Rafael Gas Project
Opportunity to participate in the transformation of Buru
Energy
Building a gas business to generate near-term foundation
long-term cashflow + significant growth opportunities
1 September 2025
Disclaimer
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”) and has been authorised for the intended purpose by the Non-Executive Chair of Buru Energy Limited.
This presentation contains certain statements which may constitute "forward-looking statements". It is believed that the expectations reflected in these statements are reasonable but they may be
affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including, but not limited to: price fluctuations, actual demand,
currency fluctuations, drilling and production results, reserve and resource estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory
developments, economic and financial market conditions in various countries and regions, political risks, project delays or advancements, approvals and cost estimates. All of Buru’s operations and
activities are subject to joint venture, regulatory and other approvals and their timing and order may also be affected by weather, availability of equipment and materials and land access
arrangements, including native title arrangements. Although Buru believes that the expectations raised in this presentation are reasonable there can be no certainty that the events or operations
described in this presentation will occur in the timeframe or order presented or at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production, development expenditures, operating expenses and cash flows. Oil and gas
reserve engineering and resource assessment must be recognised as a subjective process of estimating subsurface accumulations of oil and gas that cannot be measured in an exact way. All
contingent resources and prospective resources presented in this report are pursuant to the Company’s ASX releases of 14 August 2025 and 26 July 2024. The estimates of contingent and
prospective resources included in this Presentation have been prepared in accordance with the definitions and guidelines set forth in the SPE PRMS. Buru is not aware of any new information or
data that materially affects the information included in this presentation and all material assumptions and technical parameters underpinning the estimates in this presentation continue to apply and
have not materially changed. The probabilistic method was used to prepare the estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other person that the material contained in this presentation will be achieved or prove to be correct. Except for statutory
liability which cannot be excluded, each of Buru, its officers, employees and advisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in this
presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence if any information in this presentation or
any error or omission there from. Neither Buru nor any other person accepts any responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation
or any other information made available to a person nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
Company snapshot
Capital Structure
Where We Operate
Founded in 2008 - a Western
Australian oil and gas exploration
and production company.
Focus is the development and
commercialisation of the Rafael
Gas Project, based on Buru’s
wholly owned and operated
conventional gas and condensate
discovery in the Canning Basin of
WA.
Rafael Gas Project delivers
material and enduring cashflows
from early 2028 and creates long
term value and growth opportunities
for our shareholders and
stakeholders.
Buru Energy | Corporate Presentation September 2025
Shares on issue
million
779.4
Market Capitalisation1
$ million
21.0
Cash2
$ million
2.3
Debt
$ million
nil
12 month high
cents/share
9.5
12 month low
cents/share
2.2
1 as at 14 August 2025.
2 as at 30 June 2025.
Share Price Information
Shareholders by Type2
cps
$0.12
$0.10
$0.08
$0.06
$0.04
$0.02
16.7%
0.8%
0.8%
Research
Retail & HNW
Domestic
Institutions
Foreign
Institutions
81.7%
Jun’24
Jul
Aug
Sep
Oct Nov
Dec
Jan’25
Feb Mar Apr May Jun
Jul
Directors &
Employees
2 as at 30 June 2025.
1
Investment summary
Discovery: Rafael, discovered by Buru in 2021, is the first proven major conventional gas and condensate
resource found onshore in the Canning Basin, Western Australia.
Location Advantage: Rafael Gas Project is well-positioned to provide a local source of LNG and liquids, replacing
long-distance trucking or imported fuel for power generation and mining in northwest WA.
Partnership for LNG Plant: Buru has an agreed business model with Clean Energy Fuels Australia (CEFA) to
finance, build and operate a 250-300 tonnes per day LNG plant with associated marketing and product distribution.
LNG plant investment of ~ A$ 150 million to be recovered via a processing fee payable by Buru.
Funding for Development: Buru is working on initiatives to secure ~ A$ 40 million to drill a second well and prepare
the first well for production in Q2 2026, with reserves certification and final investment decision (FID) expected in Q3
2026, and startup planned for Q1 2028.
Financial Outlook: Project has attractive returns and long-term foundation cash flow from 2028 based on
conservative (P90) resources only
Growth Potential: Significant potential for increased resource estimates (e.g. P50), natural market growth, alongside
exploration opportunities.
