ASX Announcement
27 May 2026
2026 Annual General Meeting – Chair’s Address and Presentation
Buru Energy Limited (Buru, Company) is pleased to provide the Chair’s address and presentation for the Buru Energy
Limited (ASX: BRU) 2026 Annual General Meeting (AGM) which commences at 9.00am (AWST) today.
Authorisation
This ASX announcement has been authorised for release by the Chair of the Board of Directors.
For further information, visit www.buruenergy.com or contact:
David Maxwell
Chair
Telephone: +61 8 9215 1800
Freecall: 1800 337 330
Email: info@buruenergy.com
Chair’s Address to the 2026 Buru Energy Ltd Annual General Meeting
27 May 2026
In 2025 Buru streamlined the Company’s portfolio, significantly reduced the costs, focussed on and advanced the
Rafael Gas Project and cleared a number of regulatory hurdles required for an ultimate Rafael Final Investment
Decision (FID). This morning, I will not repeat commentary that we included in the 2025 Annual Report. Rather, I will
focus mainly on: the Rafael Gas Project; more recent developments; address a number of issues the Company has
had to manage; and the future plans.
Firstly, I want to acknowledge and thank the Buru team for their commitment. I also acknowledge Mr Thomas Nador
and thank him for his unwavering leadership and significant contribution through what has been a challenging time
of change. It was unfortunate that, for health reasons, Thomas tended his resignation which was effective 8 May
2026. We wish him all the best for his health and the future.
To maintain and increase the momentum with the Rafael Gas Project, I have agreed to step in as full-time Executive
Chair with support from Joanne Williams (Director) also moving to a part-time executive role. This has been a
seamless transition. Joanne and I have agreed to do this for no increase in director fees or salary as a short to
medium-term arrangement. The Board will seek external advice in considering whether some performance-based
compensation is appropriate in the near future.
We will appoint a new Chief Executive Officer/Managing Director when we find the right person with the skills and
experience required to lead Buru. Until then Joanne and I are committed to continuing to implement the plans in
place while in our respective executive roles.
The Rafael Gas Project is a transformational opportunity for Buru. Rafael:
• can generate material long term cash flow;
• provides the foundation for future further growth opportunities; and
• represents a significant increase in value for Buru shareholders.
The value of 100% of Rafael is independently assessed to be more than A$600 million on a 100% unrisked basis1.
Even allowing for very significant risking, the Rafael Project value is more than 7 times the current Buru market
capitalisation. The Rafael value multiplier for Buru is very material, especially as the Project reaches derisking
milestones such as project approvals, reserves certification and FID. Therefore, how to preserve as much of this
value as possible for Buru shareholders is upper most in the Board’s thinking, whilst maintaining and increasing the
Rafael Project momentum.
The Rafael Gas Project involves:
• gas production from the Rafael gas and liquids resource in the onshore Canning Basin, Western Australia;
• small scale LNG and liquids plant. Buru has a strategic development arrangement with Clean Energy Fuels
Australia (CEFA) to build, own and operate the LNG and liquids plant and storage;
• Buru produces the gas and pays CEFA a tariff to process the gas to LNG and the liquids streams; and
• Buru and CEFA will cooperate on the LNG and liquids products marketing – mainly to customers in the
Kimberley/NW Western Australia region.
1
MSTAccess analysis dated 4 May 2026.
Slide: Rafael Gas Project
Rafael has a number of unique benefits. Natural gas (in the form of LNG) and liquids are currently imported into the
greater Kimberley region. When compared to existing supply, the Rafael Field development will deliver cost and
emissions advantages due to shorter transport distances, as well as increased energy security and more benefits for
the region. Further, Rafael is an enabler for renewables. As a consequence of its location and gas composition,
Rafael has a number of clearly unique and valuable competitive advantages.
Slide: Rafael – proven resource with material upside
Rafael is a proven gas and liquids resource. The Rafael Contingent Resource based on the T20 reservoir interval
only is between 85 Bscf (on a P90 basis) and 523 Bscf (on a P10 basis) for gas and a condensate resource range
of 1.8 MMstb (P90) to 10.6 MMstb (P10).
