gas demand by 2027, key work during the
quarter focused on:
-
preparation for Rafael 1 well testing/completion and Rafael B appraisal drilling in 2025,
progression of SELECT phase engineering and design,
project approvals, including Native Title negotiations,
commercial discussions with potential development partners and offtakers, and
identification of the alternative financing pathways for the project.
More detailed technical work on the Rafael accumulation is underway and is expected to
provide additional insights into the 3C resource volume upside.
Oil and Condensate (MMstb)
Gas (Bscf)
1C
2C
3C
1C
2C
3C
Gross Contingent Resources
1.8
4.5
10.6
85
220
523
Net to Buru Contingent Resources
1.6
3.6
8.1
76
176
401
Table1: Rafael Structure probabilistic Contingent Resources (as at 26 July 2024)
Refer to ASX Release dated 26 July 2024 for full definitions and disclosures. Buru is not aware
of any new information or data that materially affects this assessment and that all material
assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed.
Rafael Shallow Prospect (EP 428 – Buru 75%)
On 24 April 2024 Buru announced that following the interpretation of the Rafael 3D seismic
survey data, it had identified a high potential, relatively shallow oil prospect in EP 428,
partially overlying the Rafael 1 gas and condensate accumulation.
On 5 August 2024 Buru announced it had entered into a Farm-in Agreement (Rafael Shallow
FIA) with Sabre Energy Pty Ltd (Sabre) for the drilling of the Rafael Shallow 1 exploration
well in EP 428 in Western Australia’s onshore Canning Basin. The transaction involved Sabre
carrying Buru for $6 million of the costs associated with the drilling and testing of the Rafael
Shallow exploration well to earn a 50% interest in a commercial discovery and subsequent
Production Licence, with Buru retaining 50% interest and Operatorship.
Following lengthy discussions, Sabre failed to meet their financial obligations under the
Rafael Shallow FIA. Therefore, during the quarter Buru and Sabre executed agreements to
terminate the Rafael Shallow FIA.
On 26 September 2024, Buru executed binding Term Sheets to secure alternative funding of
$3 million for the Rafael Shallow 1 exploration well, with two entities associated with longterm Buru shareholders to collectively earn a total 25% interest in a commercial discovery
and subsequent Production Licence.
4
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
On 26 September 2024, Buru executed a Rig Hire Agreement with Silver City Drilling for Rig
24, and on 9 October 2024, the Rafael Shallow 1 well was spudded.
On 23 October 2024, Buru announced that the Rafael Shallow 1 well was drilled safely, on
schedule and on budget but did not encounter moveable hydrocarbons. The well has
subsequently been plugged and abandoned.
Ungani Oilfield (L20/L21 - Buru 100%)
During the quarter Buru terminated the Ungani Farm-in Agreement (Ungani FIA) with Sabre
Energy Pty Ltd (Sabre) for a 70% interest in the Ungani Oilfield production and exploration
assets in Petroleum Production Licences L 20 and L 21 due to Sabre’s inability to meet their
commitments under the Ungani FIA.
Buru is currently reviewing opportunities to re-establish production and revenues from the
Ungani Oilfield via a potential domestic offtake pathway and investigate near-field
exploration to extend production beyond the current field life.
Integrated Energy Projects
During the quarter, and at minimum cost, 2H Resources continued to negotiate with key
Traditional Owner groups in South Australia to secure land access across its Petroleum
Exploration Licence Application areas (PELAs), a prerequisite to the granting of Petroleum
Exploration Licences (PELs) and on ground activity. 2H Resources also continued the field
testing of prototype continuous sensor equipment in preparation for its planned soil gas
sampling programs.
During the quarter, and at minimum cost, GeoVault continued its efforts across technical,
commercial and stakeholder work fronts, including engagement with CO2 emitters, potential
project partners and state and federal government on policy and regulations. GeoVault
continues to support Buru’s development priority to commercialise its Rafael gas and
condensate discovery in the Canning Basin of Western Australia.
The Sipa Resources / Buru Joint Venture completed its planned ground gravity survey, with
initial results of the survey highlighting a significant gravity anomaly as well as structural
complexity in a priority area at the Barbwire Terrace Project. Exploration is targeting
Mississippi Valley style zinc-lead-silver deposits, similar to the Lennard Shelf deposits,
located on the northern side of the Fitzroy trough. The survey received an award for
Exploration Incentive Scheme (EIS) co-funding, with 50% of the survey costs to be
reimbursed by the Western Australia Government.
5
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Financial
As at 30 September 2024, the Company had ~$7.5 million in cash and cash equivalents,
with no debt. The ASX Appendix 5B attached to this report contains the Company’s cash flow
statement for the quarter which is summarised as follows:
Cashflows
Opening cash
Exploration
Care and maintenance
Corporate & admin (net of interest income)
Joint Venture partner exit consideration
Share placement1
Total cash inflow / (outflow)
Closing cash
September 2024
Quarter
$10.9m
($2.0m)
($0.8m)
($0.7m)
$0.1m
($3.4m)
$7.5m
Year to date 2024
1 Initial cash received from the share placement announced on 30 September 2024, refer page 3
$18.2m
($10.5m)
($1.7m)
($2.0m)
$3.4m
$0.1m
($10.7m)
$7.5m
Exploration:
Exploration cash outflows mainly consisted of well
planning and civils expenditure for the Rafael Shallow
exploration well, and geological and geophysical work
across the Canning Basin portfolio.
Care and maintenance:
Cash outflows for the quarter primarily consisted of
fixed and monthly operating costs for the Ungani
Production Facility whilst under care and maintenance.
Corporate and Admin:
Corporate and admin cash outflows included corporate
advisory services associated with the marketing and
partner selection processes for the Company’s portfolio
of assets. As outlined in the attached Appendix 5B
(section 6.1), $144,000 in payments were made to
related parties for Directors’ fees.
