Weekly Drilling Report - Victory 1
Released
Released
Announcement PDF
ASX Release
ABN 71 130 651 437
Level 2, 88 William Street
Perth, Western Australia 6000
Ph: +61 8 9215 1800
Fax: +61 8 9215 1899
www.buruenergy.com
8 October 2015
Weekly Drilling Report Victory 1 Exploration Well
Buru Energy Limited (Buru Energy) provides the following weekly update on drilling operations at the Victory 1 well as
at 06:00hrs, 8 October 2015 (AWST).
Since the last progress report, the well has been drilled ahead in 6-1/8” (156mm) hole to a depth of 1,893 metres,
wireline logs have been completed and 5-1/2” (140mm) casing is currently being run prior to drilling ahead in 4-3/4”
(121mm) hole into the prognosed primary objectives.
Victory 1 is located in exploration permit EP 457, 185 kms east of Broome and 85 kms southeast of Buru Energy’s
producing Ungani Oilfield. Equity and contributing interests in the well are as follows:
Company
Buru Energy
Mitsubishi Corporation
Rey Resources
Equity Interest
37.5%
37.5%
25.0%
Contributing Interest
41.67%
41.67%
16.67%
Visit www.buruenergy.com for information on Buru Energy’s current and future activities.
For inquiries please contact Buru Energy:
Telephone:
+61 8 9215 1800
Freecall:
1800 337 330
Email:
info@buruenergy.com
About Buru Energy
Buru Energy Limited (ASX: BRU) is a Western Australian oil and gas exploration and production company headquartered in Perth with an
operational office in Broome. The Company’s petroleum assets and tenements are located onshore in the Canning Basin in the southwest
Kimberley region of Western Australia. Its flagship high quality conventional Ungani oil field project is owned in 50/50 joint venture with
Mitsubishi Corporation. As well as Ungani, the Company’s portfolio includes potentially world class tight gas resources. The company’s goal is
to deliver material benefits to its shareholders, the State of Western Australia, the Traditional Owners of the areas in which it operates, and the
Kimberley community, by successfully exploring for and developing the petroleum resources of the Canning Basin in an environmentally and
culturally sensitive manner.
Competent Persons Statement
Information in this release related to exploration and production results and petroleum resources is based on information compiled by Eric
Streitberg who is an employee of Buru Energy Limited. Mr Streitberg is a Fellow of the Australian Institute of Mining and Metallurgy and the
Australian Institute of Company Directors, and a member and Certified Petroleum Geologist of the American Association of Petroleum
Geologists. He has over 40 years of relevant experience. Mr Streitberg consents to the inclusion of the information in this document.
1
ASX Release
Victory 1 Weekly Drilling Report
PERMIT
The Victory 1 well is located in exploration permit EP 457, 185 kilometres to
the east of Broome and 85 kilometres southeast of the Ungani Oilfield.
WELL LOCATION
Latitude:
Longitude:
BURU ENERGY’S INTEREST
Buru Energy Limited holds a 37.5% interest in the well
DATE OF PROGRESS REPORT
06:00 hours, 8 October 2015 (AWST)
PROPOSED TOTAL DEPTH
Maximum 2,600 metres
CURRENT DEPTH
1,893 metres
PROGNOSED TIME TO COMPLETION
33 days
SPUD DATE
9 September 2015
DAYS SINCE SPUD
29 days
CURRENT TARGET FORMATION
The primary well objectives are conventional hydrocarbons in the Laurel lower
clastics and carbonate (Ungani Dolomite); and Upper Devonian (Nullara)
carbonates.
OPERATIONS SINCE LAST
PROGRESS REPORT
Since the last progress report, the well has been drilled ahead in 6-1/8”
(156mm) hole to a depth of 1,893 metres, wireline logs have been completed
and 5-1/2” (140mm) casing is currently being run prior to drilling ahead in 43/4” (121mm) hole into the prognosed primary objectives
HYDROCARBON INDICATIONS
Minor hydrocarbon indications were noted in what are interpreted from
wireline logs to be tight sands of the Grant Formation. The significance of
these shows will be fully evaluated once the well is completed.
FORWARD OPERATIONS
Once current casing operations are completed the well will be drilled ahead in
4-3/4” (121mm) hole into the prognosed primary objectives.
180 15’ 10.0” S
1230 55’ 37.1” E
Victory 1 Location Map
Easting:
Northing:
597,994 m
7,981,599 m
Atlas Rig #2
2
Share your feedback
Discover