Quarterly Activities and Cash Flow Report - June 2023
Released
Released
Announcement PDF
Quarterly Report
Period ended 30 June 2023
Buru Energy Limited (Buru, Company) is pleased to provide the quarterly report for the period
ended 30 June 2023.
Chief Executive Officer’s comments on the report:
“Throughout the quarter, Buru’s execution discipline has again yielded positive results across
the business.
ASX:
BRUassociated with Buru’s wholly owned and transformative Rafael gas and condensate
Activities
discovery, where the gross contingent resources have been independently assessed to be over
one trillion cubic feet (TCF) of gas and over 20 million barrels of condensate1 dominated
organisational focus during the quarter.
Buru will continue to invest its efforts, capital, and capability to bring this game changing
development to fruition through structured processes, discipline, capability, and partnerships.
Since Buru’s acquisition of Origin Energy’s Canning Basin Joint Venture interests on favourable
terms only months ago giving Buru 100% of the asset, the Company is delivering across
multiple fronts to build the value of Rafael.
On the regulatory front, this progress is evidenced by the government’s approval of the Rafael
Declaration of Location, representing the final step prior to Buru’s application for a Production
Licence for the future development of Rafael.
In terms of field activity, Buru has executed a contract with Terrex Seismic and is planning to
commence the acquisition of a 3D seismic survey over the Rafael structure in the very near
term.
This high impact, high value and cost-effective activity will de-risk the subsurface, inform Buru’s
plans for appraisal drilling in 2024 and create partnership opportunities for the Rafael
development. In parallel, Buru is progressing preparations for well planning and rig selection
and long lead item procurement in support of next years’ appraisal drilling activities.
On the development front, Buru has completed the first of several concept development studies
to commercialise Rafael gas and condensate. This first study, based on a ‘high’ potential Rafael
resource volume case, demonstrated technical, commercial, and economic feasibility of a
compact regional Floating LNG concept.
The Company is in the process of quality assuring other studies completed during the quarter
by third parties that are based on potential ‘mid’ and ‘low’ Rafael resource volume cases to
demonstrate project viability across the full spectrum of resource outcomes.
During the quarter, Buru, via its wholly owned new energy focused subsidiaries also continued
to mature subsurface and development studies which will provide value benefits as and when
these entities become commercialised in the future.
1 Refer to ASX Release of 26 April 2022 for full definitions and disclosures, and Attachment 1 for additional
details. Buru is not aware of any new information or data that materially affects this assessment and that
all material assumptions and technical parameters underpinning the estimates continue to apply and have
not materially changed.
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
1
Finally, during the quarter Buru restarted production from its Ungani Oilfield following a period
of nearly five months of disruption due to the impact of ex-Tropical Cyclone Ellie in the
Kimberley and the unprecedented flooding and damage caused to the oil transportation road
route the Company uses, and in particularly the river crossing at Fitzroy Crossing.
Unfortunately, within two months of the restart, unseasonal rain again caused disruption to the
temporary river crossing at Fitzroy Crossing, necessitating a one-week suspension to
operations, further highlighting the unreliable state of the current road transportation route.
The Ungani Joint Venture is reviewing its options regarding operations, as the current temporary
river crossing will not be available during the upcoming wet season, and a permanent river
crossing at Fitzroy Crossing will not be available until mid-2024.
To remain competitive and resilient in an industry that often poses challenges, Buru remains
dedicated to prioritising capital allocation discipline and cost control throughout all its
operations.
It has been another active quarter, and I thank our talented and committed staff and the trust
and support of our shareholders.
Looking ahead, we are excited by the opportunities that lie before us, and I look forward to
keeping you informed of our progress.”
Thomas Nador, Chief Executive Officer
2
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Highlights
Exploration and Appraisal
•
In April 2023 Buru submitted a Declaration of Location application for the Rafael gas and
condensate discovery in exploration permit EP 428 as the next step en-route to a
Production Licence which is required for the commercialisation of Buru’s 100% owned
Rafael gas and condensate discovery, and
•
Buru, in collaboration with Transborders Energy and Technip Energies completed its prefeasibility study for a Kimberley based compact Floating Liquified Natural Gas (FLNG)
concept, which confirmed that the concept is a technically, commercially, and
economically feasible option to develop the Rafael gas and condensate resource.
