Quarterly Activities and Cash Flow Report - Sep 2025
Buru Energy Limited Level 2, 16 Ord Street, West Perth WA 6005
Telephone: 1800 337 330 Email: info@buruenergy.com ABN: 71 130 651 437
Quarterly Activities Report
For the period ending 30 September 2025
10 October 2025
Buru Energy Limited
ASX:BRU
Buru Energy Limited (Buru, Company)
provides the Quarterly Report for the period
ending 30 September 2025.
Quarter Highlights, including
material subsequent events
Received government approval for a 2-
year extension to apply for a Production
Licence over the Rafael Gas and
Condensate Field.
Received environmental approval for the
2026 Rafael resource appraisal
campaign.
Identified potentially material Flying Fox
Prospect beneath the proven Rafael
gas/condensate accumulation.
Executed transactions with Koloma
Australia Pty Ltd for the sale of Buru’s
subsidiary company 2H Resources Pty
Ltd and certain non-core exploration and
production blocks in the onshore
Canning Basin for a total acquisition
consideration of up to $2.0 million and a
tradeable buy-back option for any future
hydrogen project development from a
discovery by 2H Resources.
Completed Share Placement for $2.1
million, with further funds of $1.4 million
from a Share Purchase Plan (SPP) and
$0.95 million from a SPP Shortfall
Placement.
Mr Robert Willes retired from his position
as Non-Executive Director of Buru
effective 30 September 2025.
Capital Structure
Shares on issue: 885.7 million
Market capitalisation1: $16.8 million
Cash2: $3.2 million
Debt: Nil
12-month high: 7.5c
12-month low: 1.7c
1 - As at 30 September 2025
2 - As at 30 September 2025
Chief Executive Officer’s comments
“As we conclude another productive quarter, I am excited to share several
significant achievements that reflect our ongoing commitment to value creation
through the timely development of the Rafael Gas Project.
On the approvals front, we have successfully received a 2-year extension from
the government to apply for a Production Licence over the Rafael Gas and
Condensate Field, allowing us more time to derisk this crucial asset.
Importantly, we have also received environmental approval for the planned
2026 drilling campaign, which assists our ongoing efforts to secure funding for
the 2026 program.
Securing funding for this work is front and centre for Management, and the
process is underway to attract interested parties, both Australian and
international, looking for a relatively low-risk entry option to participate in a
valuable gas business with growth.
Our exploration team has identified the material Flying Fox Prospect located
beneath the proven Rafael gas/condensate accumulation. A successful
discovery could significantly enhance our resource base and future potential
production opportunities in addition to Rafael.
During the quarter, we executed agreements with Koloma Australia Pty Ltd for
the sale of our subsidiary, 2H Resources Pty Ltd, along with certain non-core
exploration and production blocks in the onshore Canning Basin – concluding
our non-core asset divestment program.
We successfully completed a Share Placement, a Share Purchase Plan and an
SPP Shortfall Placement, raising a total of $4.4 million. This enables Buru to
deliver on our work program under the Strategic Development Agreement with
Clean Energy Fuels Australia (CEFA).
We acknowledge the retirement of Mr. Robert Willes as Non-Executive
Director of Buru. We are grateful for his contributions and wish him well in his
future endeavours.
As we move forward, I assure shareholders of our unwavering commitment to
executing our strategic vision and creating long-term value. Our activities and
energy are focused on the development of the Rafael Gas Project and first
projected material cashflow in 2028.”
Thomas Z Nador
Chief Executive Officer
2
Activities during the Quarter
Rafael Gas Project Development
(EP 428 – Buru 100% and Operator)
The development of the Rafael Gas Project (Rafael) represents the most valuable opportunity within Buru's portfolio, uniquely
positioned to replace a legacy, costly and insecure energy system in the north of Western Australia that currently relies on imports
from outside the region. Buru has full ownership of the Rafael conventional gas and condensate resource, which has the potential to
generate significant operating cashflows within 2 years from Final Investment Decision (FID).
On 7 July 2025, the Company announced that it has received approval from the Western Australian Government Department of
Mines, Petroleum and Exploration (DMPE) for a two year extension of time in which to apply for a Petroleum Production Licence or
Petroleum Retention Lease over the Rafael gas and condensate field location in Exploration Permit EP 428 in the Canning Basin.
