Corporate Presentation
Released
Released
Announcement PDF
Rafael Gas Project
Fuelling the Future:
17 April 2026
ASX:BRU
Example of a small-scale LNG facility at Mount Magnet, Western Australia.
Photo courtesy of Clean Energy Fuels Australia (CEFA)
Compelling Project Economics + Energy Security for
Northwest of Western Australia
Disclaimer
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”) and has been authorised for the intended purpose by the Non-Executive Chair of Buru Energy Limited.
This presentation contains certain statements which may constitute "forward-looking statements". It is believed that the expectations reflected in these statements are reasonable but they may be affected
by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including, but not limited to: price fluctuations, actual demand, currency
fluctuations, drilling and production results, reserve and resource estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments,
economic and financial market conditions in various countries and regions, political risks, project delays or advancements, approvals and cost estimates. All of Buru’s operations and activities are subject to
joint venture, regulatory and other approvals and their timing and order may also be affected by weather, availability of equipment and materials and land access arrangements, including native title
arrangements. Although Buru believes that the expectations raised in this presentation are reasonable there can be no certainty that the events or operations described in this presentation will occur in the
timeframe or order presented or at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production, development expenditures, operating expenses and cash flows. Oil and gas reserve
engineering and resource assessment must be recognised as a subjective process of estimating subsurface accumulations of oil and gas that cannot be measured in an exact way. All contingent resources
and prospective resources presented in this report are pursuant to the Company’s ASX releases of 14 August 2025, 26 July 2024, 17 June 2024 and 18 January 2018 . The estimates of contingent and
prospective resources included in this Presentation have been prepared in accordance with the definitions and guidelines set forth in the SPE PRMS. Buru is not aware of any new information or data that
materially affects the information included in this presentation and all material assumptions and technical parameters underpinning the estimates in this presentation continue to apply and have not
materially changed. The probabilistic method was used to prepare the estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other person that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability
which cannot be excluded, each of Buru, its officers, employees and advisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in this presentation and
excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence if any information in this presentation or any error or omission
there from. Neither Buru nor any other person accepts any responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information
made available to a person nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
Rafael Gas Project highlights
2
Buru Energy Corporate Presentation – April 2026
Rafael Gas Project
• Large, high-confidence resource supporting long-life, scalable development - based on high confidence (P90) resource volume of ~85 Bscf of gas and 1.8
MMstb of liquids, supporting a ~20-year production profile, with LNG, condensate and LPG production providing diversified revenue streams. 2C best estimate (220
Bscf) or the 3C resource case (523 Bscf)1 adds material upside.
• Capital-efficient, modular development with strong economics - small footprint based on a 250 - 300 tpd modular LNG plant with no pipeline requirement
reduces upfront capex and execution risk
• Strategic location delivering a clear regional supply advantage - uniquely positioned in the Kimberley to supply reliable, locally sourced energy into a structurally
undersupplied region, displacing high-cost diesel and imported LNG while supporting both existing and new industrial demand
Significant valuation uplift
unlocks additional
opportunities
• Material uplift in potential value from 2025 economic screening due to expected increase in condensate production and new LPG product stream.
• Potential total project value on a “mid-case” has increased more than 45% to over A$500 million.
• Enhanced economics and product mix provides increased flexibility for funding, offtake, pricing and project commercial structuring
De-risked development
pathway with strategic partner
• De-risked funding through strategic partnership - CEFA to fund ~80% of Project capex (~A$150 million), materially reducing Buru’s capital requirements, which
are limited to resource validation and upstream operations
• CEFA (downstream operator) - to finance, build, own and operate LNG facility and distribute product to market
• Buru (upstream operator) - to drill a low-risk well to support Reserves Certification and flow-assurance and convert Rafael 1 to production well
Equity raising to fund near-
term workstreams & optimise
development pathway
• Successful A$5.3 million equity raising (before costs) at A$0.015 per share to fund pre-FID activities (including facility design, approvals and resource progression)
• Equity raise enables the recent valuation uplift to be factored into Project design and development pathway and funding to be optimised ahead of FID (targeted mid-
2027) and first production (late 2028/early 2029)
1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this assessment and that all
material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
Significant uplift in the estimated value of the Rafael Gas Project unlocks additional funding and commercial opportunities
Company snapshot
Focused on the development and
commercialisation of the Rafael Gas
Project, based on Buru’s wholly
owned and operated conventional gas
and condensate discovery in the
Canning Basin of Western Australia.