Buru Energy | Corporate Presentation September 2025
2
The challenge being solved
The Kimberley energy system is outdated and relies on long haul trucked
or imported LNG and diesel for power generation. This is costly and
insecure, and the WA State Government is looking for an alternative from
2028.
Horizon Power (WA government-owned) is responsible for generating,
procuring, distributing, and selling electricity in region.
Annual power consumption of the five (5) main Kimberley demand
centres (Broome, Derby, Camballin/Looma, Fitzroy Crossing and Halls
Creek) is ~ 190 GWh1 excluding power consumption for mining use.
Rafael
Existing gas fired power stations
Current gas demand for retail power generation is 6TJ/d to 13TJ/d
(seasonal).
In addition, more than 100 remote communities rely on diesel for primary
power generation.
Also, there is robust demand for power outside the immediate “capture
zone” by resource projects not on the gas pipeline network.
Buru Energy | Corporate Presentation September 2025
Horizon Power Service Area, Horizon Power Annual Report 2024
1 Published Horizon Power data
3
Rafael Gas Project – key part of the solution
Uniquely positioned to replace a
legacy, costly and insecure
energy system in the north of
Western Australia that currently
relies on imports from outside the
region
Project Benefits
Existing trucked / imported
gas and diesel
Rafael Gas
Project
Proximity to market
840 - 1,400 km
90 – 500 km
Delivered cost
1
CO2
CO2
Transport emissions
Regional development
New market opportunities
Synergy with renewables
1 Regional gas generators are fuelled by LNG delivered by road from Karratha.
This is costed at $22/GJ (Broome Clean Energy Study Feb 2023, Sustainable Energy Now)
Buru Energy | Corporate Presentation September 2025
4
A simple project design
Indicative well locations for
Rafael 1 (existing discovery well)
and Rafael B (planned new well
for drilling in 2026)
Buru Energy | Corporate Presentation September 2025
Project is based on high confidence 1C Resource of 85 Bscf
2C best estimate (220 Bscf) or the 3C resource case (523 Bscf)1
adds material upside
Small footprint (on existing cleared Rafael 1 discovery well pad)
No pipeline (trucked LNG and condensate)
Proven design, modularised construction
Many global plants in operation, with several in Australia (and WA)
Up to 300t of LNG, ~250bbls condensate per day
Current plan is 2 wells (including Rafael 1 well recompletion)
20-year production life with robust cashflow
Upside with greater resource and market growth
Experienced downstream partner in Clean Energy Fuels Australia
(CEFA)
1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures. Buru is not aware of any new information or data
that materially affects this assessment and that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed.
5
Project commercial model
A$ 150 million to build, own,
operate facility and distribute
product to market
US private equity firm with US$40 billion in assets under management. Investments in 89 companies operating
across 70+ countries. The company invests in energy, utilities, transport and telecommunication projects in
North America, Europe, Asia and Latin America.
An energy focused portfolio company, investing in energy infrastructure and low-carbon solutions
A$ 40 million
to drill and
operate wells
to supply
plant.
Buru pays a fee to CEFA to process and
distribute gas/liquids to customers
Buru and CEFA are undertaking joint gas and liquids marketing
Buru Energy | Corporate Presentation September 2025
Builds, owns and operates
integrated LNG solutions for
mining operations,
communities and industry in
Australia, with a strong
portfolio of West Australian
customers including
Westgold Resources, Vault
Minerals, Lynas Rare Earths,
Pilbara Minerals and
Bellevue Gold.
Delivers LNG with an extensive
range of LNG sources and
distribution capabilities, including:
CEFA’s 250 tpd plant in Mt
Magnet, and it’s lifting
agreements at the 175tpd LNG
plant in Kwinana and 400tpd
Pluto LNG truck loader in
Karratha, WA
Australia’s largest fleet of LNG
road tankers and ISO containers
LNG storage and vaporisation
facilities for power generation
and industrial applications
across Australia
A renewables and thermal hybrid
power company powering the
next generation of mining and
resource projects in Australia.
