ASX Announcement
ASX Announcement
22 April 2026
Investor Webinar Presentation
Buru Energy Limited (Buru, Company) (ASX: BRU) is pleased to provide its Investor Webinar Presentation.
The presentation will be made by the Buru Energy CEO, Thomas Nador and Non-Executive Chair, David Maxwell,
on Wednesday 22 April at 11am AWST / 1pm AEST.
Authorisation
This ASX announcement has been authorised for release by the Chair of the Board of Directors.
For further information, please contact:
Thomas Z Nador
Chief Executive Officer
Telephone: +61 8 9215 1800
Freecall: 1800 337 330
Email: info@buruenergy.com
Rafael Gas Project
Fuelling the Future:
ASX:BRU
Example of a small-scale LNG facility at Mount Magnet, Western Australia.
Photo courtesy of Clean Energy Fuels Australia (CEFA)
Compelling Project Economics + Energy Security for
Northwest of Western Australia
Webinar Presentation 22 April 2026
Disclaimer
This document has been prepared by Buru Energy Limited ABN 71 130 651 437 (“Buru”) and has been authorised for the intended purpose by the Non-Executive Chair of Buru Energy Limited.
This presentation contains certain statements which may constitute "forward-looking statements". It is believed that the expectations reflected in these statements are reasonable but they may be affected
by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including, but not limited to: price fluctuations, actual demand, currency
fluctuations, drilling and production results, reserve and resource estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments,
economic and financial market conditions in various countries and regions, political risks, project delays or advancements, approvals and cost estimates. All of Buru’s operations and activities are subject to
joint venture, regulatory and other approvals and their timing and order may also be affected by weather, availability of equipment and materials and land access arrangements, including native title
arrangements. Although Buru believes that the expectations raised in this presentation are reasonable there can be no certainty that the events or operations described in this presentation will occur in the
timeframe or order presented or at all.
There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production, development expenditures, operating expenses and cash flows. Oil and gas reserve
engineering and resource assessment must be recognised as a subjective process of estimating subsurface accumulations of oil and gas that cannot be measured in an exact way. All contingent resources
and prospective resources presented in this report are pursuant to the Company’s ASX releases of 14 August 2025, 26 July 2024, 17 June 2024 and 18 January 2018 . The estimates of contingent and
prospective resources included in this Presentation have been prepared in accordance with the definitions and guidelines set forth in the SPE PRMS. Buru is not aware of any new information or data that
materially affects the information included in this presentation and all material assumptions and technical parameters underpinning the estimates in this presentation continue to apply and have not
materially changed. The probabilistic method was used to prepare the estimates of the contingent and prospective resources.
No representation or warranty, expressed or implied, is made by Buru or any other person that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability
which cannot be excluded, each of Buru, its officers, employees and advisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in this presentation and
excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence if any information in this presentation or any error or omission
there from. Neither Buru nor any other person accepts any responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information
made available to a person nor any obligation to furnish the person with any further information.
All references to $ are in Australian currency, unless stated otherwise.
Company snapshot
▪ Focused on the development and
commercialisation of the Rafael Gas
Project, based on Buru’s wholly
owned and operated conventional gas
and condensate discovery in the
Canning Basin of Western Australia.
▪ Rafael Gas Project expected to deliver
material and enduring cashflows from
2028/early 2029 and create long term
value and growth opportunities for
Buru shareholders and stakeholders.
Where We Operate
1
Board of Directors
Ms Joanne Williams
Currently Independent NED
(Executive Director from 8 May 2026)
Mr Malcolm King
Independent Non-Executive Director
Mr David Maxwell
Currently Independent Non-Executive Chair
(Executive Chair from 8 May 2026
Buru Energy Corporate Update – April 2026
Capital Structure
Shares on issue1 million 1,003
Market Capitalisation2 A$ million 17.0
Cash1 A$ million 2.0
Debt A$ million nil
12-month high cents/share 5.5
12-month low cents/share 1.6
Shareholders by Type3 Research
1 as at 31 March 2026, excludes recent equity raising
2 as at 20 April 2026
3 as at 31 December 2025.
88.6%
9.86%
0.8% 0.8%
Retail & HNW
Domestic
Institutions
Foreign
Institutions
Directors &
Employees
Rafael Gas Project Summary
2
1
High value gas
business with
condensate plus
LPG significant
value adds
▪ Rafael Gas Project is a market disruptor and has no competition as a regional producer of hydrocarbon-
based fuel.