Rafael Gas Project expected to deliver
material and enduring cashflows from
2028/early 2029 and create long term
value and growth opportunities for
Buru shareholders and stakeholders.
Where We Operate
3
Board of Directors
Ms Joanne Williams
Currently Independent NED
(Executive Director from 8 May 2026)
Mr Malcolm King
Independent Non-Executive Director
Mr David Maxwell
Currently Independent Non-Executive Chair
(Executive Chair from 8 May 2026)
Buru Energy Corporate Presentation – April 2026
Capital Structure1
Shares on issue million 1,003
Market Capitalisation1 A$ million 23.0
Cash2 A$ million 1.8
Debt A$ million nil
12-month high cents/share 4.1
12-month low cents/share 1.7
Shareholders by Type3 Research
1 as at 31 March 2026
2 as at 31 March 2026 excluding equity raising proceeds.
3 as at 31 December 2025.
88.6%
9.86%
0.8% 0.8%
Retail & HNW
Domestic
Institutions
Foreign
Institutions
Directors &
Employees
Simple project design and low-risk execution
Project is based on high confidence 1C Resource of 85 Bscf
2C best estimate (220 Bscf) or the 3C resource case (523 Bscf)1
adds material upside
Small footprint (based around the existing cleared Rafael 1
discovery well pad – enabling simple and fast approvals )
No pipeline (trucked LNG, condensate and LPG)
Proven design, modularised construction
Many global small scale LNG plants in operation, with several
in Australia (and WA)
Production of up to 300t of LNG with associated condensate and
LPG
Current plan based on 2 wells (including the recompletion of the
Rafael 1 discovery well as a production well)
Approx 20-year production life with robust cashflow
Significant upside with greater resource and market growth
Indicative well locations for
Rafael 1 (existing discovery well)
and Rafael 2H (previously B)
(planned new well for drilling in
2027) 1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures.Buru is not aware of any new information or data
that materially affects this assessment and that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed.
Buru Energy Corporate Presentation – April 2026
4
Robust economics with significant increase in value
Buru Energy Corporate Presentation – April 2026
Economic Screening 1 based on Rafael 1C Resource with initial 12-month production ramp up, and maximum
production rates of 200 tpd LNG, 69 kLpd condensate and 15tpd LPG for 20 years. Based on 100% Project Economics
and “mid-case” LNG, condensate and LPG sales price assumptions.
Economic screening date 2025 2026 2026
Financial structure Capex Model2 Capex Model2 Opex Model3
Gas Sales Price A$/GJ (domestic)4 $15.00 $15.00 $15.00
Liquids (condensate) Sales Price A$/litre (domestic) $1.50 $1.50 $1.50
LPG Sales Price A$/tonne (domestic) N/A $900.00 $900.00
Following in gross terms (A$), 2026$, pre-tax
Total gas revenue ($M) 1,800 1,810 1,810
Total condensate revenue ($M) 400 910 910
Total LPG revenue ($M) 0 120 120
Total Opex/Royalties ($M) (500) (790) (1,160)
Average Pre-Tax Operating Cashflow/annum ($M) 70 103 84
NPV10 ($M) 400 590 560
IRR 44% 42% 80%
1 Equity economics, ungeared in 2026-dollars. Basis of plant design for the 2026 cases include a 3rd well in Year 8 and additional capex for condensate separation, stabilisation and storage. Additional capex more than offset by higher returns from additional
condensate and new LPG product stream. The figures are before any financing costs and inclusive of facilities and well capex and provisions for abex. NPV and IRR are pre-tax. Buru Energy has more than $200 million in tax losses which can be applied
against future profits. $M = 2026$ million. 2 Capex model – Buru to finance entire project development, vs pay a recurring service fee (tariff) to a third party. 3 Opex model assumes third party capex plant investment recovered through a tariff. 4 Regional gas
fired power stations are fuelled by LNG delivered over long distances (615 – 1,520kms). This is costed at $22/GJ (Broome Clean Energy Study Feb 2023, Sustainable Energy Now)
5
Key insights
Economic screening demonstrates significant
value. Note this is based on 200 tpd LNG with
plant capacity up to 250-300 tpd
Material uplift from 2025 screening due to
expected increase in condensate production
and new LPG product stream
“Mid-case”, represents a 20 - 47% increase in
annual pre-tax cashflow (depending on
capex/no tariff vs opex/tariff model)
Internal Rate of Return range is 42 – 80%
depending on commercial model
Rafael Contingent Resources1 – T20 primary reservoir
interval only (Buru analysis, post Rafael 3D seismic survey, pre-inversion
analysis)
Gross 1C2 2C 3C
Gas Bscf 85 220 523
Condensate MMstb 1.8 4.5 10.6
Net 1C2 2C 3C
Gas Bscf 76 176 401
Condensate MMstb 1.6 3.6 8.1
2 High confidence resource volumes used to underpin Rafael Gas Project basis
1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures.Buru is not aware of any new
information or data that materially affects this assessmentand that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
Rafael 1 drilled on 2D seismic in 2021 encountered
significant gas columns in a large 4-way structural closure.