Ungani Oilfield Production
•
In May 2023 Ungani oil production was restarted following the re-establishment of the
oil transportation road route from the production facility to the export facility at
Wyndham,
•
Quarterly oil production of a gross ~ 25,000 bbls, Buru’s share 50%,
•
The average field production rate during the quarter was 472 bopd, and
•
No Ungani crude was lifted during the quarter and no sales were completed.
Corporate
•
Buru held its Annual General Meeting on 25 May 2023, all resolutions put to shareholders
were decided by poll and approved.
Subsequent key events (July 2023)
•
Approval was received from the Department of Mines, Industry Regulation and Safety
(DMIRS) for the Declaration of Location application for the Rafael 1 gas and condensate
discovery in exploration permit EP 428 in the Canning Basin,
•
Buru executed a contract with Terrex Pty Ltd (Terrex) to undertake a 3D seismic survey
principally within exploration permit EP 428 which contains the Company’s 100% owned
and operated Rafael conventional gas and condensate discovery,
•
Ungani production was suspended on 5 July 2023 due to the closure of the oil
transportation road route at Fitzroy Crossing due to unseasonal heavy rain in the
Kimberley. Production and transportation recommenced on 13 July, and
•
The planned lifting of crude oil from the Wyndham storage tank remains on track to
occur in late August.
•
Buru wholly owned hydrogen and helium business 2H Resources, executed a Research
Agreement with CSIRO. The Research Agreement is for a project entitled “Baseline
study for natural hydrogen flow – long term deployment of autonomous monitoring
instruments to detect natural hydrogen and other gases in soil.”
3
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Figure 1 - Operational areas in Western Australia
Figure 2 – Operational areas in the Canning Basin
4
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Figure 3 – 2H Resources Exploration Licence application areas in South Australia
Proposed Appraisal Program of the Rafael Gas and Condensate Discovery
During April 2023 Buru submitted a Declaration of Location application for the Rafael 1 gas
and condensate discovery in exploration permit EP 428 in the Canning Basin to the
Department of Mines, Industry Regulation and Safety (DMIRS). The application nominated
two graticular blocks covering an area of about 160 square kilometres within Buru’s 100%
owned exploration permit EP 428.
The submission followed the discovery of a potentially major gas and condensate resource
by the Rafael 1 well and lodgement of a Discovery Assessment Report to DMIRS in May 2022.
The Declaration of Location is the next step in the process to obtain a Production Licence
(PL) to allow the Rafael gas and condensate resource to be developed. Following the approval
of the Declaration of Location by DMIRS, Buru has up to two years in which to apply for a
Production Licence or Retention Lease, a period which may be extended to four years at the
discretion of the Minister.
The Rafael appraisal program is ongoing with mapping of reprocessed 2D seismic data and
depth conversions using independent velocity field analysis together with further analysis of
well data providing further insights into potential resource volumes.
During the quarter, preparations for the planned Rafael 3D seismic survey were progressed
across technical, commercial and approvals work fronts.
Subsequent to the quarter, Buru executed a contract with Terrex Pty Ltd to undertake the
3D seismic survey, an activity which is expected to commence on schedule in Q3 CY2023
and take approximately 8 weeks to complete. The 3D seismic will provide guidance for the
appraisal drilling program targeted for 2024 with well planning and identification of long lead
items being advanced in parallel.
5
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Data processing contracts have also been agreed with third parties, with interpretation of
fast-tracked data targeted by end CY 2023 to allow timely planning and approvals for the
2024 appraisal drilling activities and support discussions with prospective Joint Venture
partners for the Rafael development.
Commercialisation of the Rafael Gas and Condensate Discovery
In April 2023 Buru announced that it had completed the first in a series of development
concept studies to commercialise the Rafael gas and condensate resource.