This approval will allow important work to be completed, including the maturation of technical and commercial work with our
development partner, Clean Energy Fuels Australia (CEFA).
During the quarter work continued on the upcoming Rafael appraisal program planned for the 2026 financial year. Buru has now
determined the optimum drilling and testing sequence is to drill, complete and production test Rafael B and then recomplete Rafael
1 with both wells likely to include horizontal sections to optimise deliverability and the maximisation of reserves recovery (see figure
1 below). Well planning is currently underway with the drilling and testing activity expected to be undertaken from June 2026.
Figure 1 – Rafael Gas Project Schematic
3
The current Rafael Gas Project Schedule shows a Final Investment Decision (FID), targeted to be early 3Q 2026 (as per figure 2
below).
Figure 2 Rafael Gas Project Schedule
The Rafael Economic Screening illustrated in Figure 3 below highlights the potential value of Rafael, demonstrating that the
development of the Rafael Gas Project represents a transformational value opportunity for Buru.
Based on assumptions of A$15/GJ for gas and A$1.50 per litre for condensate, the value generated by Rafael is projected to yield a
gross unrisked NPV of A$400 million (100% equity total project economics), along with an annual gross cash flow before tax of
approximately A$70 million1
.
Figure 3 – Rafael Gas Project Economic Screening
1
Based on assumptions of A$15/GJ for gas and A$1.50 per litre for condensate, the value generated by Rafael is projected to yield
a gross unrisked NPV of A$400 million (100% equity total project economics), along with an annual gross cash flow before tax of
approximately A$70 million.
4
Flying Fox Prospect
(EP 428 – Buru 100% and Operator)
On 14 August 2025 Buru announced that a new exploration prospect, named Flying Fox had been identified following work on the
interpretation of the Rafael 3D Seismic acquired in 2023. The Flying Fox Prospect lies immediately beneath the main Rafael gas and
condensate field at a depth of approximately 4,015m TVDSS2
.
The Flying Fox Prospect has been assessed to contain Prospective Resources between 60 Bscf and 614 Bscf of gas, with a best
estimate (P50) volume of 247 Bscf, and between 1.2 MMstb and 12.6 MMstb of condensate with a best estimate (P50) of 5.0 MMstb.
This is similar in size to the Contingent Resources3
assessed for the primary Rafael reservoir interval which currently forms the basis
for the Rafael Gas Project. The Flying Fox Prospect can be tested by drilling an incremental ~500 meters below the Rafael gas
accumulation at the Rafael B target location.
Chance of
Success
Condensate (MMstb) Gas (Bscf)
(COS) 1U 2U 3U 1U 2U 3U
Gross Prospective Resources 45 1.2 5.0 12.6 60 247 614
Net Prospective Resources 45 1.1 4.6 11.3 57 226 551
Figure 4 – Flying Fox Prospective Resources4
The Flying Fox Prospect has been imaged on the acquired Rafael 3D seismic, immediately beneath the gas-bearing Ungani Dolomite
(T20) of the Rafael 1 discovery. The primary reservoir target of the gas prospect is the dolomitised, vuggy (rocks with cavities, pores
or voids) carbonates of the Nullara or Pillara Formation overlain by the sealing shales of the May River Formation.
Figure 5 – Flying Fox Prospective location below main Rafael structure
2
True Vertical Depth Subsea. 3
Refer to the ASX release of 26 July 2024 for full definitions and disclosures. Buru is not aware of any
new information or data that materially affects this assessment and that all material assumptions and technical parameters
underpinning the estimates continue to apply and have not materially changed. 4
Refer to the ASX release of 14 August 2025 for full
definitions and disclosures. Buru is not aware of any new information or data that materially affects this assessment and that all
material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
5
Ungani Oilfield
(L 20/L 21 – Buru 100%)
The Ungani Oilfield assets remain under a care and maintenance program. The restart of Ungani production requires the renegotiation
of certain commercial terms pursuant to the existing Ungani Native Title agreements and requisite field management regulatory
approvals.
Buru continues to explore opportunities to add incremental oil production from near-field prospects located within tie-back distance
to the Ungani production facilities, with Mars being the primary target located approximately 9km north of the Ungani production
facilities in Production Licence L 20.