(1) Primary Reservoir Interval (robust base case):
• Crestal T20 Ungani Dolomite (Contingent Resources)
• Proven reservoir, produced in Ungani Oilfield
• Flow tested in 2022 and produced at 7.6 MMscf/d
(2) Secondary Reservoir Interval (upside):
• Upper T30 Laurel Dolomite (Prospective Resources)
• Petrophysical evaluation indicates gas
• Interval closed off and was not tested in 2022 due to operational difficulties
(3) Deeper Nullara target (upside):
• New Flying Fox exploration target being worked (Prospective Resources)
6
Rafael - a proven resource
Rafael 1
Drilled
W E
Depth
(mSS)
Carbonate
Indicator
Ungani Dolomite T20
Upper Laurel Dolomite T30
T20 Ungani Dolomite
TESTED INTERVAL
T30 Upper Laurel Dolomite
UNTESTED ZONE
Rafael Web-AVO Inversion – K Bulk Modulus, Carbonate Indicator
Rafael 2H
planned
for early
2027
Deeper Nullara Carbonate
Buru Energy Corporate Presentation – April 2026
Flying Fox Prospective Resources1 (Buru analysis, post Rafael 3D seismic survey)
1 Prospective Resources relate to the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to
undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development.Further exploration appraisal and evaluation is required to
determine the existence of a significantquantity of potentially moveable hydrocarbons.
Please refer to ASX Release of 14 August 2025 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this assessmentand
that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
Flying Fox – A prospect beneath Rafael
Prospect: Devonian carbonate target, imaged on recently acquired Rafael 3D,
immediately beneath the Rafael 1 discovery, within a faulted closure of 26 km2 and
~370m vertical relief
Opportunity: upside Prospective Resource for the Rafael development
Could be tested by incremental deepening of proposed Rafael 2H well by ~ 500m
Primary Target: gas reservoired in dolomitized, vuggy, reef facies of the Nullara or
Pillara Fm (Devonian) and sealed by shales of the May River Formation
Chance Of Success: 45%
Key risks and uncertainties:
• Reservoir quality – effectiveness risk for the dolomitized Devonian carbonate
• Fault seal – risk to leak into overlying T20 Ungani Dolomite
7
Significant potential for further resource upside
Chance of
Success
Condensate (MMstb) Gas (Bscf)
(COS %) 1U 2U 3U 1U 2U 3U
Gross Prospective Resources 45 1.2 5.0 12.6 60 247 614
Net Prospective Resources 45 1.1 4.6 11.3 57 226 551
A’
A
Rafael 1
Proposed
Rafael B
Buru Energy Corporate Presentation – April 2026
2026 design-led insights create more value
8
• The SMR process is the
workhorse of the LNG industry
used in many liquefaction
installations.
• Process flow modelling confirms
uplift in condensate volumes and
a new, valuable LPG product
stream.
• Rafael Gas Project worth more
today than previous estimates.
• Buru working to ensure:
- final funding structure
reflects the increased
value; and
- shareholders benefit from
higher value.
Rafael Gas Project : Generic Single Mixed Refrigerant (SMR) based Small Scale Process Scheme
New source of value.
not modelled in
previous project
economics
Increased source of
value based on process
flow modelling and not
reflected in previous
project economics
Robust value
reconfirmed from
process flow
modelling.
Feedstock for power
generation and third-
party minerals
processing
Buru Energy Corporate Presentation – April 2026
The Kimberley needs the Rafael Gas Project
9
Region is isolated
No "Safety Net": the Kimberley is not connected to pipelines - every town is essentially an "energy island.“
Single-Point Failure: many remote communities rely on a single power station; if the fuel supply to that one
site is cut, the entire community loses power.