This study, conducted in collaboration with Transborders Energy and Technip Energies
demonstrated that a Kimberley based Floating Liquified Natural Gas (FLNG) facility is a
technically, commercially, and economically feasible option to commercialise the 100% Buru
Energy owned Rafael gas and condensate contingent resource based on independently
assessed potential gross recoverable volumes of over one TCF (trillion cubic feet) of gas and
over 20 million barrels of condensate 1.
The study confirmed that a compact, regionally located ~1.6 million tonnes per annum
(MTPA) FLNG facility, in conjunction with onshore condensate and LPG processing is an
economically robust path for development of the Rafael resource and could provide a
relatively lower cost and shorter time frame to development than alternative gas export
options.
Buru will continue to work with Transborders Energy and its multi-project collaboration
partners including Kyushu Electric Power, Mitsui O.S.K. Lines, Technip Energies, SBM
Offshore and Add Energy (part of ABL Group ASA), to progress commercial discussions and
to refine the cost and schedule parameters for the next phase of project definition.
In parallel with the Transborders study, Buru has also been exploring several other pathways
to commercialise the Rafael resource across a range of potential Rafael resource volume
sizes with the support of third-party engineering contractors.
These concepts include local LNG production for Kimberley energy requirements, and local
value adding downstream projects for methanol and ammonia.
This work was completed on schedule during the quarter and is currently undergoing internal
assurance by Buru.
Buru has also identified the potential for these developments to benefit from Carbon Capture
and Storage (CCS) solutions being developed by Buru Energy’s Geovault subsidiary.
Conducting these studies in parallel with the ongoing appraisal of the Rafael resource will
ensure a faster transition to Front End Engineering and Design (FEED) following appraisal
drilling in 2024, and a reduced delivery timeframe to first product sales from this potentially
regionally significant project.
Refer to ASX release of 26 April 2022 and 18 April 2023 for full definitions and disclosures, and
Attachment 1 for additional details. Buru is not aware of any new information or data that materially
affects this assessment and that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed.
1
6
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Ungani Oilfield (L20/L21 - Buru 50% and Operator, Roc Oil Limited 50%)
Production
Oil production at the Ungani Production Facility (UPF) was suspended on 5 January 2023,
due to the impact of ex-Tropical Cyclone Ellie on sections of the Great Northern Highway and
the Fitzroy River bridge at Fitzroy Crossing, resulting in the closure of the oil transportation
road route from the UPF to the export facility at Wyndham Port.
Following the construction by Main Roads WA of a temporary low-level crossing of the Fitzroy
River at Fitzroy Crossing that is suitable for heavy vehicles, Buru recommenced trucking
operations on 8 May 2023 to clear the oil inventory at the UPF, with production operations
restarting at the UPF shortly after.
Production from the Ungani Oilfield for the quarter totaled a gross ~25,000 bbls (March
quarter zero bbls).
Ungani average field production remains dependent on well uptime, maintenance, and other
operational matters and averaged 472 bopd for the quarter.
Subsequent to the quarter, on 5 July 2023 Buru suspended operations for one week due to
unseasonal rain in the Kimberley and the closure of the temporary low-level river crossing
at Fitzroy Crossing.
In discussions with Main Roads WA, Buru has been advised that the current river crossing
arrangement is likely to be unavailable during the upcoming wet season (November-April).
As the permanent bridge across the Fitzroy River is not expected to be operational until mid2024, the Ungani Joint Venture is reviewing its options regarding operations and logistics.
Oil Sales
Oil from the Ungani Oilfield is trucked via the Great Northern Highway to a storage tank at
the Port of Wyndham where it is sold FOB under a marketing agreement with BP Singapore
Pte Limited (BP). Ungani oil is primarily supplying SE Asian refineries.
Given the unavailability of the oil transportation road route from the UPF to the Port of
Wyndham until May 2023, there were no oil liftings during the quarter. The next oil lifting is
planned for late August 2023.
Other Oil and Gas Assets
Yulleroo Gasfield (Within EP 391 & EP 436 - Buru 100%)
The Yulleroo Gasfield accumulation contains a substantial 2C tight gas resource of over 700
bcf that has been independently certified. It forms part of the much larger prospective tight
gas resource in the wider Canning Basin and has potential for conventional gas resources.
