Weekly Drilling Report - Praslin 1
Released
Released
Announcement PDF
ASX Release
27 August 2015
Weekly Drilling Report Praslin 1 Exploration Well
ABN 71 130 651 437
Level 2, 88 William Street
Perth, Western Australia 6000
Ph: +61 8 9215 1800
Fax: +61 8 9215 1899
www.buruenergy.com
Buru Energy Limited (Buru Energy) provides the following weekly update on drilling operations at the Praslin 1 well as
at 06:00hrs, 27 August 2015 (AWST).
Since the last progress report, the well has been drilled ahead in 4-3/4” (120mm) hole to a total depth of 2,512 metres.
As at 06:00 hours today, preparations were underway to commence wireline logging. Further hydrocarbon indications
have been observed in the section below the interpreted Ungani Dolomite and these will also be evaluated by the
planned wireline logging program.
As planned, the hydrocarbon indications encountered in the well to date will be evaluated by the wireline logging
program and a decision on whether to run production casing and test the well will be made once the logs have been
evaluated.
Praslin 1 is located 90kms east of Broome and 15kms west of Buru Energy’s producing Ungani oil field. Buru Energy
and Mitsubishi Corporation each have a 50% equity and contributing interest in the Praslin 1 well and in EP391.
Visit www.buruenergy.com for information on Buru Energy’s current and future activities.
For inquiries please contact Buru Energy:
Telephone:
+61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
About Buru Energy
Buru Energy Limited (ASX: BRU, S&P/ASX300) is a Western Australian oil and gas exploration and production
company headquartered in Perth with an operational office in Broome. The Company’s petroleum assets and
tenements are located onshore in the Canning Basin in the southwest Kimberley region of Western Australia. Its
flagship high quality conventional Ungani oil field project is owned in 50/50 joint venture with Mitsubishi Corporation. As
well as Ungani, the Company’s portfolio includes potentially world class tight gas resources. The company’s goal is to
deliver material benefits to its shareholders, the State of Western Australia, the Traditional Owners of the areas in which
it operates, and the Kimberley community, by successfully exploring for and developing the petroleum resources of the
Canning Basin in an environmentally and culturally sensitive manner.
Competent Persons Statement
Information in this release related to exploration and production results and petroleum resources is based on
information compiled by Eric Streitberg who is an employee of Buru Energy Limited. Mr Streitberg is a Fellow of the
Australian Institute of Mining and Metallurgy and the Australian Institute of Company Directors, and a member and
Certified Petroleum Geologist of the American Association of Petroleum Geologists. He has over 40 years of relevant
experience. Mr Streitberg consents to the inclusion of the information in this document.
1
ASX Release
Praslin 1 Weekly Drilling Report
PERMIT
The Praslin 1 well is located in exploration permit EP 391R3, 90 kilometres to
the east of Broome and 15 kilometres west of the Ungani oil field.
WELL LOCATION
Latitude:
Longitude:
BURU ENERGY’S INTEREST
Buru Energy Limited holds a 50% interest in the well.
DATE OF PROGRESS REPORT
06:00 hours, 27 August 2015 (AWST)
CURRENT DEPTH (TOTAL DEPTH)
2,512 metres
SPUD DATE
17 July 2015
DAYS SINCE SPUD
41 days
OPERATIONS SINCE LAST
PROGRESS REPORT
Since the last progress report, the well has been drilled ahead in 4-3/4”
(120mm) hole to a total depth of 2,512 metres. As at 06:00 hours today,
preparations were underway to commence wireline logging.
HYDROCARBON INDICATIONS
Further hydrocarbon indications have been observed in the section below the
interpreted Ungani Dolomite and these will also be evaluated by the planned
wireline logging program.
FORWARD OPERATIONS
As planned, the hydrocarbon indications encountered in the well to date will
be evaluated by the wireline logging program and a decision on whether to
run production casing and test the well will be made once the logs have been
evaluated.
170 59’ 04.37” S
1230 01’ 13.58” E
Location Map for Praslin 1
Easting: 502,164m
Northing: 8,011,524m
Atlas Rig 2
2
Share your feedback
Discover