… relies on a
"Long-Tail" supply
chain
Tyre-and-Tarmac Pipeline: most of the region’s power is generated by imported Diesel or LNG (Liquefied
Natural Gas) that must be trucked 615 – 1,520 kilometers from Karratha
Maritime Dependence: port facilities in Broome and Wyndham are critical for fuel shipments, making the
region vulnerable to port closures, industrial action, and shipping delays.
Just-in-Time Vulnerability: low local storage capacity means the region relies on frequent, scheduled
deliveries; a delay of even a few days can trigger an energy emergency.
… has
environmental and
seasonal
chokepoints
"Wet Season" Threat: heavy flooding (common on the Great Northern Highway) often severs road links,
physically cutting off the "fuel pipeline" for weeks at a time.
Extreme Heat Derating: high ambient temperatures (often exceeding 40°C) impacts efficiency of
transportation of LNG over long distances.
… and delivered
energy comes at a
high cost.
“Distance Tax” : fuel costs in the Kimberley include a significant "logistics markup." Trucking LNG or Diesel
over large distances adds a significant per-litre overhead that regions with pipelines (like the Pilbara or
Perth) don't face.
Economic Vulnerability: in WA, the "Uniform Tariff Policy" means Kimberley residents effectively pay the
same for electricity as people in Perth. However, the actual cost to generate the electricity can be 3 to 5
times higher than the retail price and the taxpayer picks up the tab for the difference.
WESTERN AUSTRALIA
Buru Energy Corporate Update – April 2026
Rafael - the ideal partner to provide firming energy for renewables in the Kimberley
Rafael - numerous benefits and no regional competition
10
Uniquely positioned to replace a
legacy, costly and insecure
energy system in the north of
Western Australia that currently
relies on imports from outside the
region
1 Regional gas generators are fuelled by LNG delivered by road from Karratha.
This is costed at $22/GJ (Broome Clean Energy Study Feb 2023, Sustainable Energy Now)
Existing trucked / imported
gas and diesel
Rafael Gas
Project
615 - 1,520 km 70 – 685 km
CO2
CO2
Project Benefits
1
Proximity to market
Delivered cost
Transport emissions
Regional development
New market opportunities
Synergy with renewables
Capture Zone
Buru Energy Corporate Presentation – April 2026
Kimberley and regional energy market is growing
11
Horizon Power Service Area, Horizon Power Annual Report 2024
Existing gas fired power stations
Rafael
Horizon Power (WA government-owned entity) is responsible for generating,
procuring, distributing, and selling electricity in region.
Horizon Power is currently executing the West Kimberley Power Project (WKPP)
which is designed to solve the Kimberley's heavy and expensive reliance on diesel
for electricity with a new system expected to deliver in the 2028 – 2030 window.
Annual power consumption of the five (5) main Kimberley demand centres
(Broome, Derby, Camballin/Looma, Fitzroy Crossing and Halls Creek) is ~ 190
GWh1 excluding power consumption for mining use.
Current gas demand for retail power generation is 6TJ/d to 13TJ/d (seasonal).
Plus more than 100 remote communities rely on diesel for primary power
generation.
Additional robust demand for power outside the immediate “capture zone” by
resource projects not on the gas pipeline network.
Existing and probable mine project demand estimated at >15TJ/d
1 Published Horizon Power data
Buru Energy Corporate Presentation – April 2026
Growth offtake opportunities for Rafael
12
Project Owner Location Road
distance from
Karratha
(kms)
Road
distance
from Rafael
(kms)
Approx.
daily
demand
Notes
Thunderbird Mineral Sands mine Sheffield Resources /
Yansteel
West Kimberley 730 115 2 TJ/d Natural potential customer due to proximity to Rafael
Kimberley Meat Works Alberta Investment
Management Co.
West Kimberley 845 70 0.5 – 1 TJ/d Natural potential customer due to proximity
Browns Range Heavy Rare
Earths mine
Northern Mineral East Kimberley 1,545 710 2 TJ/d FID 2Q 2026. First ore 2028. Requires trucked LNG
Savannah Project Zeta Resources East Kimberley 1,405 570 3-4 TJ/d Currently under Care & Maintenance , proposal to create
consolidated regional processing facility
Winu Copper/Gold/Silver mine Rio Tinto North Pilbara 615 620 3 TJ/d FID early 2027. First ore 2030. Requires trucked LNG.