Authorisation
This ASX announcement has been authorised for release by the Board of Directors of Buru
Energy.
For further information, visit www.buruenergy.com or contact
Thomas Nador, Chief Executive Officer
Telephone: +61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
6
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Appendix 1 - Buru’s Operational Areas
Figure 1 – Operational areas in the Canning Basin
7
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Figure 2 – 2H Resources Exploration Licence application areas in South Australia
Figure 3 - 2H Resources Western Australian application areas
8
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Appendix 2 - Schedule of interests in permits as at 30 September 2024
Permit
L 61
L8
L 17
L 20
L 21
EP 1291
EP 391
EP 428
EP 431
EP 436
EP 457
E04/2674
E04/2684
1
Type
Production licence
Production licence
Production licence
Production licence
Production licence
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Exploration permit
Ownership
Operator
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
60.00%
50.00%
50.00%
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Energy Ltd
Buru Fitzroy Pty Ltd
Sipa Resources Pty Ltd
Sipa Resources Pty Ltd
Location
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Canning Basin, WA
Buru’s interest in L6 and EP 129 exclude the Backreef Area.
About Buru Energy
Buru Energy Limited (ASX: BRU) is a Western Australian energy company headquartered in Perth with an operational office in
Broome. The Company’s goal is to deliver material benefits to its shareholders, the State of Western Australia, the Traditional
Owners and communities of the areas in which it operates, by successfully exploring for and developing petroleum resources
and by contributing to driving the energy transition in an environmentally and culturally sensitive manner.
The Company’s petroleum assets and tenements are located onshore in the Canning Basin in the southwest Kimberley region
of Western Australia. In the Kimberley it operates and owns 100%1 of the conventional Ungani Oilfield project and owns and
operates 100% of the conventional gas condensate discovery at Rafael 1. It also operates a Canning Basin wide portfolio of
exploration permits and licences prospective for conventional and unconventional resources with working interests ranging from
60% to 100%.
Buru Energy is also participating in the new energy economy through its subsidiary companies’ activities in natural hydrogen
and helium exploration, carbon capture and storage, and battery minerals exploration.
Forward Looking Statements
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru Energy"). This report contains certain
statements which may constitute "forward-looking statements". It is believed that the expectations reflected in these
statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which
could cause actual results or trends to differ materially, including, but not limited to: price fluctuations, actual demand, currency
fluctuations, drilling and production results, reserve and resource estimates, loss of market, industry competition,
environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market conditions
in various countries and regions, political risks, project delays or advancements, approvals and cost estimates. All of Buru’s
operations and activities are subject to joint venture, regulatory and other approvals and their timing and order may also be
affected by weather, availability of equipment and materials and land access arrangements, including native title arrangements.
Although Buru believes that the expectations raised in this report are reasonable there can be no certainty that the events or
operations described in this report will occur in the timeframe or order presented or at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production,
development expenditures, operating expenses and cash flows. Oil and gas reserve engineering and resource assessment must
be recognised as a subjective process of estimating subsurface accumulations of oil and gas that cannot be measured in an
exact way. Any contingent resources and prospective resources presented in this report are pursuant to the Company’s ASX
releases of 24 April 2024 and 26 July 2024. The estimates of contingent and prospective resources included in this Presentation
have been prepared in accordance with the definitions and guidelines set forth in the SPE PRMS. Buru Energy is not aware of
any new information or data that materially affects the information included in this presentation and all material assumptions
and technical parameters underpinning the estimates in this presentation continue to apply and have not materially
changed. The probabilistic method was used to prepare the estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other person that the material contained in this
report will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of Buru, its officers,
employees and advisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in
this report and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any
person as a consequence if any information in this report or any error or omission there from. Neither Buru nor any other
person accepts any responsibility to update any person regarding any inaccuracy, omission or change in information in this
report or any other information made available to a person nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
9
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BURU ENERGY LIMITED
ABN
Quarter ended (“current quarter”)
71 130 651 437
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 September 2024
Current quarter
$A’000
Year to date (9
months)
$A’000
-
-
(1,468)
(4,369)
-
-
(c) production (care and maintenance)
(767)
(1,696)
(d) admin and corporate costs (staff)
(580)
(1,743)
(e) admin and corporate costs (other)
(260)
(769)
-
-
97
394
(a) exploration & evaluation
(b) development
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
247
1.8
Net cash from / (used in) operating
activities
(2,978)
(7,936)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(537)
(6,333)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (JV partner exit consideration)
-
3,367
2.6
Net cash from / (used in) investing
activities
(537)
(2,966)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
100
100
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(22)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
100
78
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
10,891
18,197
4.2
Net cash from / (used in) operating
activities (item 1.8 above)
(2,978)
(7,936)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(537)
(2,966)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
100
78
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
(10)
93
4.6
Cash and cash equivalents at end of
period
7,466
7,466
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
3,803
2,228
5.2
Term deposits
3,663
8,663
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7,466
10,891
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
144
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of,
and an explanation for, such payments.
Amounts included in 6.1 are remuneration payments made to Directors.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.8)
8.2
Payments for exploration & evaluation classified as investing
activities (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(3,515)
8.4
Cash and cash equivalents at quarter end (item 4.6)
7,466
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
7,466
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.12
-
$A’000
(2,978)
(537)
-
Note: if the entity has reported positive relevant outgoings (i.e. a net cash inflow) in item 8.3, answer
item 8.7 as “N/A”. Otherwise a figure for the estimated quarters of funding available must be included
in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all questions 8.8.1, 8.8.2 and 8.8.3 above must be
answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 October 2024
Authorised by: The Buru Board of Directors
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fai