Further analysis of the potential for a well targeting conventional sands in the accumulation
continues to be undertaken as part of preparation for the next potential drilling program in
the basin.
Lennard Shelf including Blina Oilfield (L6 & L8 - Buru 100%)
Decommissioning of the legacy Lennard Shelf assets continued during the quarter. Any future
production from Lennard Shelf fields including the Blina Oilfield and any new discoveries will
7
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
require installation of new equipment meeting current regulatory and environmental
standards.
Carnarvon Basin (EP 510 Buru 25%, EnRes 75% - a wholly owned subsidiary of Mineral
Resources Limited)
During the quarter, the joint venture continued planning activities in support of commencing
drilling operations of two exploration wells in CY 2024. These exploration wells will target
highly prospective Palaeozoic aged structures geologically analogous to Buru’s discoveries in
the Canning Basin. Under the terms of the farmin agreement between the parties, Buru will
be carried for its share of these well costs.
Integrated Energy Projects
Buru continues to develop three energy expansion and transition focused businesses via its
wholly owned subsidiary companies 2H Resources (natural hydrogen and helium exploration
and development), GeoVault (Carbon Capture and Storage) and Battmin (battery minerals
exploration.)
Balancing its short-medium term returns via its hydrocarbon focused business with its
longer-term business drivers and licence to operate, Buru is carrying out work both through
internal Buru Energy activity and through these subsidiaries, with the objective of these
subsidiaries becoming independent entities in due course.
Natural hydrogen exploration and development – 2H Resources
2H Resources was established to apply the geological knowledge of its supporting
shareholder Buru Energy in the exploration and appraisal of natural hydrogen (White or Gold
Hydrogen) accumulations. If found in commercially exploitable quantities, natural hydrogen
will be cost competitive against all forms of industrially manufactured hydrogen and could
potentially support the energy transition as a low to no-carbon energy source.
2H Resources has established an exploration portfolio in South Australia where the regulatory
framework is in place for natural hydrogen exploration and is actively evaluating other areas
where there is potential for natural hydrogen occurrences.
2H Resources has been confirmed as the preferred applicant for the granting of six South
Australian Petroleum Exploration Licences for hydrogen exploration that are geologically on
trend with legacy hydrogen discoveries, and two Gas Storage Exploration Licences.
An independent third-party Hydrogen Prospective Resource estimate from RISC Advisory for
these Petroleum Exploration Licence applications has confirmed the very significant potential
of these areas (Refer to ASX release of 23 January 2023) which reinforces 2H Resources’
view of the value opportunity associated with this venture.
The granting of the hydrogen exploration and gas storage licences to 2H Resources is subject
to a completion of land access agreements in accordance with the requirements of the
Commonwealth Native Title Act 1993 over any area where Native Title interests exist.
During the quarter, 2H Resources continued to engage with key Native Title groups covering
the application areas and is progressing these land access agreements.
In parallel, 2H Resources continues to conduct further geological and geophysical analysis of
the licence application areas to improve the understanding of hydrogen trap mechanisms
and prospectivity to inform an optimizes future exploration program.
8
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Carbon Capture and Storage (CCS) - GeoVault
Carbon capture and storage (CCS) is the process of capturing carbon dioxide (CO2) before
it enters the atmosphere, transporting it, and storing it in underground geological formations.
CCS complements other emission reduction technologies by addressing emissions that
currently cannot be avoided, including CO2 emissions from industrial processes.
Since early 2021 Buru has been progressing CCS technical and commercial activities through
its GeoVault subsidiary, with a focus on onshore geological greenhouse gas (GHG) storage
in the Canning Basin and the Carnarvon Basin (EP 510).
GeoVault aims to be a pre-eminent operator in the identification, development and operation
of GHG storage projects in Australia. Leveraging Buru’s considerable geological intellectual
property, GeoVault is in the process of building a GeoVault-operated inventory of geologically
suitable storage formations matched to projects requiring storage.
In addition to providing direct benefits to Buru and its Rafael development, this storage
capacity will be made available to companies seeking to reduce their GHG emissions as part
of the transition to a lower carbon future.