6
Rafael has no regional competition
•
•
•
•
•
Rafael is 150 km inland (east) of Broome and 50 km from the Ungani oilfield
Rafael 1 discovery well drilled in EP 428 (Buru 100%) - pool fully mapped on
3D seismic to extend south into adjacent EP 457 (Buru 60% and Operator)
Large structure with areal closure of approximately 23km2 and mapped
vertical closure of approximately 400m.
Rafael Contingent Resources assessed between 85 Bscf and 523 Bscf of
gas and 1.8 MMstb and 10.6 MMstb of condensate1
Ongoing geoscience work to evaluate potential volumetric upside
1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this
•
•
•
•
•
Rafael - includes a 165m gross thickness of gas bearing reservoir within
the T20 Ungani Dolomite, analogous to naturally flowing reservoir in the
Ungani Oilfield
Proven 200m gas-down-to hydrocarbon column with pressures
supporting gas column that extends to the structural closure
Excellent gas quality - 2% CO2 and 40 bbl/MMscf condensate
Rafael-1 initial flow at 7.6 MMscf/d with no boundaries or depletion
observed
Additional dolomite reservoir is behind casing, yet to be tested
assessment and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
Buru Energy | Corporate Presentation September 2025
7
Rafael development based on 1C resource!
Depth (mSS)
W
Rafael 1
Gamma Ray)
Rafael B
E
Proposed)
(1) Primary Reservoir Interval (robust base case):
•
Crestal T20 Ungani Dolomite (Contingent Resources)
•
Proven reservoir, produced in Ungani Oilfield
•
Flow tested in 2022 and produced at 7.6 MMscf/d
Rafael Web-AVO Inversion – K Bulk Modulus, Carbonate Indicator
Carbonate Indicator
Upper Laurel
Dolomite
T30
T30 Upper
Laurel
Dolomite
UNTESTED ZONE
Ungani
Dolomite
T20
T20
Ungani
Dolomite
TESTED INTERVAL
Rafael 1 drilled on 2D seismic in 2021 encountered
significant gas columns in a large 4-way structural closure.
Deeper Nullara Carbonate
(2) Secondary Reservoir Interval (upside):
•
Upper T30 Laurel Dolomite (Prospective Resources)
•
Petrophysical evaluation indicates gas
•
Interval closed off and was not tested in 2022 due to operational difficulties
(3) Deeper Nullara target (upside):
•
New Flying Fox exploration target being worked (Prospective Resources)
Rafael Contingent Resources – T20 primary reservoir
Interval only (Buru analysis, post Rafael 3D seismic survey, pre-inversion
analysis)
Gross
1C2
2C
3C
Gas Bscf
85
220
523
Condensate MMstb
1.8
4.5
10.6
Net
1C2
2C
3C
Gas Bscf
76
176
401
Condensate MMstb
1.6
3.6
8.1
1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures. Buru is not aware of any new
Buru Energy | Corporate Presentation September 2025
information or data that materially affects this assessment and that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
2 High confidence resource volumes used to underpin Rafael Gas Project basis
8
Upside from Rafael 2C, 3C and Flying Fox
Flying Fox – a newly identified prospect beneath Rafael
Prospect Narrative: Devonian carbonate target, imaged on recently acquired Rafael
3D, immediately beneath the Rafael 1 discovery, within a faulted closure of 26 km2
and ~370m vertical relief
Opportunity: Upside Prospective Resource for the Rafael development
Can be tested by incremental deepening of proposed Rafael B well by ~ 500m
Primary Target: Gas reservoired in dolomitized, vuggy, reef facies of the Nullara or
Pillara Fm (Devonian) and sealed by shales of the May River Formation
Chance Of Success: 45%
Key risks and uncertainties:
• Reservoir quality – effectiveness risk for the dolomitized Devonian carbonate
• Fault seal – risk to leak into overlying T20 Ungani Dolomite
A’
Flying Fox Prospective Resources 1 (Buru analysis, post Rafael 3D seismic survey)
Rafael 1
Chance of
Success
(COS %)
1U
2U
3U
1U
2U
3U
Gross Prospective Resources
45
1.2
5.0
12.6
60
247
614
Net Prospective Resources
45
1.1
4.6
11.3
57
226
551
Proposed
Rafael B
A
Buru Energy | Corporate Presentation September 2025
Condensate (MMstb)
Gas (Bscf)
1 Prospective Resources relate to the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to
undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to
determine the existence of a significant quantity of potentially moveable hydrocarbons.