▪ Attractive returns and long-term (~20 years) foundation cash flow from 2028/29. Gas for domestic use
plus material volume of condensate liquids and LPG for domestic markets.
2
…based on a
proven resource
▪ Rafael discovery in 2021, the first proven major conventional gas field found onshore in the Canning
Basin, Western Australia (WA). Buru owns 100% and operates the field.
▪ Foundation Project is based on the high confidence (P90) resource volume of 85 Bscf of gas and 1.8
MMstb of liquids.
▪ Significant resource upside via P50 (best estimate), P10 (high estimate) and a deeper resource play
(Flying Fox).
3
… developed via a
simple project
▪ Small footprint based on existing well pad and modularised 250-300tpd LNG plant:
• proven design, with existing plants in WA, and
• initial 2 wells (including the discovery well).
4
… to supply an
existing market
with growth
▪ A local source of LNG, condensate liquids and LPG, replacing costly and insecure long-distance
trucking or imported fuel for power generation and mining in northwest Western Australia.
5
… with an
established
downstream
partner
▪ An agreed business model with Clean Energy Fuels Australia (CEFA) to finance, build, own and operate
the LNG plant and is natural partner for product distribution. Model includes investment of ~ A$150 million
(80% of project capex) recovered via a fee payable by Buru. Buru pre-FID spend limited to resource
validation, approvals and upstream operations.
6
… being
optimised to
maximize
shareholder value
▪ Additional condensate and LPG product streams increase commercial optionality and total project
value by circa 45%. Buru is the natural party to market and benefit from increased condensate value.
Rafael 1 well testing – March 2022
Buru Energy Webinar Presentation – April 2026
High value business
Economic Screening 1 based on Rafael 1C Resource with initial 12-month production ramp up, and maximum
production rates of 200 tpd LNG, 69 kLpd condensate and 15tpd LPG for 20 years. Based on 100% Project
Economics and “mid-case” LNG, condensate and LPG sales price assumptions.
Economic screening date 2025 2026 2026
Financial structure Capex Model2 Capex Model2 Opex Model3
Gas Sales Price A$/GJ (domestic)4 $15.00 $15.00 $15.00
Liquids (condensate) Sales Price A$/litre (domestic) $1.50 $1.50 $1.50
LPG Sales Price A$/tonne (domestic) N/A $900.00 $900.00
Following in gross terms (A$), 2026$, pre-tax
Total gas revenue ($M) 1,800 1,810 1,810
Total condensate revenue ($M) 400 910 910
Total LPG revenue ($M) 0 120 120
Total Opex/Royalties ($M) (500) (790) (1,160)
Average Pre-Tax Operating Cashflow/annum ($M) 70 103 84
NPV10 ($M) 400 590 560
IRR 44% 42% 80%
1 Equity economics, ungeared in 2026-dollars. Basis of plant design for the 2026 cases include a 3rd well in Year 8 and additional capex for condensate separation, stabilisation and storage. Additional capex more than offset by higher returns from additional
condensate and new LPG product stream. The figures are before any financing costs and inclusive of facilities and well capex and provisions for abex. NPV and IRR are pre-tax. Buru Energy has more than $200 million in tax losses which can be applied
against future profits. $M = 2026$ million. 2 Capex model – Buru to finance entire project development, vs pay a recurring service fee (tariff) to a third party. 3 Opex model assumes third party capex plant investment recovered through a tariff. 4 Regional gas
fired power stations are fuelled by LNG delivered over long distances (615 – 1,520kms). This is costed at $22/GJ (Broome Clean Energy Study Feb 2023, Sustainable Energy Now)
3
Key insights
▪ Economic screening demonstrates significant
value. Note this is based on 200 tpd LNG with
plant capacity up to 250-300 tpd
▪ Material uplift from 2025 screening due to
expected increase in condensate production
and new LPG product stream
▪ “Mid-case”, represents a 20 - 47% increase in
annual pre-tax cashflow (depending on
capex/no tariff vs opex/tariff model)
▪ Internal Rate of Return range is 42 – 80%
depending on commercial model
1
Buru Energy Webinar Presentation – April 2026
Rafael Contingent Resources1 – T20 primary reservoir interval only
(Buru analysis, post Rafael 3D seismic survey, pre-inversion analysis)
Gross 1C2 2C 3C
Gas (Bscf) 85 220 523
Condensate (MMstb) 1.8 4.5 10.6
Net 1C2 2C 3C
Gas (Bscf) 76 176 401
Condensate (MMstb) 1.6 3.6 8.1
2 High confidence resource volumes used to underpinRafael Gas Project basis
1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures.Buru is not aware of any new
information or data that materially affects this assessment and that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
Rafael 1 drilled on 2D seismic in 2021 encountered
significant gas columns in a large 4-way structural closure.