Slide: Rafael location delivers regional supply advantage
The natural markets for Rafael are gas fired power generation in the greater Kimberley region and mining and
minerals processing projects. We are also analysing the liquids fuels market (e.g. diesel and LPG) to understand and
fully value this opportunity for Buru and Rafael. The preliminary analysis is very encouraging.
Beyond the foundation Rafael Gas Project we see opportunity to supply gas and maybe liquid fuels into the northern
Pilbara region and further east into the Northern Territory.
The economic analysis being run for the Rafael Project in late 2025/early 2026 was compelling. This analysis
indicated an integrated project assuming 100% equity funding (i.e. ungeared) and approximately 20-year life
generated average pre-tax operating cash flow of some A$103 million/year. Given the tax losses currently
accumulated in Buru this equates to circa average A$76 million/year after tax operating cash flow.
Slide: Engineering insights creates more value
In March 2026 it became evident that the liquids production from the planned small-scale liquefaction and
fractionation plant would be materially higher than previously assumed. Based on 200 tonnes/day2 LNG (in a 250 to
300 tonnes/day capacity plant) the condensate produced increased by 80% to 69 kilolitres/day. In addition, there is
production of some 15 tonnes/day of LPG which was previously not included as a product of the Rafael Project.
Slide: Rafael – a high value gas and liquids business
The additional liquids volumes have had a material positive impact on the value of Rafael. On the same price
assumptions as previous and including LPG at a significant discount to current Kimberley LPG prices, the average
annual pre-tax cash flow on a 100% equity basis increased by 2026A$33 million (i.e. 47%) to 2026A$103 million/year.
This cash flow and value increase on a 100% equity funding basis is material. This was a key input into the decisions
to defer the project schedule some 6 months and the equity raising in April 2026 to support the ongoing work.
As noted earlier, the arrangement with CEFA is for CEFA to build, own and operate the LNG and liquids plant and
Buru pay a tariff to CEFA. Taking this into account (i.e. paying CEFA the tariff) and based on the April 2026 production
forecast (at 200 tonnes/day LNG) the annual pre-tax cash flow for the upstream parties (i.e. the gas resource owner)
is some A$$84 million/year. The NPV10 is $560 million and internal rate of return 80% in this scenario. Hence, why
we refer to this as a transformational opportunity for Buru.
2
200 tonnes/day equates to 11 TJs/day gas production
It is important to note that the current Buru analysis is based on only the P903 gas and liquids resources. In all
likelihood, the volume of gas and liquids is much higher than this e.g. the P50 estimates are more than two times the
P90 estimates. On preliminary analysis Buru expects there will be more and new gas and liquid market opportunities
for the higher volumes.
Slide: Rafael - resource distribution
The Rafael 1 well was drilled in late 2021 and production tested in 2022. 3D seismic was then acquired in 2023. The
analysis of the results from this and other work underpins the current Contingent Resource estimates. The resource
estimates are based on developing the field after appraisal at the Rafael 2H location.
Work and independent technical review is now underway to assess what may be accessed from the Rafael 1 area
only i.e. the known discovered and previously tested resource (coloured mid blue on the slide). The preliminary
results from this work are very encouraging and possibly point to an economic project based on the Rafael 1 resource
alone. We will have more to say on this in the next few weeks.
Slide: Rafael Project timeline
The current Rafael Project schedule is outlined on this slide. Some key items to note:
• drilling and testing Rafael 2H and recompleting Rafael 1 is planned for the June 2027 Quarter;
• the reports and submissions required for the environmental approvals (including the Traditional Owner review
and community consultation) are being finalised for submission in the September 2026 Quarter with the
target to have an approval decision by the end of 2026;
• negotiations with the Traditional Owners are very constructive and progressing well;
• discussions with gas and liquids customers are underway;
• a Final Investment Decision is planned for mid-2027 and follows the drilling activity; with
• gas production planned to commence late 2028/early 2029.
The Buru team is supported by a range of consultants and technical specialists in these activities and the team is
currently very busy.