Rafael costs very competitive.
Speewah Fluorite and Vanadium
Projects
Tivan Limited East Kimberley 1,520 685 1.5 – 3 TJ/d FID 4Q 2026. First ore 2029. Local offtake.
Ridges Iron Ore Project Kimberley Metals
Group (KMG)
East Kimberley N/A 630 0.3 – 0.5 TJ/d The mine has historically cycled between active
production and "care and maintenance" depending on
iron ore prices. Currently reliant on diesel for both plant
power and heavy mobility fuel.
Smaller gold and base metals
projects
Various North Pilbara N/A Various 3 TJ/d Existing demand and significant growth as mines switch
from diesel.
Curtin Airbase Department of Defence West Kimberley N/A 90 Variable Opportunity for condensate and LPG
Power generation for remote
communities
Horizon Power Various >1,000 >100 Variable Opportunity for condensate and LPG
Buru Energy Corporate Presentation – April 2026
Commercialisation roadmap
13
First cashflow targeting late 2028 / early 2029
Value-add activities:
1. Upstream / downstream project
integration
2. Gas, condensate and LPG1 marketing
3. Upstream funding, project commercial
frameworks and agreements
4. EPA2 WA Referral
5. Agreement making with Traditional
Owners
6. Drilling and flow testing Rafael 2H,
recompleting and flow testing Rafael 1
and Reserves Certification
1LPG = Liquified Petroleum Gas.
2EPA = Environmental Protection Authority Western Australia
Shifting Rafael 2H and Rafael 1 recompletion to post-wet season, de-risks operational logistics, better rig availability and aligns with the optimised development plan.
Buru Energy Corporate Presentation – April 2026
Strategic Development Agreement with a proven energy player
A renewables and thermal hybrid
power company powering the
next generation of mining and
resource projects in Australia.
Delivers LNG with an extensive
range of LNG sources and
distribution capabilities, including:
CEFA’s 250 tpd plant in Mt
Magnet, and it’s lifting
agreements at the 175tpd LNG
plant in Kwinana and 400tpd
Pluto LNG truck loader in
Karratha, WA
Australia’s largest fleet of LNG
road tankers and ISO containers
LNG storage and vaporisation
facilities for power generation
and industrial applications
across Australia
Builds, owns and operates
integrated LNG solutions for
mining operations,
communities and industry in
Australia, with a strong
portfolio of West Australian
customers including
Westgold Resources, Vault
Minerals, Lynas Rare Earths,
Pilbara Minerals and
Bellevue Gold.
An energy focused portfolio company, investing in energy infrastructure and low-carbon solutions
US private equity firm with US$40 billion in assets under management. Investments in 89 companies operating
across 70+ countries. The company invests in energy, utilities, transport and telecommunication projects in
North America, Europe, Asia and Latin America.
14
CEFA (downstream operator) to
finance, build, own and operate LNG
facility and distribute product to
market (~A$ 150 million)
Buru (upstream
operator) to drill a
low-risk well (Rafael
2H) to support
Reserves Certification
and flow-assurance
and convert Rafael 1
well to a production
well.
Buru pays a fee to CEFA to process and
distribute gas/liquids to customers
Buru Energy Corporate Presentation – April 2026
Co-operation on marketing
to be determined
Funding and optionality update
15
The Rafael Gas Project is a vital asset for regional energy security. Buru and Carlingford (UK) continue to facilitate the funding process
with potential counterparties.
Several options being pursued in parallel
Status of
partner
engagement
Multiple parties entering the Data Room and conducting technical and
commercial due diligence.
Range of options available and being discussed.
Strong project
fundamentals +
further value
uplift
To date, proponents have cited attractive project economics and improving
sentiment on the role of hydrocarbons in the medium to long term as reasons
for interest.
Recent design-led project /value uplift creates new opportunities for parties
that were looking for more upside (and downside protection).
Process
ongoing
Discussions continue with local and international parties whose strategic
horizons remain aligned with project and value realisation timing.
Buru pro-active
Actively broadening engagement to include investors focused on energy
based on the updated project economics and value accretive assets.
Concentrating on the “short-list” while exploring alternative funding structures.