(1) Primary Reservoir Interval (robust base case):
• Crestal T20 Ungani Dolomite (Contingent Resources)
• Proven reservoir, produced in Ungani Oilfield
• Flow tested in 2022 and produced at 7.6 MMscf/d
(2) Secondary Reservoir Interval (upside):
• Upper T30 Laurel Dolomite (Prospective Resources)
• Petrophysical evaluation indicates gas
• Interval closed off and was not tested in 2022 due to operational difficulties
(3) Deeper Nullara target (upside):
• New Flying Fox exploration target being worked (Prospective Resources)
4
Rafael - a large, high confidence resource
Rafael 1
Drilled
W E
Depth
(mSS)
Carbonate
Indicator
Ungani Dolomite (T20)
Upper Laurel Dolomite (T30)
T20 Ungani Dolomite
TESTED INTERVAL
T30 Upper Laurel Dolomite
UNTESTED ZONE
Rafael Web-AVO Inversion – K : Bulk Modulus, Carbonate Indicator
Rafael 2H
planned for
early 2027
Deeper Nullara Carbonate
2
Buru Energy Webinar Presentation – April 2026
Flying Fox Prospective Resources1 (Buru analysis, post Rafael 3D seismic survey)
1 Prospective Resources relate to the estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to
undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development.Further exploration appraisal and evaluation is required to
determine the existence of a significant quantity of potentially moveable hydrocarbons.
Please refer to ASX Release of 14 August 2025 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this assessment and
that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
Flying Fox – A prospect beneath Rafael
Prospect: Devonian carbonate target, imaged on recently acquired Rafael 3D,
immediately beneath the Rafael 1 discovery, within a faulted closure of 26 km2 and
~370m vertical relief
Opportunity: upside Prospective Resource for the Rafael development
Could be tested by incremental deepening of proposed Rafael 2H well by ~ 500m
Primary Target: gas reservoired in dolomitized, vuggy, reef facies of the Nullara or
Pillara Fm (Devonian) and sealed by shales of the May River Formation
Chance Of Success: 45%
Key risks and uncertainties:
• Reservoir quality – effectiveness risk for the dolomitized Devonian carbonate
• Fault seal – risk to leak into overlying T20 Ungani Dolomite
5
Significant potential for further resource upside
Chance of
Success
Condensate (MMstb) Gas (Bscf)
(COS %) 1U 2U 3U 1U 2U 3U
Gross Prospective Resources 45 1.2 5.0 12.6 60 247 614
Net Prospective Resources 45 1.1 4.6 11.3 57 226 551
2
Buru Energy Webinar Presentation – April 2026
Capital efficient project design
▪ Project is based on high confidence 1C Resource of 85 Bscf
▪ 2C best estimate (220 Bscf) or the 3C resource case (523 Bscf)1
adds material upside
▪ Small footprint (based around the existing cleared Rafael 1
discovery well pad – enabling simple and fast approvals )
▪ No pipeline (trucked LNG, condensate and LPG)
▪ Proven design, modularised construction
▪ Many global small scale LNG plants in operation, with several
in Australia (and WA)
▪ Production of up to 300t of LNG with associated condensate and
LPG
▪ Current plan based on 2 wells (including the recompletion of the
Rafael 1 discovery well as a production well)
▪ Approx 20-year production life with robust cashflow
▪ Significant upside with greater resource and market growth
Indicative well locations for
Rafael 1 (existing discovery well)
and Rafael 2H (previously B)
(planned new well for drilling in
2027) 1 Refer to the ASX release of 26 July 2024 for full definitions and disclosures.Buru is not aware of any new information or data
that materially affects this assessment and that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed.
6
3
Buru Energy Webinar Presentation – April 2026
Location delivering regional supply advantage
7
Horizon Power Service Area, Horizon Power Annual Report 2024
Existing gas fired power stations
Rafael
▪ Horizon Power (WA government-owned entity) is responsible for
generating, procuring, distributing, and selling electricity in region.
▪ Horizon Power is currently executing the West Kimberley Power
Project (WKPP) which is designed to solve the Kimberley's heavy and
expensive reliance on diesel for electricity with a new system expected
to deliver in the 2028 – 2030 window.