Slide: Funding and optionality
Buru is working with Carlingford (UK) on the funding to enable the planned Rafael activity and project delivery. This
work includes discussions with multiple international and Australian parties on a range of funding alternatives.
The impacts on the global and local energy markets from the Middle East conflicts and the increasing recognition of
the importance of energy supply security and the role of gas and oil (including condensates and LPGs) has coincided
with an increase in the level of interest in the Rafael Project. We are hopeful we will have a lot more to say on this in
the next few months.
The global and local energy security dynamics have also coincided with interest in some other Buru assets.
Slide: Ungani oilfield (100% Buru)
The Ungani oil field has been under care and maintenance since August 2023 when production had to be halted.
This was because the crude oil could not be transported to the Wyndham storage and loadout facility due to flooding
and road damage including the collapse of and the need to replace the Fitzroy River Bridge.
Options to restart Ungani production are being assessed. This includes the farmout and drilling of the Mars
exploration prospect which is only some 9 kms from Ungani.
3
P90 represent a 90% probability of exceedance.
Slide: Mars prospect (100% Buru)
The farmout and drilling of the Mars exploration prospect is a valuable near term opportunity for Buru. The exploration
well cost estimated to be approximately A$7 million is relatively low for what is a high value opportunity if successful.
Whilst our priority is the Rafael Gas Project development, in the current environment we are also advancing the Mars
exploration and the Ungani restart opportunities.
Slide: Yulleroo (100% Buru)
We have not forgotten our Yulleroo asset. Yulleroo is a significant unconventional gas and liquids rich field also held
100% by Buru in the Canning Basin.
We are keeping a close watch on developments within the Government of Western Australia regarding possible
arrangements to support and enable the development and production of a field such as Yulleroo.
Slide: Summary
To wrap up, recent work on our priority Rafael Gas Project has generated significant increased value from liquids (i.e.
condensate and LPGs) and the current review underway on the value of the Rafael 1 fault block could be very
interesting for shareholders.
Rafael has a number of very favourable and valuable competitive advantages which have clear merit given the current
global and local energy availability and security concerns.
Success with the Rafael project delivers material long term cash flow and value uplift for Buru within only a few years.
Your Board is focussed on optimising this for the benefit of Buru shareholders.
We are busy on work activity associated with securing the funding for the Rafael drilling and completion program,
Rafael Gas Project approvals and arrangements with the Traditional Owners to support a Rafael Final Investment
Decision in mid-2027.
Work is also being advanced to capture value from the other main assets in the Buru portfolio. Here I refer in particular
to the Ungani oilfield, the Mars exploration opportunity and the Yulleroo gas and liquids resource.
I look forward to keeping shareholders updated on our progress.
Thank you
Annual General Meeting
Presentation
High-value, long-term gas and liquids business in
the northwest of Western Australia with material
growth
27 May 2026
ASX:BRU
Example of a small-scale LNG facility at Mount Magnet, Western Australia.
Photo courtesy of Clean Energy Fuels Australia
Disclaimer
This presentation has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”) and has been authorised for the intended purpose by the Chair of Buru Energy Limited.
This presentation contains certain statements which may constitute "forward-looking statements". It is believed that the expectations reflected in these statements are reasonable but they may be affected
by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including, but not limited to: price fluctuations, actual demand, currency
fluctuations, drilling and production results, reserve and resource estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments,
economic and financial market conditions in various countries and regions, political risks, project delays or advancements, approvals and cost estimates. Buru’s operations and activities are subject to joint
venture, regulatory and other approvals and their timing and order may also be affected by weather, availability of equipment and materials and land access arrangements, including native title
arrangements. Although Buru believes that the expectations raised in this presentation are reasonable there can be no certainty that the events or operations described in this presentation will occur in the
timeframe or order presented or at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production, development expenditures, operating expenses and cash flows. Oil and gas reserve
engineering and resource assessment must be recognised as a subjective process of estimating subsurface accumulations of oil and gas that cannot be measured in an exact way. All contingent resources
and prospective resources presented in this report are pursuant to the Company’s ASX releases of 14 August 2025, 26 July 2024, 17 June 2024 and 18 January 2018 . The estimates of contingent and
prospective resources included in this Presentation have been prepared in accordance with the definitions and guidelines set forth in the SPE PRMS. Buru is not aware of any new information or data that
materially affects the information included in this presentation and all material assumptions and technical parameters underpinning the estimates in this presentation continue to apply and have not
materially changed. The probabilistic method was used to prepare the estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other person that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability
which cannot be excluded, each of Buru, its officers, employees and advisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in this presentation and
excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence if any information in this presentation or any error or omission
there from. Neither Buru nor any other person accepts any responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information
made available to a person nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
