Buru Energy Limited (Buru Energy) provides the following weekly update on drilling operations at the Olympic 1 well as
at 06:00hrs, 11 June 2015 (AWST).
Since the last progress report the well has been drilled ahead in 6-1/8” (156mm) hole to 1,125 metres. Open-hole
wireline logs have been acquired and 5” (127mm) casing has been run and cemented to 1,123 metres. Wireline log
interpretation confirmed that there were no significant hydrocarbons in the Willara Formation objectives.
The forward operation is to core ahead in 3-4/5” (96mm) hole through the secondary objective Nambeet Formation to
the planned total depth of ~1,450 metres.
Olympic 1 is the second well to be drilled as part of the Apache Onshore Holdings Pty Ltd (Apache) farm out
announced in November 2013. The cost of the well will be fully funded by Apache under the terms of the farmout which
includes a commitment by Apache to fund a $25 million exploration program on EP 390, 438, 471 and 473.
The Olympic 1 well is located in exploration permit EP 473 and the drilling of the well will satisfy the Year 4 work
commitment on that permit. Buru Energy and Mitsubishi Corporation (Mitsubishi) both have a 25% equity interest in the
well and in EP 473 with Apache having the remaining 50% equity interest. The well is located approximately 60
kilometres to the southeast of Broome and some 22 kilometres inland from the Great Northern Highway.
Visit www.buruenergy.com for information on Buru Energy’s current and future activities.
For inquiries please contact Buru Energy:
Telephone:
+61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
1
ASX Release
About Buru Energy
Buru Energy Limited (ASX: BRU, S&P/ASX300) is a Western Australian oil and gas exploration and production
company headquartered in Perth with an operational office in Broome. The Company’s petroleum assets and
tenements are located onshore in the Canning Basin in the southwest Kimberley region of Western Australia. Its
flagship high quality conventional Ungani oil field project is owned in 50/50 joint venture with Mitsubishi Corporation. As
well as Ungani, the Company’s portfolio includes potentially world class tight gas resources. The company’s goal is to
deliver material benefits to its shareholders, the State of Western Australia, the Traditional Owners of the areas in which
it operates, and the Kimberley community, by successfully exploring for and developing the petroleum resources of the
Canning Basin in an environmentally and culturally sensitive manner.
Competent Persons Statement
Information in this release related to exploration and production results and petroleum resources is based on
information compiled by Eric Streitberg who is an employee of Buru Energy Limited. Mr Streitberg is a Fellow of the
Australian Institute of Mining and Metallurgy and the Australian Institute of Company Directors, and a member and
Certified Petroleum Geologist of the American Association of Petroleum Geologists. He has over 40 years of relevant
experience. Mr Streitberg consents to the inclusion of the information in this document.
2
ASX Release
Olympic 1 Weekly Drilling Report
PERMIT
The Olympic 1 well is located in exploration permit EP 473 some 60
kilometres to the southeast of Broome and some 22 kilometres inland from
the Great Northern Highway. A location map for the well is set out below.
WELL LOCATION
Latitude:
Longitude:
BURU ENERGY’S INTEREST
Buru Energy Limited holds a 25% interest in the well
DATE OF PROGRESS REPORT
06:00 hours, 11 June 2015 (AWST)
PROPOSED TOTAL DEPTH
~1,450 metres
CURRENT DEPTH
1,128 metres
PROGNOSED TIME TO COMPLETION
30 days
SPUD DATE
22 May 2015
DAYS SINCE SPUD
20
CURRENT TARGET FORMATION
Nambeet Formation sandstones.
OPERATIONS SINCE LAST
PROGRESS REPORT
Since the last progress report the well has been drilled ahead in 6-1/8”
(156mm) hole to 1,125 metres. Open-hole wireline logs have been acquired
and 5” (127mm) casing has been run and cemented to 1,123 metres.
HYDROCARBON INDICATIONS
Wireline log interpretation confirmed that there were no significant
hydrocarbons in the Willara Formation objectives.
FORWARD OPERATIONS
The forward operation is to core ahead in 3-4/5” (96mm) hole through the
secondary objective Nambeet Formation to the planned total depth of
~1,450 metres.
180 17’ 57.6” S
1220 38’ 23.4” E
Location Map for Olympic 1
Easting:
Northing:
DDH1 Rig 31
3
461,935m
7,976,660m