▪ Annual power consumption of the five (5) main Kimberley demand
centres (Broome, Derby, Camballin/Looma, Fitzroy Crossing and Halls
Creek) is ~ 190 GWh1 excluding power consumption for mining use.
▪ Current gas demand for retail power generation is 6TJ/d to 13TJ/d
(seasonal).
▪ Plus more than 100 remote communities rely on diesel for primary
power generation.
▪ Additional robust demand for power outside the immediate “capture
zone” by resource projects not on the gas pipeline network.
▪ Existing and probable mine project demand estimated at >15TJ/d.
1 Published Horizon Power data
4
Buru Energy Webinar Presentation – April 2026
Growth offtake opportunities for Rafael
8
Project Owner Location Road distance
from Karratha
(kms)
Road distance
from Rafael
(kms)
Approx.
daily
demand
Notes
Thunderbird Mineral Sands
mine
Sheffield Resources
/ Yansteel
West Kimberley 730 115 2 TJ/d Natural potential customer due to proximity to
Rafael
Kimberley Meat Works Alberta Investment
Management Co.
West Kimberley 845 70 0.5 – 1 TJ/d Natural potential customer due to proximity
Browns Range Heavy Rare
Earths mine
Northern Mineral East Kimberley 1,545 710 2 TJ/d FID 2Q 2026. First ore 2028. Requires trucked LNG
Savannah Project Zeta Resources East Kimberley 1,405 570 3-4 TJ/d Currently under Care & Maintenance , proposal to
create consolidated regional processing facility
Winu Copper/Gold/Silver mine Rio Tinto North Pilbara 615 620 3 TJ/d FID early 2027. First ore 2030. Requires trucked
LNG. Rafael costs very competitive.
Speewah Fluorite and
Vanadium Projects
Tivan Limited East Kimberley 1,520 685 1.5 – 3 TJ/d FID 4Q 2026. First ore 2029. Local offtake.
Ridges Iron Ore Project Kimberley Metals
Group (KMG)
East Kimberley N/A 630 0.3 – 0.5 TJ/d The mine has historically cycled between active
production and "care and maintenance" depending
on iron ore prices. Currently reliant on diesel for
both plant power and heavy mobility fuel.
Smaller gold and base metals
projects
Various North Pilbara N/A Various 3 TJ/d Existing demand and significant growth as mines
switch from diesel.
Curtin Airbase Department of
Defence
West Kimberley N/A 90 Variable Opportunity for condensate and LPG
Power generation for remote
communities
Horizon Power Various >1,000 >100 Variable Opportunity for condensate and LPG
4
Buru Energy Webinar Presentation – April 2026
Derisked funding through strategic partnership
A renewables and thermal hybrid
power company powering the
next generation of mining and
resource projects in Australia.
Delivers LNG with an extensive
range of LNG sources and
distribution capabilities, including:
▪ CEFA’s 250 tpd plant in Mt
Magnet, and it’s lifting
agreements at the 175tpd LNG
plant in Kwinana and 400tpd
Pluto LNG truck loader in
Karratha, WA
▪ Australia’s largest fleet of LNG
road tankers and ISO containers
▪ LNG storage and vaporisation
facilities for power generation
and industrial applications
across Australia
Builds, owns and operates
integrated LNG solutions for
mining operations,
communities and industry in
Australia, with a strong
portfolio of West Australian
customers including
Westgold Resources, Vault
Minerals, Lynas Rare Earths,
Pilbara Minerals and
Bellevue Gold.
An energy focused portfolio company, investing in energy infrastructure and low-carbon solutions
US private equity firm with US$40 billion in assets under management. Investments in 89 companies operating
across 70+ countries. The company invests in energy, utilities, transport and telecommunication projects in
North America, Europe, Asia and Latin America.
9
CEFA (downstream operator) to
finance, build, own and operate
LNG facility and distribute product
to market (~A$ 150 million)
Buru (upstream
operator) to drill a
low-risk well (Rafael
2H) to support
Reserves Certification
and flow-assurance
and convert Rafael 1
well to a production
well.
Buru pays a fee to CEFA to process
and distribute gas/liquids to customers
Co-operation on marketing
to be determined
5
Buru Energy Webinar Presentation – April 2026
2026 design-led insights create more value
10
▪ The SMR process is the
workhorse of the LNG industry
used in many liquefaction
installations.
▪ Process flow modelling confirms
uplift in condensate volumes and
a new, valuable LPG product
stream.
▪ Rafael Gas Project worth more
today than previous estimates.
