Ungani Far West 1 Spuds
Released
Released
Announcement PDF
ASX Release
ABN 71 130 651 437
Level 2, 88 William Street
Perth, Western Australia 6000
Ph: +61 8 9215 1800
Fax: +61 8 9215 1899
www.buruenergy.com
30 November 2015
Buru Energy spuds Ungani Far West 1 conventional oil appraisal well
Buru Energy Limited (ASX: BRU) is pleased to advise the Ungani Far West 1 appraisal well was spudded by Atlas Rig
2 at 10:30 AWST on Saturday 28 November 2015.
The well is located on an all weather drilling pad approximately one kilometre off the Ungani access road within
Production License L21, 97 kms east of Broome and 3.3 kms southwest of Buru Energy’s Ungani Oilfield in the
Canning Basin of northwestern Australia.
Ungani Far West 1 has a programmed maximum total depth of 2,600 metres and the operation is expected to take
some 48 days.
The well will appraise the western extent of the Ungani structure targeting conventional oil in the Lower Laurel (Ungani
Dolomite) carbonates. The Ungani Far West closure lies within the greater Ungani structural complex in a separate
culmination located to the west of the mapped Ungani Field outline. It is mapped on the 2014 Ungani 3D seismic as an
independent structural feature with vertical closure of some 50 metres, and if oil is present could add significantly to the
currently estimated Ungani volumes.
The well is planned to acquire a full core over the Ungani Dolomite section which will provide further critical insights into
the reservoir character of the highly productive Ungani Dolomite reservoir of the adjacent Ungani Oilfield. This
information will also assist in further refinement of the Ungani oil resource volumes.
Equity and contributing interest for the well are as follows. The well is being drilled under the terms of the Ungani
Development Funding agreement with Diamond Resources (Fitzroy) Pty Ltd.
Company
Buru Energy
Diamond Resources (Fitzroy)
Equity Interest
50%
50%
Contributing Interest
0%
100%
Visit www.buruenergy.com for information on Buru Energy’s current and future activities.
For investor inquiries please contact Buru Energy:
Telephone:
+61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
Media Enquiries:
Paul Armstrong
Read Corporate
+61 8 9388 1474/ 0421 619 084
1
ASX Release
About Buru Energy
Buru Energy Limited (ASX: BRU) is a Western Australian oil and gas exploration and production company
headquartered in Perth with an operational office in Broome. The Company’s petroleum assets and tenements are
located onshore in the Canning Basin in the southwest Kimberley region of Western Australia. Its flagship high quality
conventional Ungani Oilfield project is owned in 50/50 joint venture with Diamond Resources (Fitzroy) Pty Ltd. As well
as Ungani, the Company’s portfolio includes potentially world class tight gas resources.
The company’s goal is to deliver material benefits to its shareholders, the State of Western Australia, the Traditional
Owners of the areas in which it operates, and the Kimberley community, by successfully exploring for and developing
the petroleum resources of the Canning Basin in an environmentally and culturally sensitive manner.
Competent Persons Statement
Information in this release related to exploration and production results and petroleum resources is based on
information compiled by Eric Streitberg who is an employee of Buru Energy Limited. Mr Streitberg is a Fellow of the
Australian Institute of Mining and Metallurgy and the Australian Institute of Company Directors, and a member and
Certified Petroleum Geologist of the American Association of Petroleum Geologists. He has over 40 years of relevant
experience. Mr Streitberg consents to the inclusion of the information in this document.
2
ASX Release
Ungani Far West 1
PERMIT
The Ungani Far West 1 well is located in production license permit L21, 97
kilometres to the east of Broome and 3.3 kilometres west of the Ungani Oilfield.
WELL LOCATION
Latitude:
Longitude:
BURU ENERGY’S INTEREST
Buru Energy Limited holds a 50% interest in the well
DATE OF PROGRESS REPORT
06:00 hours, 30 November 2015 (AWST)
PROPOSED TOTAL DEPTH
Maximum 2,600 metres
CURRENT DEPTH
95 metres
PROGNOSED TIME TO COMPLETION
48 days
SPUD DATE
10:30 hours, 28 November 2015 (AWST)
DAYS SINCE SPUD
2 days
CURRENT TARGET FORMATION
The primary well objectives are conventional hydrocarbons in the Laurel lower
(Ungani Dolomite) section.
OPERATIONS SINCE LAST PROGRESS
REPORT
Drilling operations commenced at 10:30 hours, 28 November 2015 (AWST). As at
06:00 hours today, the well was drilling ahead in 311mm 12 ¼ inch hole at a depth
of 95m.
HYDROCARBON INDICATIONS
None - None expected.
FORWARD OPERATIONS
Set conductor and drill ahead to first casing point.
170 59’ 58.9” S
1230 08’ 03.7” E
Ungani Far West 1 Location Map
3
Easting: 514,225 m
Northing: 8,009,842 m
Share your feedback
Discover