Increased condensate and LPG product streams creates
additional project value, which increases the options available
for funding and commercial agreements
Buru Energy Corporate Presentation – April 2026
Experienced team to deliver
16
Ms Joanne Williams
Currently Independent Non-Executive Director
Executive Director from 8 May 2026
>25yrs technical, engineering
Mr Malcolm King
Independent Non-Executive Director
>35yrs commercial, exploration, operations
Paul Bird
CFO and Company Secretary
>25yrs finance, governance
Mr David Maxwell
Currently Independent Non-Executive Chair
Executive Chair from 8 May 2026
>35yrs strategy, gas commercialisation, risk and asset management
Leaders with deep industry
experience and a proven
track record of delivery
Thomas Nador
CEO – Departing the business on 8 May 2026 for health reasons
>25yrs strategy, resource development, commercial
Project
Development
Support
Buru Energy Corporate Presentation – April 2026
Rafael summary
17
1
High value gas
business with
condensate plus
LPG significant
value adds
Rafael Gas Project is a market disruptor and has no competition as a regional producer of hydrocarbon-
based fuel.
Attractive returns and long-term (~20 years) foundation cash flow from 2028/29. Gas for domestic use
plus material volume of condensate liquids and LPG for domestic markets.
2
…based on a
proven resource
Rafael discovery in 2021, the first proven major conventional gas field found onshore in the Canning
Basin, Western Australia (WA). Buru owns 100% and operates the field.
Foundation Project is based on the high confidence (P90) resource volume of 85 Bscf of gas and 1.8
MMstb of liquids.
Significant resource upside via P50 (best estimate), P10 (high estimate) and a deeper resource play
(Flying Fox).
3
… developed via a
simple project
Small footprint based on existing well pad and modularised 250-300tpd LNG plant:
• proven design, with existing plants in WA, and
• initial 2 wells (including the discovery well).
4
… to supply an
existing market
with growth
A local source of LNG, condensate liquids and LPG, replacing costly and insecure long-distance
trucking or imported fuel for power generation and mining in northwest Western Australia.
5
… with an
established
downstream
partner
An agreed business model with Clean Energy Fuels Australia (CEFA) to finance, build, own and operate
the LNG plant and is natural partner for product distribution. Model includes investment of ~ A$150 million
(80% of project capex) recovered via a fee payable by Buru. Buru pre-FID spend limited to resource
validation, approvals and upstream operations.
6
… being
optimised to
maximize
shareholder value
Additional condensate and LPG product streams increase commercial optionality and total project
value by circa 45%. Buru is the natural party to market and benefit from increased condensate value.
Buru Energy Corporate Presentation – April 2026
Rafael 1 well testing – March 2022
Equity Raising
ASX:BRU
Example of a small-scale LNG facility at Mount Magnet, Western Australia.
Photo courtesy of Clean Energy Fuels Australia (CEFA)
19
Equity raising summary
Buru Energy Corporate Presentation – April 2026
Offer Size and Structure
• Two-tranche placement to raise ~A$5.3 million (before costs) (“Placement”) comprising the issue of up to ~355 million new fully paid ordinary
shares (“New Shares”):
• Tranche 1 to raise ~A$2.3 million via the issue of ~152 million New Shares utilising the Company’s existing placement capacity under
Listing Rules 7.1 and 7.1a (“Tranche 1”); and
• Tranche 2 to raise ~A$3.0 million via the issue of ~203 million New Shares, subject to shareholder approval which is to be sought at an
upcoming general meeting expected to be held in May 2026 (“Tranche 2”).
Attaching Option
• Placement participants will receive one (1) free attaching option for every two (2) New Shares allocated in the Placement, exercisable at A$0.022
(~50% premium to the Offer Price) with a three (3) year expiry from date of issue (“Attaching Options”).
• The Attaching Options will be issued subject to shareholder approval at the upcoming general meeting.
• The Company will seek quotation of the Attaching Options on the ASX if the minimum spread requirements set out by the ASX are achieved.
Offer Price
• Fixed offer price of A$0.015 per New Share, which represents:
• a 21.1% discount to the last closing price of A$0.019 on Wednesday, 15 April 2026; and
• a 17.9% discount to the 10-day volume weighted average price of A$0.018 on Wednesday, 15 April 2026.
Use of Proceeds
• Placement proceeds will be used to fund pre-FID development activity for the Rafael Gas Project and provide additional working capital as the
Company explores the optimum commercial structure and funding path for development of the Rafael Gas Project. See slide 20 for further details.