Mars is a large fault-bounded anticlinal closure up-dip from the interpreted oil pay in the Ungani North 1 well that is confidently defined
on high quality modern 3D seismic data. The prospect was initially identified on the Ungani 3D seismic, with the structure confirmed
on the reprocessed Ungani 3D pre-stack depth migration volume in 2019.
Ungani North 1 confirmed excellent reservoir quality within the Reeves Formation sandstones with 17% porosity measured from
sidewall cores at 1,765m. Strong oil shows in several sidewall cores recovered from sands of the Reeves Formation at Ungani North
1 provides confidence of oil charge into the Mars structure. Buru’s internal assessment indicates a chance of success of 40% for a
Mars 1 well5
.
Buru is continuing activities to seek a farmout partner for the Mars Prospect, with any potential exploration success providing strategic
optionality and funding for Buru’s Rafael Gas Project development.
Figure 6 – Section A-A’ from Ungani Far West 1 (UFW1) to Mars Prospect
5
.Further details on the Mars Prospect can be found in the ASX announcement released on 17 June 2024, and can be accessed
here: https://buruenergy.com/announcements/6385907
6
Canning Basin Exploration
Remaining Acreage Position
(L 6, L 8, L 17, EP 129, EP 391, EP 431 and EP 436 with Buru 100% and Operator, and EP 457 with Buru 60% and Operator,
Rey Resources 40%)
During the quarter, the Western Australian Government Department of Mines, Petroleum and Exploration (DMPE) approved work
program changes, and seven partial title surrender applications across the Company’s exploration acreage in the Canning Basin.
The outcome of this rationalisation is a ~60% reduction in exploration permit and production licence areas, as well as the associated
regulatory holding costs and work commitments.
Integrated Energy Projects
2H Resources Pty Ltd (Buru 100%)
During the quarter Buru completed the divestment of 2H Resources Pty Ltd (2HR).
On 10 July 2025 the Company announced that it has executed a Share Sale and Purchase Agreement (SSPA) with Koloma Australia
Pty Ltd (Koloma) for all the issued share capital of 2HR which includes the beneficial interest in all its Petroleum Exploration Licence
Application (PELA) areas and Gas Storage Exploration Licence Application (GSELA) areas in South Australia, Exploration Licences
(EL) in Tasmania, and Special Prospecting Authorities (SPA) in Western Australia.
The total cash consideration was $1.75 million which is made up as $0.75 million on Completion, and further staged cash payments
up to $1.0 million payable upon the phased conversion of 2HR’s South Australian Petroleum Exploration Licence Application (PELA)
areas to Exploration Licences – expected in total by the end of 2026. Buru has an option to acquire a participating interest of up to
30% or $100 million in connection with any future hydrogen discovery by 2HR. This buy-back option is tradable by Buru.
On 7 August 2025, all Completion obligations unde the SSPA were met, accordingly, all the issued share capital of 2HR which
includes the beneficial interest in all its Petroleum Exploration Licence Application (PELA) areas and Gas Storage Exploration Licence
Application (GSELA) areas in South Australia, Exploration Licences (EL) in Tasmania, and Special Prospecting Authorities (SPA) in
Western Australia have been transferred from Buru to Koloma, with Koloma accountable for 2HR’s operational control, costs and
work program commitments from 1 July 2025.
Buru also executed an Asset Sales and Purchase Agreement (ASPA) with Koloma for certain graticular blocks in the Canning Basin
of Western Australia for an amount equal to $0.25 million upon Completion. These blocks are non-core to Buru and were part of
Buru’s Canning Basin rationalisation process. Buru and Koloma continue to work toward Completion associated with the (ASPA).
The 2HR divestment supports the Company’s strategy of directing capital and resources to the development of the Rafael Gas Project
to generate long term stable and growing cashflow.
Corporate
On 1 September 2025 Buru completed a Share Placement with a number of Buru’s major shareholders as well as new sophisticated
and professional investors raising a total of some $2.1 million. A Share Purchase Plan was also launched on 8 September 2025 and
closed on 7 October 2025, alongside a SPP Shortfall Placement a total amount of $2.35 million was raised.
