Investor Webinar Presentation
Released
Released
Announcement PDF
ASX Announcement
29 November 2023
Investor Webinar Presentation
Buru Energy Limited (Buru) (ASX: BRU) is pleased to provide its Investor Webinar
Presentation.
The presentation will be made by the Buru Chief Executive Officer Thomas Nador as part of
the Investor Webinar to be held on Wednesday 29 November at 9am AWST / 12noon
AEDT.
Authorisation
This ASX announcement has been authorised for release by the Chair of Buru Energy.
For further information, visit www.buruenergy.com or contact:
Thomas Nador, Chief Executive Officer
Telephone: +61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
1
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Investor Webinar
29 November 2023
9am AWST / 12 noon AEDT
Thomas Z Nador
CEO
Disclaimer
This material has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”)
and has been authorised for release to the ASX by the Non-Executive Chairman.
This presentation contains certain statements which may constitute "forward-looking
statements". It is believed that the expectations reflected in these statements are
reasonable but they may be affected by a variety of variables and changes in
underlying assumptions which could cause actual results or trends to differ materially,
including, but not limited to: price fluctuations, actual demand, currency fluctuations,
drilling and production results, reserve and resource estimates, loss of market,
industry competition, environmental risks, physical risks, legislative, fiscal and
regulatory developments, economic and financial market conditions in various
countries and regions, political risks, project delays or advancements, approvals and
cost estimates. All of Buru’s operations and activities are subject to joint venture,
regulatory and other approvals and their timing and order may also be affected by
weather, availability of equipment and materials and land access arrangements,
including native title arrangements. Although Buru believes that the expectations
raised in this presentation are reasonable there can be no certainty that the events or
operations described in this presentation will occur in the timeframe or order
presented or at all.
2
There are numerous uncertainties inherent in estimating reserves and resources, and
in projecting future production, development expenditures, operating expenses and
cash flows. Oil and gas reserve engineering and resource assessment must be
recognised as a subjective process of estimating subsurface accumulations of oil and
gas that cannot be measured in an exact way. All contingent resources and
prospective resources presented in this report are pursuant to the Company’s ASX
releases of 26 April 2022 and 23 January 2023, respectively. The estimates of
contingent and prospective resources included in this Presentation have been
prepared in accordance with the definitions and guidelines set forth in the SPE PRMS.
Buru is not aware of any new information or data that materially affects the
information included in this presentation and all material assumptions and technical
parameters underpinning the estimates in this presentation continue to apply and
have not materially changed. The probabilistic method was used to prepare the
estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other
person that the material contained in this presentation will be achieved or prove to be
correct. Except for statutory liability which cannot be excluded, each of Buru, its
officers, employees and advisers expressly disclaims any responsibility for the accuracy
or completeness of the material contained in this presentation and excludes all
liability whatsoever (including in negligence) for any loss or damage which may be
suffered by any person as a consequence if any information in this presentation or any
error or omission there from. Neither Buru nor any other person accepts any
responsibility to update any person regarding any inaccuracy, omission or change in
information in this presentation or any other information made available to a person
nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
Investor Webinar | 29 November 2023
BURU ENERGY OVERVIEW
Committed to delivering material growth as an integrated energy business
Who we are
Founded in 2008, we are an ASX listed diversified energy company focused on exploration and production
of hydrocarbon and alternative energy resources in Australia.
Buru has been the most active onshore oil and gas WA explorer since its formation and is the only E&P
company in the Canning Basin with contemporary production history.
Key Stats
Shares on issue ~639 million
Market Cap ~$80 million
Share Price $0.125
Cash at 31 Oct‘23 ~$13 million, with no debt
excluding proceeds of Share Placement and SPP
No material work program commitments
3
What we do
We explore for and develop hydrocarbon resources in the onshore Canning Basin of
Western Australia whilst participating in the new energy economy through our subsidiary
companies: GeoVault (Carbon Capture and Storage (CCS)), 2H Resources (natural
hydrogen and helium exploration), and Battmin (battery minerals exploration).
Our goal
Deliver material benefits to our shareholders, the Traditional Owners, the Government,
and communities of the areas where we operate.
Investor Webinar | 29 November 2023
OUR STRATEGY
Balancing short-medium term returns from hydrocarbon focused business with longer term new energy businesses
Find
Enable
Develop
Evolve
Pursue
energy resources
safely and
competitively
opportunities through
the right partners and
funding structures
with a material
interest in producing
assets
complementary
integrated energy
businesses
other compatible
growth opportunities
Exploit dominant position
in Canning Basin and
prove up hydrocarbon
reserves.