Please refer to ASX Release of 14 August 2025 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this assessment and
that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
9
Key de-risking events to date and planned
Indicative Project Value
Now
Achieved
Planned
Achieved
Secure an
Updated Rafael
Strategic Development
upstream
resource volumes
Agreement with Clean
development
Flying Fox prospect
Independent
confirm robust 2C
Energy Fuels Australia
partner to fund
Pre-FEED
identified beneath
review confirms
Rafael 3D
volumes and high
2026 resource
Study confirms to finance, build, own Rafael with potential
sizeable
seismic refines
confidence 1C to
and operate small scale to maintain “higher for
appraisal
viability of
contingent
reservoir
support a small-scale
LNG facility (~80% of longer” gas flow rates (remaining 20% of
Rafael
small-scale
resource
structure
gas & liquids project
project capex)
discovered
project capex)
LNG project
for Project
Planned
Buru Energy | Corporate Presentation September 2025
Project
approvals and
offtake
Successful
Final
appraisal and agreements for
Rafael gas and Investment
Reserves
condensate
Decision
Certification
10
Near term funding is required
Key activities for 2025 – Near-term funding to maintain project momentum to first cashflow in Q1 2028
1.
Regulatory approvals
2.
Agreement making with Traditional
Owners
3.
Gas / liquids marketing
4.
Finalise Rafael B well planning
5.
Finalise Rafael 1 recompletion design
6.
Upstream funding/partnering
7.
Rafael Resource Estimate update
(ongoing post 3D seismic inversion
analysis)
Buru Energy | Corporate Presentation September 2025
11
Focus on securing funding for resource appraisal
Buru is undertaking the appraisal
of the Rafael resource, currently
planned for Q2 2026.
Appraisal will support
Independent Reserves
Certification, which is a
Condition Precedent to binding
agreements with CEFA.
Buru is progressing several
pathways to secure funding by
late 2025/early 2026
Several options being pursued in parallel to secure funding for
Rafael resource appraisal in 2026
Estimated appraisal cost A$40 million
Private Equity /
Venture Capital
PE/VC who
specialise in the
energy sector
Joint Ventures
Debt / Mezzanine
financing
Strategic
partnerships
Partnering with
companies to share
upstream risk /
reward associated
with the Rafael Gas
Project and upside
resource potential
Loans / convertible
notes secured
against Rafael
asset and/or future
production
Collaborate with
companies that can
provide funding in
exchange for a
share in future
profits or production
from the Rafael
Gas Project
Australian and International Entities
Buru Energy | Corporate Presentation September 2025
12
Financial projections
Economic screening demonstrates
significant value:
Based on a 1C Contingent Resource of 85 Bcf of gas and 1.8 mmbls of condensate
14TJ/d, 250t LNG/250bbls condensate/day. Field Life ~20 years. Equity economics, ungeared in 2025-dollars.
Gas Price A$/GJ (domestic)
$10.00
$15.00
$18.00
Condensate Price A$/litre (domestic)
$1.00
$1.50
$1.80
Following in gross terms (A$), 2025$, pre-tax
Total gas revenue ($M)
$ 1,100
$ 1,800
$ 2,100
Total condensate revenue ($M)
$ 300
$ 400
$ 500
Total Opex/Royalties ($M)
($ 300)
($ 500)
($ 600)
Average Pre-Tax Operating Cashflow/annum ($M)
$ 40
$ 70
$ 87
NPV10 ($M)
$ 200
$ 400
$ 500
IRR
29%
44%
>50%
Figures above are before any financing costs and are inclusive of facilities and well capex and provisions for abex.
NPV and IRR are pre-tax. Buru Energy has more than $200 million in tax losses which can be applied against future profits.