Funds raised will support Buru’s activities identified under its Strategic Development Agreement with Clean Energy Fuels Australia
(CEFA) to co-develop the Rafael Gas Project. These activities are required to be finalised ahead of binding agreements with CEFA
and Final Investment Decision planned for 2H 2026, and for working capital purposes.
On 4 September 2025, Buru held an investor webinar, which gave Buru Shareholders the opportunity to engage with the Buru CEO
Thomas Nador.
7
On 17 September 2025, 1,270,000 fully paid ordinary shares were issued following the exercise of 1,270,000 vested performance
rights to employees in accordance with the Company’s Employee Incentive Performance Rights Plan.
On 30 September 2025 Mr Robert Willes retired from his position as Non-Executive Director of Buru. The Board has no current plans
to appoint an additional director following Mr Willes’ departure, with the Board size being reduced to 3 non-executive members. This
is one of several measures implemented this year supporting the commitment to prudent cost management.
Financial
As at 30 September 2025, the Company had $3.2 million in cash and cash equivalents, with no debt. The ASX Appendix 5B attached
to this report contains the Company’s cash flow statement for the quarter which is summarised as follows:
Cashflows September 2025 Quarter Year to Date 2025
Opening cash $2.3m $7.9m
Exploration & Appraisal ($1.8m) ($6.0m)
2HR divestment $0.7m $0.7m
Care and maintenance ($0.1m) ($0.6m)
Corporate & admin (net of interest income) ($0.3m) ($1.6m)
Government grants and tax incentives $0.4m $0.8m
Proceeds from issues of equity (net of costs) $2.0m $2.0m
Total cash inflow / (outflow) $0.9m ($4.7m)
Closing cash $3.2m $3.2m
Exploration & Appraisal
Exploration cash outflows mainly consisted of appraisal expenditure for the Rafael Gas Project and geological and geophysical work
across the Canning Basin portfolio.
Care and Maintenance
Cash outflows for the quarter primarily consisted of fixed and monthly operating costs for the Ungani Production Facility whilst under
care and maintenance.
Corporate and Admin
Corporate and admin cash outflows were in line with the prior quarter. As outlined in the attached Appendix 5B (section 6.1), $106,000
in payments were made to related parties for Directors’ fees.
Authorisation
This ASX announcement has been authorised for release by the Buru Board of Directors.
For further information, visit www.buruenergy.com or contact Thomas Nador, Chief Executive Officer.
Telephone: +61 8 9215 1800
Freecall: 1800 337 330
Email: info@buruenergy.com
8
Appendix 1 – Buru’s Operational Areas
Figure 7 Buru’s Operational Areas in the Canning Basin of Western Australia
9
Appendix 2 – Schedule of interests in permits as at 30 September 2025
Permit Type Ownership Operator Location
L 61
Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 8 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 17 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 20 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
L 21 Production licence 100.00% Buru Energy Ltd Canning Basin, WA
EP 1291
Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 391 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 428 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 431 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 436 Exploration permit 100.00% Buru Energy Ltd Canning Basin, WA
EP 457 Exploration permit 60.00% Buru Fitzroy Pty Ltd Canning Basin, WA
1
Buru’s interest in L6 and EP 129 exclude the Backreef Area.
10
About Buru Energy
Buru Energy is a Western Australian energy company headquartered in Perth with an operational office in Broome. The Company’s goal is to
deliver material benefits to its shareholders, the State of Western Australia, the Traditional Owners and communities of the areas in which it
operates, by successfully exploring for and developing petroleum resources and by contributing to driving the energy transition in an
environmentally and culturally sensitive manner.
The Company’s petroleum assets and tenements are located onshore in the Canning Basin in the southwest Kimberley region of Western Australia.
In the Kimberley it operates and owns 100% of the conventional Ungani Oilfield project and owns and operates 100% of the conventional gas
condensate discovery at Rafael 1. It also operates a Canning Basin wide portfolio of exploration permits and licences prospective for conventional
and unconventional resources with working interests ranging from 60% to 100%.