Rafael Gas Project
Unique position
Replaces a legacy, higher cost and
less reliable energy system in the
north of Western Australia
Current system relies on imports
from outside the region
1 Regional gas generators are fuelled by LNG delivered by road from Karratha.
This is costed at $22/GJ (Broome Clean Energy Study Feb 2023, Sustainable Energy Now)
Proximity to market
Delivered cost
Transport emissions
Regional development
New market opportunities
Synergy with renewables
Existing trucked /
imported gas and diesel
Rafael Gas
Project
615 - 1,520 km 70 – 685 km
Project Benefits
1
CO2
CO2
Rafael Contingent Resources – T20 primary reservoir
Interval only (Buru analysis, post Rafael 3D seismic survey, pre-inversion
analysis)
Gross 1C2 2C 3C
Gas Bscf 85 220 523
Condensate MMstb 1.8 4.5 10.6
Net 1C2 2C 3C
Gas Bscf 76 176 401
Condensate MMstb 1.6 3.6 8.1
2 High confidence resource volumes used to underpin Rafael Gas Project basis
1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures.Buru is not aware of any new
information or data that materially affects this assessmentand that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
Rafael 1 drilled on 2D seismic in 2021 encountered
significant gas columns in a large 4-way structural closure.
(1) Primary Reservoir Interval (robust base case):
Crestal T20 Ungani Dolomite (Contingent Resources)
Proven reservoir, produced in Ungani Oilfield
Flow tested in 2022 and produced at 7.6 MMscf/d
(2) Secondary Reservoir Interval (upside):
Upper T30 Laurel Dolomite (Prospective Resources)
Petrophysical evaluation indicates gas
Interval could not be tested in Rafael 1 due to operational difficulties
(3) Deeper Nullara target (upside):
Undrilled Flying Fox exploration target being worked (Prospective Resources)
Rafael - proven resource with material upside
- gas and liquids
Ungani Dolomite Depth Structure Map
Rafael 1 (2021)
Rafael 2 (Proposed)
Depth
(mTVDSS)
Rafael location delivers regional supply advantage
Horizon Power Service Area, Horizon Power Annual Report 2024
Existing gas fired power stations
Rafael
Horizon Power (WA government-owned entity) is responsible for
generating, procuring, distributing, and selling electricity in region.
Horizon Power is currently executing the West Kimberley Power
Project (WKPP) which is designed to solve the Kimberley's heavy and
expensive reliance on diesel for electricity with a new system expected
to deliver in the 2028 – 2030 window.
Annual power consumption of the five (5) main Kimberley demand
centres (Broome, Derby, Camballin/Looma, Fitzroy Crossing and Halls
Creek) is ~ 190 GWh1 excluding power consumption for mining use.
Current gas demand for retail power generation is 6TJ/d to 13TJ/d
(seasonal).
Plus more than 100 remote communities rely on diesel for primary
power generation.
Additional robust demand for power outside the immediate “capture
zone” by resource projects not on the gas pipeline network.
Existing and probable mine project demand estimated at >15TJ/d.
1 Published Horizon Power data
Rafael – the local competitive energy source
Engineering insights creates more value
The SMR process is the
workhorse of the LNG industry
used in many liquefaction
installations.
Process flow modelling confirms
uplift in condensate volumes and
a new, valuable LPG product
stream.
Rafael Gas Project worth more
today than previous estimates.
Rafael Gas Project : Generic Single Mixed Refrigerant (SMR) based Small Scale Process Scheme
New source of value.
not modelled in
previous project
economics
Increased source of
value based on process
flow modelling and not
reflected in previous
project economics
Robust value
reconfirmed from
process flow
modelling.