Create synergistic
partnerships to share
costs, risks, resources and
knowledge to progress
exploration, resource
maturation and
development.
Bring resource
developments to
production, building
financial strength and
balance sheet for further
growth.
Position business to be
part of the emerging
energy economy.
Seek adjacencies for organic
growth that leverage Buru
expertise.
Continue to build 2H
Resources - a natural
hydrogen and helium
focussed exploration and
development company.
Continue to assess valueaccretive inorganic growth.
Apply resource
exploration and
development expertise to
target integrated energy
opportunities.
Secure strategic funding
partners for appraisal and
development.
Maintain a material
participating interest in the
cashflow generating
assets.
Continue to build
GeoVault – a Carbon
Capture and Storage (CCS)
company to support own
developments, and thirdparty emissions reduction.
Support early-stage
exploration and discovery
of minerals needed for
energy transition.
4
Investor Webinar | 29 November 2023
OUR ASSETS - ONSHORE CANNING BASIN, WA
Strategic located and operated acreage position for hydrocarbon exploration and development
Area
~22,000 km2
Granted Permits
12 (7 EPs, 5 PLs)
Equity
100% (EP457 with 60%)
Discoveries
Yulleroo (2011), Ungani (2012), Rafael (2021)
Strategy
Largest
value
lever
Establish an energy hub in the Northwest of WA as part
of the conventional Rafael gas development.
Appraise, develop and commercialise the Rafael 1 gas
and condensate discovery via a two phased project.
Yulleroo
Progress prospect and lead maturation and
exploration drilling to provide backfill and growth.
Leverage Carbon Capture and Storage potential in the
basin to support Rafael and third party generated
emissions reduction.
Extract maximum value from late life Ungani asset.
Buru’s Canning Basin operated acreage
Unlock the value of the unconventional Yulleroo
resource.
5
Investor Webinar | 29 November 2023
OUR ASSETS - 2H RESOURCES OPERATING AREAS
Early mover in energy transition and energy expansion
2H Resources in SA
Area
~30,000 km2 (SA); ~35,000 km2 (WA)
Pending Permits (SA) 7 PELAs & 2 GSELAs
Applications (WA)
6 SPA-AOs
Equity
100% for PELAs; 75%-100% for SPA-AOs
Strategy
Natural hydrogen and helium exploration and
development.
Establish acreage positions in geologically
prospective areas.
Further develop exploration techniques to
effectively and efficiently explore for naturally
occurring hydrogen and helium.
Work with infrastructure providers for development
and commercialisation strategies.
2H Resources in WA
6
Investor Webinar | 29 November 2023
THE BURU INVESTMENT THESIS
Complementary asset and value streams focused on shareholder returns
7
1
Dominant position in underexplored onshore Canning Basin with a significant portfolio of
exploration and development opportunities.
2
100% owner and operator of the Rafael discovery – a high quality, liquids rich conventional
gas discovery with multiple commercialisation pathways.
3
Leveraging corporate capability, an early mover in natural hydrogen and helium exploration in
South Australia and Western Australia and carbon capture and storage (CCS) in Western
Australia.
4
100% owner and operator of the late life Ungani Oilfield which has produced >2 million barrels
of oil since 2015, with flexibility and autonomy to extract maximum value from the asset.
5
Experienced Board and Management Team to drive growth agenda across hydrocarbon
and new energy expansion/transition businesses to deliver value.
Investor Webinar | 29 November 2023
KEY FOCUS – COMMERCIALISING THE RAFAEL CONVENTIONAL WET GAS DISCOVERY
Uniquely placed in an emerging onshore energy basin where upstream is co-located with CCS and renewables
Established significant
gas and condensate
resource potential 1
Abundant solar
resources to
complement development
Close proximity to SE
Asian markets
Co-located
Carbon Capture
and Storage (CCS) for own-,
and third-party emissions
1 Rafael Resource independently assessed by ERCE to hold between 59 bcf and over 1 TCF of gas and up to 20.5 MMstb of
condensate (probabilistic).