Forward Looking Statements
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru Energy"). This report contains certain statements which
may constitute "forward-looking statements". It is believed that the expectations reflected in these statements are reasonable but they may be
affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including,
but not limited to: price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve and resource estimates, loss of
market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market
conditions in various countries and regions, political risks, project delays or advancements, approvals and cost estimates. All of Buru’s operations
and activities are subject to joint venture, regulatory and other approvals and their timing and order may also be affected by weather, availability of
equipment and materials and land access arrangements, including native title arrangements. Although Buru believes that the expectations raised in
this report are reasonable there can be no certainty that the events or operations described in this report will occur in the timeframe or order
presented or at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production, development expenditures,
operating expenses and cash flows. Oil and gas reserve engineering and resource assessment must be recognised as a subjective process of
estimating subsurface accumulations of oil and gas that cannot be measured in an exact way. Any contingent resources and prospective resources
presented in this report are pursuant to the Company’s ASX releases of 26 July 2024 and 14 August 2025. The estimates of contingent and
prospective resources included in this Presentation have been prepared in accordance with the definitions and guidelines set forth in the SPE
PRMS. Buru Energy is not aware of any new information or data that materially affects the information included in this presentation and all material
assumptions and technical parameters underpinning the estimates in this presentation continue to apply and have not materially changed.
The probabilistic method was used to prepare the estimates of the contingent and prospective resources. No representation or warranty, expressed
or implied, is made by Buru or any other person that the material contained in this report will be achieved or prove to be correct. Except for statutory
liability which cannot be excluded, each of Buru, its officers, employees and advisers expressly disclaim any responsibility for the accuracy or
completeness of the material contained in this report and excludes all liability whatsoever (including in negligence) for any loss or damage which
may be suffered by any person as a consequence if any information in this report or any error or omission there from. Neither Buru nor any other
person accepts any responsibility to update any person regarding any inaccuracy, omission or change in information in this report or any other
information made available to a person nor any obligation to furnish the person with any further information. All references to $ are in Australian
currency, unless stated otherwise.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BURU ENERGY LIMITED
ABN Quarter ended (“current quarter”)
71 130 651 437 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(940) (3,643)
(a) exploration & evaluation
(b) development - -
(c) production (care and maintenance) (95) (601)
(d) admin and corporate costs (staff) (119) (834)
(e) admin and corporate costs (other) (255) (837)
1.3 Dividends received (see note 3) - -
1.4 Interest received 6 103
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives 428 751
1.8 Net cash from / (used in) operating
activities
(975) (5,061)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (840) (2,343)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
2.2 Proceeds from the disposal of:
750 750
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Others - -
2.6 Net cash from / (used in) investing
activities
(90) (1,593)
3. Cash flows from financing activities
2,100 2,100
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(130) (142)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
1,970 1,958
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
2,342 7,944
4.2 Net cash from / (used in) operating
activities (item 1.8 above)
(975) (5,061)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(90) (1,593)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
1,970 1,958
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- (1)
4.6 Cash and cash equivalents at end of
period
3,247 3,247
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 1,384 2,203
5.2 Term deposits 1,863 139
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,247 2,342
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
106
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of,
and an explanation for, such payments.
Amounts included in 6.1 are remuneration payments made to Directors.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.8) (975)
8.2 Payments for exploration & evaluation classified as investing
activities (item 2.1(d))
(840)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,815)
8.4 Cash and cash equivalents at quarter end (item 4.6) 3,247
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 3,247
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.79
Note: if the entity has reported positive relevant outgoings (i.e. a net cash inflow) in item 8.3, answer
item 8.7 as “N/A”. Otherwise a figure for the estimated quarters of funding available must be included
in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: No, the Company continues to review and rationalise its working capital
requirements.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, as per the announcement on 1 September 2025, the Company completed a
Share Placement to raise a total of $2.1 million (before costs). A Share Purchase
Plan was also launched on 8 September 2025 and closed on 7 October 2025,
alongside a SPP Shortfall Placement a total amount of $2.35 million (before costs)
was raised.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
Answer: Yes, the Company expects to be able to continue its operations and to meets its
business objectives based on the current cash flow forecast prepared for internal
purposes.
Note: where item 8.7 is less than 2 quarters, all questions 8.8.1, 8.8.2 and 8.8.3 above must be
answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 10 October 2025
Authorised by: The Buru Board of Directors
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report ha
Share your feedback
Discover