Feedstock for power
generation and third-
party minerals
processing
Previous April‘26 Increase Increase %
LNG (tonnes/day) 200 200 0 0
Condensate
(kilo litres/day)
38 69 +31 80%
LPG (tonnes/day) 0 15 +15 >100%
Rafael – a high value gas and liquids business
Project economics 1 based on Rafael 1C (P90) Resource with a maximum production rate of 200 tonnes per
day LNG, 69K litres per day condensate and 15 tonnes per day LPG for 20 years.
Based on “mid-case” scenario for LNG, Condensate and LPG sales price assumptions.
Economic analysis date April 2025 April 20262
Gas Sales Price A$/GJ (domestic)3 $15.00 $15.00
Liquids (condensate) sales price A$/litre (domestic) $1.50 $1.50
LPG sales price A$/tonne (domestic) N/A $900.00
Following in gross terms (A$), 2026$, pre-tax
Total gas revenue ($M) 1,800 1,810
Total condensate revenue ($M) 400 910
Total LPG revenue ($M) 0 120
Total Opex/Royalties ($M) (500) (790)
Average Pre-Tax Operating Cashflow/annum ($M) 70 103
Pre-tax NPV10 ($M) 400 590
IRR 44% 42%
1 The figures are before any financing inclusive of facilities and well capex and provisions for abex. NPV and IRR are pre-tax. Buru Energy has more than $200 million in tax losses which can be applied against future profits.
2 Updated 2026 basis of plant design includes a 3rd well in Year 8 & additional capex for condensate separation, stabilisation & storage. Assumes pre- production capex of $45M for 2027 wells and $145M for the LNG Plant (built, owned and operated by CEFA)
3 Regional gas fired power stations are fuelled by LNG currently delivered over long distances (615 – 1,520kms). This is costed at $22/GJ (Broome Clean Energy Study Feb 2023, Sustainable Energy Now)
4 CEFA own and operate LNG and liquids plant. Buru pays CEFA a tariff to process gas to LNG and liquids (condensate and LPGs)
Key insights
Significant value on conservative assumptions
Economics based on 200 tonnes per day LNG
with plant capacity up to c. 300 tonnes per day
Material uplift from 2025 economic analysis
due to increase in condensate and LPG
“Mid-case” price assumptions represents
- 47% increase in annual pre-tax
cashflow to A$103M
- 47% increase in NPV10 to A$590M
- IRR of 42%
CEFA owned and operated plant case4:
- annual pre-tax cashflow to A$84M
- increase in NPV10 to A$560M
- IRR of 80%
Rafael – resource distribution
Rafael 1 (2021)
Rafael 2 (Proposed)
Ungani Dolomite Depth Structure Map
Depth
(mTVDSS)
Rafael 1 Fault Block
Rafael 1 drilled in late 2021
Rafael 1 production tested in
2022
3D seismic acquired in 2023
Rafael 1 fault block only
analysis underway
- very encouraging preliminary
results
Maybe economic based on
Rafael 1 fault block only
Rafael Project timeline
Funding and optionality
The Rafael Gas Project is a vital asset for regional energy security. Buru and Carlingford (UK) are facilitating the funding options with
potential counterparties.
Several options being pursued in parallel
Status of
partner
engagement
Parties in the Data Room conducting technical and commercial due diligence.
Range of options available and being discussed.
Strong project
fundamentals +
further value
uplift
Proponents have cited attractive project economics and improving sentiment
on the role of hydrocarbons in the medium to long term as reasons for
interest.
Recent design-led project /value uplift creates new and more opportunities.
Process
ongoing
Discussions continue with local and international parties whose strategic
horizons remain aligned with project and value realisation timing.
Buru pro-active
Actively broadening engagement to include investors focused on energy
based on the updated project economics and value accretive assets.
Exploring alternative funding structures.
Increased condensate and LPG product streams creates
additional project value, which increases the options available
for funding and commercial agreements
Ungani oilfield (100% Buru)
Ungani under care and maintenance since
August 2023.