Refer to the ASX release of 26 April 2022 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this
assessment and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
8
Investor Webinar | 29 November 2023
Shortlist
Development
Complete Partners
3
RAFAEL COMMERCIALISATION GAINING TRACTION
2
Appointed
Miro Capital
for next
stage of
Partner
Completed Selection
3D
process
Seismic
Survey
acquisition
Objectives for 2023
Create and maintain value ahead of Development Partner
selection
Drive certainty of outcome for development by managing
risks and reducing subsurface and development
uncertainty
Set up development for value realisation stage
1
Confirmed
phased
development
strategy
Commenced
Rafael
development
studies
9
Acquired
Origin’s
interests
Completed
FLNG
study for
‘high’
resource
outcome
Appointed
GHD for
pre-FEED
engineering
(Rafael
Phase 1)
Placed
3D
long lead Seismic
items
interp.
orders to
protect
2024
appraisal
WA Govt.
exempts
Canning
Basin from
onshore
gas export
ban
$5m deal
with MRL for
Received
Carnarvon
Government
assets
approval for
Rafael
DoL#
- Achieved
- Near Term Objectives
#Declaration of
Location
Investor Webinar | 29 November 2023
1
RAFAEL FIELD APPRAISAL PROGRAM
Rafael 1 Test
• Flow testing of limited zone demonstrated excellent quality gas with less than 2% inerts (CO2)
and rich condensate with no pressure depletion or reservoir boundaries observed.
Rafael 3D seismic survey acquisition completed
• Will provide confirmation of the size of the structure and improve understanding of the
trapping mechanism and potential column height.
• Processing deliverables:
- Fast track interpretation – late Nov’23
- Final processing – end Feb’24
Completed - Well test
with flow from
restricted zones
3D seismic
Commercialisation
options
• 3D seismic is essential for optimal placement of the wells to reduce geological and drilling risk.
Up to 2 Appraisal wells
• In planning phase for 2024 drilling to address the main subsurface uncertainties (hydrocarbon
column height and net/gross distribution).
Resource re-evaluation
Commercialisation preFEED
• Long Lead Item procurement commenced to safeguard drilling in 2024.
Rafael 1 recompletion and test
• 2022 flow test restricted to part of one zone because of well configuration.
• Test two additional zones and retest initial zone with confidence of increased flow rates.
• Test program planned to include perforation of additional intervals currently behind casing
where gas flows were encountered while drilling, and the Prospective Resource zone in the
Upper Laurel with interpreted rich gas condensate or volatile oil pay.
10
Appraisal drilling
Rafael 1 workover Test
all zones open
Resource confirmation
Commercialisation
FEED
Investor Webinar | 29 November 2023
1
PHASED EXECUTION STRATEGY MITIGATES SUBSURFACE UNCERTAINTY
Deliver early cashflows on known resource, and significant upside on appraisal success
Staged Development
Indicative Development Schedule
Independently certified resource potential1
provided basis for Concept Select
commercialisation options at various
resource levels.
Independent project definition studies
completed define a staged development
pathway.
Phase 1 development (underpinned by 1C
resource volume) for local gas and power
supply provides major emissions reduction
for local supply chain.
Internal Buru 2C deterministic resource
provides basis for clean ammonia or other
clean energy export project via proximal
coastal route.
3C resource supportive of export LNG project.
CCS studies confirm local CO2 storage
exceeds requirements of Rafael
development
Timeline is indicative and is subject to capital availability, future discussions with potential asset partners, offtake
arrangements , land access and regulatory approvals.
11
1 Rafael Resource independently assessed by ERCE to hold between 59 bcf and over 1 TCF of gas and up to 20.5 MMstb of condensate (probabilistic). Refer to the ASX release of 26 April 2022 for full definitions and
disclosures. Buru is not aware of any new information or data that materially affects this assessment and that all material assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed.
Investor Webinar | 29 November 2023
2
RAFAEL PARTNER SELECTION PROCESS IN PROGRESS
Formally soliciting interest for a discovered gas resource with a clear pathway to a clean energy development at scale enabled
by material Carbon Capture and Storage (“CCS”) potential
1
Rafael Gas Discovery
Commercialisation
2
Pathway
Development concept studies have been completed for full range of Rafael contingent resources
Phase 1 development for local gas and power supply for early cashflow, with Phase 2 export
development of either clean ammonia or CNG/LNG
Clean Energy
3
Province
Pathways to commercialisation supported by local large scale CO2 storage projects (CCS) facilitated
by Buru’s GeoVault subsidiary
The identified CCS potential of Buru’s Canning Basin permits together with Rafael gas has the
potential to create a new world scale CCS and clean energy province
4
Resource Potential
Proven Project
5
Delivery
12
Rafael gas-condensate field has been independently assessed with up to 1 Tcf gas and 20 MMbbl
condensate recoverable1
Location Declared in EP 428 (precursor to Production Licence), June 2023
Rafael appraisal program ongoing, with 3D seismic survey acquisition recently completed, and
further drilling and well testing planned for second half 2024
Buru’s permits include extensive prospective exploration acreage across the Canning Basin’s proven
and producing petroleum system
Mapped prospects and leads provide potential backfill for Rafael with unrisked mean Prospective
Resources of > 2.0 Tcf
Buru has a strong track record with native title holders and has commenced negotiations to secure
indigenous land use agreements for a Rafael development
Attractive opportunities for strategic partnerships
1 Rafael Resource independently assessed by ERCE to hold between 59 bcf and over 1 TCF of gas and up to 20.5 MMstb of condensate (probabilistic). Refer to the ASX release of 26 April 2022 for full definitions and
disclosures. Buru is not aware of any new information or data that materially affects this assessment and that all material assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed.