During the quarter, GeoVault continued to mature subsurface studies and carbon storage
capacity assessments for CCS opportunities across its Canning and Carnarvon Basin interests
as well as technical and commercialisation studies.
Battery Minerals Exploration - Battmin (Buru 50%, Sipa Resources 50% and Operator)
Battmin, a wholly owned subsidiary of Buru, was initially formed to apply the geological
knowledge that Buru had acquired in its extensive petroleum exploration activity in the
Canning Basin to the exploration for minerals formed by similar processes, and often in
association with, oil and gas accumulations.
Battmin’s activities are currently focused on its Barbwire Terrace demonstration project in
the central Canning Basin in joint venture with Sipa Resources Limited (“Sipa”). This project
is targeting zinc/lead mineralisation in carbonate sections along a Devonian Reef Trend.
During the quarter, the Joint Venture undertook detailed core analysis from the three
diamond core holes drilled late 2022 and worked to define any future potential activity on
this project.
Other permits held by Battmin are being systematically high graded or relinquished as
appropriate.
Corporate
Buru held its Annual General Meeting on 25 May 2023, all resolutions put to shareholders
were decided by poll and approved.
9
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Financial
As at 30 June 2023, the Company had ~$11.3 million in cash and cash equivalents, with no
debt. The ASX Appendix 5B attached to this report contains the Company’s cash flow
statement for the quarter which is summarised as follows:
Cashflows
Opening cash
Production (net)
Development
Exploration
Corporate & Admin (net of interest)
Total cash inflow / (outflow)
Closing cash
Production:
June 2023 Quarter
$13.9m
($0.6m)
($1.6m)
($0.4m)
($2.6m)
$11.3m
Year to date 2023
$17.9m
($2.1m)
($0.1m)
($3.0m)
($1.4m)
($6.6m)
$11.3m
Operations at the Ungani Production Facility (UPF) resumed on 9
May following the re-establishment of oil export road route. During
the period the UPF was not operational, Buru implemented cost
saving measures to reduce its outgoings, these resulted in lower
operating cash outflows during the quarter.
Subsequent to the quarter, unseasonal heavy rainfall events in the
Kimberley led to the closure of the causeway crossing at the Fitzroy
River and operations at the UPF were suspended for one week
when onsite storage facilities reached their maximum safe holding
level. Operations at the UPF and road transportation recommenced
again on 13 July. Planned lifting of crude oil from the Wyndham
storage tank remains on track to occur in late August.
Exploration:
Exploration cash outflows included appraisal activities for the
Rafael discovery, asset integrity and decommissioning costs,
expenditures relating to desktop geological and geophysical work,
as well as integrated energy transition projects and other new
ventures.
Corporate and Admin: Corporate and admin cash outflows were lower than the prior
quarters, owing to Buru’s continued focus on capital allocation
discipline and cost control.
This ASX announcement has been authorised for release by the Buru Board of Directors.
For further information, visit www.buruenergy.com or contact
Thomas Nador, Chief Executive Officer
Telephone: +61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
10
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
Schedule of interests in permits as at 30 June 2023
Type
Ownership
Operator
Location
L61
Permit
Production licence
100.00%
Buru Energy Ltd
Canning Basin, WA
L8
Production licence
100.00%
Buru Energy Ltd
Canning Basin, WA
L 17
Production licence
100.00%
Buru Energy Ltd
Canning Basin, WA
L 20
Production licence
50.00%
Buru Energy Ltd
Canning Basin, WA
L 21
Production licence
50.00%
Buru Energy Ltd
Canning Basin, WA
Exploration permit
100.00%2
Buru Energy Ltd
Canning Basin, WA
Exploration permit
100.00%2
Buru Energy Ltd
Canning Basin, WA
EP 129
1
EP 391
1
EP 428
Exploration permit
100.00%2
Buru Energy Ltd
Canning Basin, WA
EP 431
Exploration permit
100.00%2
Buru Energy Ltd
Canning Basin, WA
EP 436
Exploration permit
100.00%2
Buru Energy Ltd
Canning Basin, WA
EP 457
Exploration permit
60.00%2
Buru Fitzroy Pty Ltd
Canning Basin, WA
EP 458
Exploration permit
60.00%2
Buru Fitzroy Pty Ltd
Canning Basin, WA
EP 510
L22-2
Exploration permit
Exploration permit
25.00%
25.00%
Energy Resources Ltd
Energy Resources Ltd
Carnarvon Basin, WA
L22-4
Exploration permit
25.00%
Energy Resources Ltd
Carnarvon Basin, WA
E04/2674
Exploration permit
50.00%
Sipa Resources Pty Ltd
Canning Basin, WA
E04/2684
Exploration permit
50.00%
Sipa Resources Pty Ltd
Canning Basin, WA
Carnarvon Basin, WA
Buru’s interest in L6 and EP 129 exclude the Backreef Area