$M = 2025$ million
•
Developing the Rafael Gas Project is a
transformational opportunity for Buru
•
Based on $15/GJ gas and $1.50 per litre of
condensate:
•
Gross unrisked NPV of A$ 400 million
•
Annual gross before tax cashflow of ~$70 million
•
Buru’s current market cap1 is substantively less
then the indicative annual cashflow to Buru from
2028
•
Gas processing tariff to be negotiated with CEFA,
aimed to ensure robust economic returns to each
party, and include mechanism to share upside
1 Buru’s market capitalisation as at 14 August 2025 was $21 million
Buru Energy | Corporate Presentation September 2025
13
Support the journey
From …
to transform Buru Energy from a successful explorer
to the developer of a material foundation Kimberley
gas business with long-term cashflow and opportunity
for further growth
100% owner of Rafael – the only proven significant
conventional gas and condensate resource in the
far north of Western Australia
Clear pathway for a Kimberley centred foundation
gas business with long-term cashflows from early
2028, enabling further growth
Rafael 1 drilling and discovery
To …
Unique opportunity for Rafael condensate as a
diesel substitute for power generation in the
Kimberley / Pilbara
Buru Energy | Corporate Presentation September 2025
Example of a small-scale LNG Plant in Western Australia
14
Opportunity to participate via Equity Raising
•
Use of funds target Rafael Gas Project activities which are Buru’s responsibility under the Strategic Development Agreement with CEFA. These
activities are required to be completed by Buru prior to binding agreements with CEFA, gas and condensate customers and FID
•
Share placement of $2.1 million completed with existing major Buru shareholders and professional investors at 2.0 cents per share
•
Issue price represents a 17.7% discount to 5-day VWAP on ASX of ~2.4 cents
•
Equity raising structured to allow all Buru shareholders to participate in $3.0 million Share Purchase Plan (SPP)
•
SPP allows each shareholder to subscribe for up to $30,000 at same issue price as share placement
•
Free attaching options (1 for 2 basis, 3.0 cents strike price, with 2-year expiry ), being issued to Placement participants and offered to Eligible
Shareholders who subscribe to the SPP, the issuance of the options will be subject to shareholder approval via an Extraordinary General Meeting
(EGM).
Key Indicative Dates
Capital Structure
Number of Shares
SPP Record Date
29 Aug ’25
Shares currently on issue
779,409,607
Issue of Placement Shares
5 Sep ’25
Placement Shares
105,000,000
Dispatch of SPP Documentation & SPP
Opening Date
8 Sep ’25
SPP Shares
150,000,000
SPP Closing Date
30 Sep ’25
Total Shares on issue post proposed
equity raising
1,034,409,607
Issue of SPP Shares
7 Oct ’25
Buru Energy | Corporate Presentation September 2025
15
Use of funds
Use of Funds
A$
million
%
3.6
70%
Working Capital
1.5
30%
TOTAL
5.1
100%
Rafael Gas Project - pre-FID development
-
Buru Energy | Corporate Presentation September 2025
Secure upstream funding partner
Native Title negotiations
Regulatory approvals
Gas and Condensate marketing
Upstream facility engineering
Appraisal / reserves certification
planning
16
Investment Risks (1)
Risk Category
Risks
Economic Risks
General economic conditions, movements in interest and inflation rates and currency exchange rates may have an adverse effect on the Company’s
exploration, development and production activities, as well as on its ability to fund those activities. If activities cannot be funded, there is a risk that
tenements may have to be surrendered or not renewed. Furthermore, share market conditions may affect the value of the Company’s quoted securities
regardless of the Company’s operating performance. Share market conditions are affected by many factors such as general economic outlook, interest
rates and inflation rates, currency fluctuations, changes in investor sentiment toward particular market sectors, the demand for, and supply of capital,
terrorism or other hostilities; and government fiscal, monetary and regulatory policies. The Company, its Directors or officers do not warrant the future
performance of the Company or any return on an investment in the Company.
Environmental Risks
The operations and proposed activities of the Company are subject to State and Commonwealth laws and regulations concerning the environment. As with
most exploration and development projects, the Company’s activities are expected to have an impact on the environment, particularly if advanced
exploration or development proceeds. It is the Company’s intention to conduct its activities to the highest standard of environmental obligation, including
compliance with all environmental laws, in order to minimise damage to the environment and risk of liability. Nevertheless, there are certain risks inherent
to Buru’s activities which could subject the Company to potential liability.
Title Risk
Interests in tenements in Australia are governed by Commonwealth and State legislation and are evidenced by the granting of licences or leases. Each
licence or lease is for a specific term and carries with it annual expenditure and reporting commitments, as well as other conditions requiring compliance.