Investor Webinar | 29 November 2023
2
RESOURCE UPSIDE A KEY ELEMENT OF SECURING A STRATEGIC PARTNER
Buru’s acreage offers significant exploration potential
Exploration to support Rafael backfill
across diverse and proven conventional
plays
New prospects and play insights from 2021 seismic
and drilling campaign
Play diversity that includes the proven Ungani
Dolomite Play, clastic plays and emerging salt plays
with proven petroleum systems
Staircase of sizable prospects and leads within tieback distance to Rafael (~2 tcf unrisked)
13
Investor Webinar | 29 November 2023
3
RAFAEL ULTRA FAST TRACK COMPARISON WITH VINTAGE 2D
Significant data quality uplift and well tie anticipated to allow confident interpretation of reservoir and seal packages
Rafael 1
SSW
NNE
NNE
SSW
2.5 km
2.5 km
BEFORE - 2013 (2D)
14
Rafael 1
AFTER - Ultra Fast Track (3D)
Investor Webinar | 29 November 2023
SIGNIFICANT VALUE UPSIDE EXPOSURE VIA NEW ENERGY BUSINESS
Unparalleled understanding of greenhouse gas (GHG) storage potential in
the Canning Basin.
Aims to support Rafael development and third-party CO2 emitters by
making available suitable storage formations to reduce greenhouse gas
emissions as part of the transition to a lower carbon future.
Recently completed an independently validated GHG storage potential
assessment for Buru’s petroleum permit and licence areas confirming
storage capacity exceeds estimated Scope 1 and Scope 2 emissions from
the proposed Rafael development.
In addition, GHG storage capacity will be made available to companies
seeking to reduce their GHG emissions as part of the transition to a lower
carbon future.
CCS methodology
15
Actively developing the geological expertise to ensure 2H Resources can be at
the forefront of the exploration and production of natural hydrogen and
helium.
Developing expertise in identifying hydrogen accumulations by their surface
expressions through its own exploration programs and in co-operation with
CSIRO.
Independent Hydrogen Prospective Resource assessment for 2H Resources’
seven South Australian permit application areas confirms significant potential
and business case to pursue exploration and development.
Recent applicant for 6 SPA-AOs in Western Australia prospective for Helium
and associated gases.
Plan to make entity independently investible in the future for the benefit of
Buru shareholders.
2H Resources in SA
2H Resources in WA
Investor Webinar | 29 November 2023
SUMMARY INVESTMENT DRIVERS
16
1
Buru continues to deliver on its strategy to realise significant value from its Rafael discovery through
focus on rigorous execution and capital management.
2
3D seismic acquisition completed on time and on budget with early insights available in late
November 2023. Appraisal well planning is progressing, with Long Lead commitments placed to
maintain schedule.
3
Development studies completed and confirmed technical, commercial, and economic feasibility for
a wide range of resource outcomes. Buru is executing a phased development to deliver early
cashflows, and now focused on Native Title negotiations, concept studies and appraisal activities.
4
Rafael Development Partner Selection process underway. This is aimed at attracting a range of potential
partners focused on ‘advantaged’ development pathways, with co-located gas, condensate, hub scale CCS
and renewables.
5
An early investor in natural hydrogen and helium exploration which provides significant value
upside for investors at headstock level, until 2H Resources subsidiary becomes independently
investible in due course.
6
Proceeds of recent Share Placement and current SPP used to deliver the plan and to place Buru in
the best possible financial health to attract the most value accretive deals over the coming 6 months.
Investor Webinar | 29 November 2023
Q&A
17
Investor Webinar | 29 November 2023
Buru Energy Limited
Level 2, 16 Ord Street
West Perth Western Australia 6005
PO Box 1903
West Perth WA 6872
Phone: 1800 337 330
Email: info@buruenergy.com
Share your feedback
Discover