Subject to regulatory approvals following the lodgement of the instruments of transfer of the permits with the Department
of Mines, Industry Regulation and Safety (DMIRS)
2
About Buru Energy
Buru Energy Limited (ASX: BRU) is a Western Australian energy company headquartered in Perth with an
operational office in Broome. The Company’s goal is to deliver material benefits to its shareholders, the State of
Western Australia, the Traditional Owners and communities of the areas in which it operates, by successfully
exploring for and developing petroleum resources and by contributing to driving the energy transition in an
environmentally and culturally sensitive manner.
The Company’s petroleum assets and tenements are located onshore in the Canning Basin in the southwest
Kimberley region of Western Australia and the onshore Carnarvon Basin in Western Australia. In the Kimberley
it owns and operates 50% of the conventional Ungani Oilfield project and the conventional gas condensate
discovery at Rafael 1. It also operates a Canning Basin wide portfolio of exploration permits and licences
prospective for conventional and unconventional resources with working interests ranging from 60% to 100%.
Its onshore Carnarvon Basin holdings are prospective for conventional oil and gas and have significant potential
for carbon capture and storage activity.
Buru Energy is also participating in the new energy economy through its subsidiary companies’ activities in natural
hydrogen, carbon capture and storage, and battery minerals.
Forward Looking Statements
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru Energy"). This report
contains certain statements which may constitute "forward-looking statements". It is believed that the
expectations reflected in these statements are reasonable but they may be affected by a variety of variables and
changes in underlying assumptions which could cause actual results or trends to differ materially, including, but
not limited to: price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve
and resource estimates, loss of market, industry competition, environmental risks, physical risks, legislative,
fiscal and regulatory developments, economic and financial market conditions in various countries and regions,
political risks, project delays or advancements, approvals and cost estimates. All of Buru’s operations and
activities are subject to joint venture, regulatory and other approvals and their timing and order may also be
affected by weather, availability of equipment and materials and land access arrangements, including native title
arrangements. Although Buru believes that the expectations raised in this report are reasonable there can be no
11
Level 2, 16 Ord St West Perth WA 6005
1800 337 330
info@buruenergy.com
ABN 71 130 651 437
certainty that the events or operations described in this report will occur in the timeframe or order presented or
at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future
production, development expenditures, operating expenses and cash flows. Oil and gas reserve engineering and
resource assessment must be recognised as a subjective process of estimating subsurface accumulations of oil
and gas that cannot be measured in an exact way. Any contingent resources and prospective resources presented
in this report are pursuant to the Company’s ASX release of 26 April 2022. The estimates of contingent and
prospective resources included in this Presentation have been prepared in accordance with the definitions and
guidelines set forth in the SPE PRMS. Buru Energy is not aware of any new information or data that materially
affects the information included in this presentation and all material assumptions and technical parameters
underpinning the estimates in this presentation continue to apply and have not materially changed. The
probabilistic method was used to prepare the estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other person that the material
contained in this report will be achieved or prove to be correct. Except for statutory liability which cannot be
excluded, each of Buru, its officers, employees and advisers expressly disclaims any responsibility for the accuracy
or completeness of the material contained in this report and excludes all liability whatsoever (including in
negligence) for any loss or damage which may be suffered by any person as a consequence if any information in
this report or any error or omission there from. Neither Buru nor any other person accepts any responsibility to
update any person regarding any inaccuracy, omission or change in information in this report or any other
information made available to a person nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
12