▪ Buru working to ensure:
- final funding structure
reflects the increased
value; and
- shareholders benefit from
higher value.
Rafael Gas Project : Generic Single Mixed Refrigerant (SMR) based Small Scale Process Scheme
New source of value.
not modelled in
previous project
economics
Increased source of
value based on process
flow modelling and not
reflected in previous
project economics
Robust value
reconfirmed from
process flow
modelling.
Feedstock for power
generation and third-
party minerals
processing
6
Buru Energy Webinar Presentation – April 2026
Optimised schedule to capture value pre-FID
11
First cashflow targeting late 2028 / early 2029
Value-add activities:
1. Upstream / downstream project
integration
2. Gas, condensate and LPG1 marketing
3. Upstream funding, project commercial
frameworks and agreements
4. EPA2 WA Referral
5. Agreement making with Traditional
Owners
6. Drilling and flow testing Rafael 2H,
recompleting and flow testing Rafael 1
and Reserves Certification
1LPG = Liquified Petroleum Gas.
2EPA = Environmental Protection Authority Western Australia
Shifting Rafael 2H and Rafael 1 recompletion to post-wet season, de-risks operational logistics, better rig availability and aligns with the optimised development plan.
6
Buru Energy Webinar Presentation – April 2026
Funding and optionality update
12
The Rafael Gas Project is a vital asset for regional energy security. Buru and Carlingford (UK) continue to facilitate the funding process
with potential counterparties.
Several options being pursued in parallel
Status of
partner
engagement
▪ Multiple parties entering the Data Room and conducting technical and
commercial due diligence.
▪ Range of options available and being discussed.
Strong project
fundamentals +
further value
uplift
▪ To date, proponents have cited attractive project economics and improving
sentiment on the role of hydrocarbons in the medium to long term as reasons
for interest.
▪ Recent design-led project /value uplift creates new opportunities for parties
that were looking for more upside (and downside protection).
Process
ongoing
▪ Discussions continue with local and international parties whose strategic
horizons remain aligned with project and value realisation timing.
Buru pro-active
▪ Actively broadening engagement to include investors focused on energy
based on the updated project economics and value accretive assets.
▪ Concentrating on the “short-list” while exploring alternative funding structures.
Increased condensate and LPG product streams creates
additional project value, which increases the options available
for funding and commercial agreements
Buru Energy Webinar Presentation – April 2026
Experienced team to deliver
13
Ms Joanne Williams
Currently Independent Non-Executive Director
Executive Director from 8 May 2026
>25yrs technical, engineering
Mr Malcolm King
Independent Non-Executive Director
>35yrs commercial, exploration, operations
Paul Bird
CFO and Company Secretary
>25yrs finance, governance
Mr David Maxwell
Currently Independent Non-Executive Chair
Executive Chair from 8 May 2026
>35yrs strategy, gas commercialisation, risk and asset management
Leaders with deep industry
experience and a proven
track record of delivery
Thomas Nador
CEO – Departing the business on 8 May 2026 for health reasons
>25yrs strategy, resource development, commercial
Project
Development
Support
Buru Energy Webinar Presentation – April 2026
Questions and Answers
ASX:BRU
Example of a small-scale LNG facility at Mount Magnet, Western Australia.
Photo courtesy of Clean Energy Fuels Australia (CEFA)
Pre-webinar questions
Q - 1
• Why were shareholders not informed of the upside information but sophs were in the latest offer to them?
• Why no SPP for existing holders with the recent raising?
• The announcement on 17 April 2026 said that the Placement SPP will be announced on 17 April 2026. I can't find any other
information about the SPP. Can you clarify what is happening with the SPP (share purchase plan)?
• What are the funding/partnering options being considered?
• Will the momentum stall with no CEO?
• What about Government funding for Rafael?
Buru Energy Webinar Presentation – April 2026
Pre-webinar questions
Q - 2
• While the technical identification of additional liquids and LPG product streams is a welcome development, I am struggling to
reconcile the "increased value" narrative with the cold maths of the recent placement.
The company has reported that these engineering studies have increased the projected "mid-case" Rafael project value by more than
45%. However, the recent capital raise and the associated 1-for-2 free attaching options represent a potential dilution of
approximately 56% to existing shareholders if all options are eventually converted.
By my calculations (1.45 value/1.56 shares), an existing shareholder ends up with ~93% of the value-per-share they held previously.
How is the average shareholder "better off" by accepting a net decrease in their share of the project value in exchange for another
year’s delay to appraisal drilling?