Produced ~2.3mmbbls of oil to date with
~220,000 bbls remaining1.
Oil was previously sold at a premium to Dated
Brent into the Southeast Asia market.
Success at nearfield exploration prospect (Mars
1) can underpin re-commencement of production
with robust economics
Currently seeking expressions of interest for the
drilling of the Mars 1 exploration well
1 Remaining oil estimate assessed on the basis of the prevailing oil price and the operating model when production was halted
Mars prospect (100% Buru)
Located 9km from the Ungani Production Facility (UPF),
Mars 1 discovery
would underpin the restart of oil production, and increase
commercialisation options on robust economic terms
40% Geological Chance of Success
Mars 1 exploration well planned maximum total vertical depth of
1,808 mTVDSS (success case)
Drill and complete cost ~A$7 million
Pipeline solution to Ungani could be laid in ~ 20 days at a cost of
A$2 million
Progressing discussions with third parties looking for opportunities to
participate in an oil business
1 Prospective Resources relate to the estimated quantities of petroleum that may
potentially be recovered by the application of a future development project(s)
and relate to undiscovered accumulations. These estimates have both an
associated risk of discovery and a risk of development. Further exploration,
appraisal and evaluation is required to determine the existence of a significant
quantity of potentially moveable hydrocarbons. Refer to Buru ASX Release 17
June 2024 for full definitions and disclosures. Buru is not aware of any new
information or data that materially affects this assessment and that all material
assumptions and technical parameters underpinning the estimates continue to
apply and have not materially changed.
Prospective Resources (mmbbls)1 Low Best High
Stock Tank Oil Initially in Place (STOIIP) 3.0 10.6 21.7
Ultimate Recovery of Oil (UR) 0.7 2.8 6.2
Yulleroo (100% Buru)
Depth Structure Map of the near top Lower Laurel Carbonates
Yulleroo 2 clean-up flow 2010
Prospective Resources Low Best High
Sales Gas (PJ) 124.6 302.8 611.0
Associated Liquids (MMbbls) 4.3 11.9 24.8
Yulleroo is defined by four wells - all intersecting thick gas saturated sections with
gas below closure mapped on 3D seismic and Yulleroo 4 deliberately drilled
outside closure
Potential conventional pay in Yulleroo 3
Yulleroo 2 in 2010 (3 zones) produced rates up to 1.8 mmcfd and high condensate
content
Independent review by RISC estimated Contingent and Prospective Resource
sales gas and associated liquids in the Yulleroo Field as at 1 December 2017 as
follows:
Contingent Resources 1C 2C 3C
Unlimited Recoverable Sales Gas (PJ) 321.4 714.0 1,627.0
Unlimited Recoverable Associated Liquids (MMbbls) 9.5 24.9 47.6
• RISC’s Contingent Resource and Prospective Resource assessment has been prepared using the probabilistic method and an evaluation date of 1 December 2017.
• Contingent Resources are quantities of petroleum estimates as of a given date to be potentially recoverable from known accumulations by application of development project(s) but which are not
currently considered to be commercially recoverable due to one or more contingencies. Contingent Resources are a class of discovered recoverable resources.
• Prospective Resources are estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) that relate to undiscovered accumulations. These
estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation is required to determine the existence of a significant quantity of potentially
moveable hydrocarbons.
• The full resource statement is set out in accordance with ASX Listing Rules in Buru’s ASX release of 18 January 2018. Buru Energy is not aware of any new information or data that materially affects the
information included in the 18 January 2018 release and all material assumptions and technical parameters underpinning the estimates in that release continue to apply and have not materially changed.
A significant unconventional gas and liquids rich accumulation on the western side of the Canning Basin
Summary
Prioritising Rafael Gas Project
- can be a game changer for Buru
- material long term cash within 2 to 3 years
- with valuable competitive advantages
Significant additional Rafael value identified from increased liquids production
- Rafael 1 fault block only resource is currently being analysed
Rafael funding and securing project approvals and commercial agreements are
the key near term targets
Advancing work to capture value from the other main assets
- Ungani and Mars – oil
- Yulleroo - gas
Thank you
27 May 2026
ASX:BRU