Consequently, the Company could lose title to or its interest in tenements if licence conditions are not met or if insufficient funds are available to meet
expenditure commitments as and when they arise. Further, exploration tenements are subject to periodic renewal. There is no guarantee that current or
future tenements will be renewed or approved.
Renewal of the term of a granted tenement is at the discretion of the relevant government authority. Renewal conditions may include increased expenditure
or work commitments or compulsory relinquishment of the areas comprising the Company's projects. The imposition of new conditions or the inability to
meet those conditions may adversely affect the operations, financial position and/or performance of the Company.
Trading Liquidity Risk
The Company is a relatively small company in terms of market capitalisation, and it may not be covered by a broad base of research analysts. As a
consequence, there may be relatively few buyers and sellers of securities on the ASX at any given time and the market price may be highly volatile,
particularly in times of share market turbulence or negative investor sentiment. This may present difficulties for Shareholders seeking to liquidate their
holdings.
Buru Energy | Corporate Presentation September 2025
17
Investment Risks (2)
Risk Category
Risks
Financing Risk
The Company may need to raise additional funds in the future. There is no assurance that the Company will be able to secure additional funding, whether
debt, equity or otherwise, on acceptable terms, or at all. Any additional equity financing will dilute shareholdings.
Regulatory Approvals
Operating onshore in Western Australia requires comprehensive approval processes (depending on the particular activity) from a number of government
agencies including the Department of Mines, Petroleum and Exploration (the agency primarily tasked with regulating the WA onshore oil and gas industry),
the Department of Water and Environment Regulation and the Environmental Protection Authority (depending on the potential impacts of the activity). It is
possible that the Company may experience delays in the receipt of approvals from the relevant agencies which can have an adverse impact on the
Company’s ability to plan and undertake activities in the Canning Basin. Many of these approvals are also subject to appeals by third parties that have the
potential to further delay the approval process.
Native Title and
Heritage Clearances
The Company’s exploration permits and production licences are located in the Kimberley region of Western Australia and overlap lands that are subject to
native title. Before any exploration activities can be undertaken, the Company is required to obtain heritage clearances from the relevant native title holders
or claimants to ensure that no Aboriginal sites will be interfered with by the proposed activities. Although the Company has contractual relationships with
the various traditional owner groups and their representative bodies for the areas in which the Company operates, there can be lengthy delays associated
with this process, due to weather, availability of traditional owners and representative body staff, and the number of clearances requested by other
operators.
Gas Development
Activity
Any commercialisation of gas resources in the Canning Basin will be dependent on the volumes available and may require the development of the
infrastructure and contractual arrangements required to service local gas markets, the establishment of local petrochemical projects, or the transport and
processing infrastructure including gas pipelines required to access customer markets outside the Canning Basin. The scope of developing such
infrastructure will be largely a function of available gas resource volumes, customer gas contracting and economics as well as access to infrastructure
funding.
Regulatory, environmental and native title approvals will also be a requirement as part of any such developments. Accordingly, there is considerable
uncertainty as to the timing and scope of the potential commercialisation of the Company’s gas resources.
Buru Energy | Corporate Presentation September 2025
18
Investment Risks (3)
Risk Category
Risks
Additional
requirements for
capital
The funds raised under the Offer are considered to be sufficient to meet the immediate needs of the Company but will be insufficient to execute the
Company’s longer-term plans and strategies. The Company also has a number of appraisal and exploration projects within its portfolio, and additional
funding will be required at the appropriate time to fund these projects. Any additional equity financing will dilute shareholdings, and debt financing, if
available, may involve restrictions on financing and operating activities.
There is no guarantee that the Company will be able to secure any additional funding or be able to secure funding on terms favourable to the Company. If
the Company is unable to obtain additional financing as needed, it may be required to reduce the scope of its strategy, plans or operations or to look to
other funding mechanisms including asset sales or dilution.
Reliance on Key
Personnel
The Company’s success depends to a significant extent upon its key management personnel, as well as other technical and management personnel
including contractors, sub-contractors and consultants specific to the oil and gas industry. The loss of the services of any of the
Share your feedback
Discover