How is the board looking after their interests? Has the company genuinely “elected” to pursue this revised path out of choice or due to
the complete failure of the downstream partnering process.
Alongside prioritising the Rafael Project, should restarting Ungani on a 100% basis to generate non-dilutive cash flow not have been
given the highest priority a long time ago instead of making it dependent on farming out 50% and drilling an exploration well?
Buru Energy Webinar Presentation – April 2026
Appendix 1
Portfolio of Assets
ASX:BRU
Example of a small-scale LNG facility at Mount Magnet, Western Australia.
Photo courtesy of Clean Energy Fuels Australia (CEFA)
Buru has a portfolio of assets - Yulleroo
A1 - 1
Depth Structure Map of the near top Lower Laurel Carbonates
Yulleroo 2 clean-up flow 2010
Prospective Resources Low Best High
Sales Gas (PJ) 124.6 302.8 611.0
Associated Liquids (MMbbls) 4.3 11.9 24.8
▪ Yulleroo accumulation is defined by four wells - all intersecting thick gas saturated sections with
gas below closure mapped on 3D seismic and Yulleroo 4 deliberately drilled outside closure
▪ Potential conventional pay in Yulleroo 3
▪ Yulleroo 2 in 2010 (3 zones) produced rates up to 1.8 mmcfd and high condensate content
▪ Independent review by RISC estimated Contingent and Prospective Resource sales gas and
associated liquids in the Yulleroo Field as at 1 December 2017 as follows:
Contingent Resources 1C 2C 3C
Unlimited Recoverable Sales Gas (PJ) 321.4 714.0 1,627.0
Unlimited Recoverable Associated Liquids (MMbbls) 9.5 24.9 47.6
• RISC’s Contingent Resource and Prospective Resource assessment has been prepared using the probabilistic method and an evaluation date of 1 December 2017.
• Contingent Resources are quantities of petroleum estimates as of a given date to be potentially recoverable from known accumulations by application of development project(s) but which are not currently considered to be commercially
recoverable due to one or more contingencies. Contingent Resources are a class of discovered recoverable resources.
• Prospective Resources are estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) that relate to undiscovered accumulations. These estimates have both an associated risk of
discovery and a risk of development. Further exploration, appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
• The full resource statement is set out in accordance with ASX Listing Rules in Buru’s ASX release of 18 January 2018. Buru Energy is not aware of any new information or data that materially affects the information included in the 18 January
2018 release and all material assumptions and technical parameters underpinning the estimates in that release continue to apply and have not materially changed.
A significant unconventional gas and liquids rich accumulation on the western side of the Canning Basin
Buru Energy Webinar Presentation – April 2026
Buru has a portfolio of assets - Ungani oilfield
A1 - 2
▪ Ungani under care and maintenance since
August 2023.
▪ Produced ~2.3mmbbls of oil to date with
~220,000 bbls remaining.
▪ Oil was previously sold at a premium to Dated
Brent into the Southeast Asian market.
▪ Success at nearfield exploration prospect (Mars
1) can underpin re-commencement of production
with robust economics
▪ Currently seeking expressions of interest for the
drilling of the Mars 1 exploration well
Buru Energy Webinar Presentation – April 2026
Buru has a portfolio of assets - Mars prospect
▪ Located 9km from the Ungani Production Facility (UPF), discovery at Mars 1
would underpin the restart of oil production, and increase commercialisation
options on robust economic terms
▪ Geological Chance of Success is 40%
▪ The Mars 1 exploration well has a planned maximum total vertical depth of
1,808 mTVDSS (success case)
▪ Drill and complete cost ~A$7 million
▪ A pipeline solution to the UPF could be laid in ~ 20 days at a cost of A$2 million
▪ Buru is progressing discussions with third parties looking for opportunities to
participate in an oil business
1 Prospective Resources relate to the estimated quantities of petroleum that may potentially be recovered by the
application of a future development project(s) and relate to undiscovered accumulations. These estimates have both an
associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation is required to
determine the existence of a significant quantity of potentially moveable hydrocarbons. Refer to Buru ASX Release 17 June
2024 for full definitions and disclosures. Buru is not aware of any new information or data that materially affects this
assessment and that all material assumptions and technical parameters underpinning the estimates continue to apply
and have not materially changed.
Prospective Resources (mmbbls)1 Low Best High
Stock Tank Oil Initially in Place (STOIIP) 3.0 10.6 21.7
Ultimate Recovery of Oil (UR) 0.7 2.8 6.2
A1 - 3
Buru Energy Webinar Presentation – April 2026